Enrique Gómez Martín

Enrique gómez martín

bookmark on deepenrich
location of Enrique Gómez MartínSantander, Cantabria, Spain
Phone number of Enrique Gómez Martín+91 xxxx xxxxx
Followers of Enrique Gómez Martín754 followers
  • Timeline

    Jun 2013 - Aug 2014

    MEP Site Engineer

    Obrascón Huarte Laín, S.A. (OHL)
    May 2015 - May 2017

    Project Coordinator

    ARANER
    Aqaba, Jordania
    Current Company
    Aug 2017 - now

    Plant Manager - North Spain

    Air Liquide
    País Vasco & Cantabria, España
  • About me

    Plant Manager en Air Liquide

  • Education

    • Università degli studi di bergamo

      2010 - 2011
      Mechanical engineering

      Erasmus program

    • Universidad de las palmas de gran canaria

      2007 - 2013
      Meng industrial engineering
  • Experience

    • Obrascón huarte laín, s.a. (ohl)

      Jun 2013 - Aug 2014
      Mep site engineer

      Construction of Sidra Medicine (Budget: 1.800m €).Engineer responsible for the construction and site development for the HVAC, plumbing and low voltage systems of a surface of 7000m2 of the hospital building.- Hierarchically leading a team of 3 engineers and functionally coordinating more than 100 workers.- Production control, coordination between different facilities and work teams.- Technical support for electrical low voltage, HVAC, plumbing, drainage and fire fighting.

    • Araner

      May 2015 - May 2017

      District Energy Plant at Ayla Marina Village. Aqaba, Jordan (Budget: 9m €)Design and construction of a 21MWt cooling and 1 MWt heating system. Person in charge for the project development, technical requirements completion and schedule accomplishment (functionally coordination of a team of 6 to 10 engineers). Detailed Engineering design, coordination between all engineering disciplines (electrical, mechanical, I&C, civil, process, QA/QC and procurement), negotiation and technical discussions with sub-suppliers, technical and economical discussions with main Contractor and owner.Design, development and construction of an innovative 7MW chiller machine (R-134a centrifugal compressor and direct sea water condenser). Checking of technical compliance, drawing review and coordination with factory. Show less Technical support for Commercial and R&D departments.- Conceptual design and process definition for industrial refrigeration projects.- Technical studies for new systems and products development.- Main equipment selection: Screw and centrifugal compressors, pumps, air coolers, dry condensers, heat exchangers, cooling towers.- Technical discussions with providers.Training of graduate engineers. Teaching process definition, design and main equipment selection for a cooling plant. Group of 8 graduate engineers. Start up and commissioning for The Farah Hospital refrigeration system. Amman, Jordan. Show less

      • Project Coordinator

        Apr 2016 - May 2017
      • R&D Engineer

        May 2015 - Apr 2016
    • Air liquide

      Aug 2017 - now

      Responsible for the Large Industries Production Plants located in the North Spain Area, leading the plants team and directing all plant functions to ensure production, maintenance, reliability, quality and safety. The scope includes:- 1 300bar hydrogen filling center - 1 Steam Methane Reformer for hydrogen production- 1 Cryogenic Distillation plant for nitrogen production- 1 Cryogenic Distillation plant for oxygen production- 1 Vacuum Swing Adsorption plant for oxygen production Show less 10/2020 - 04/2021. Owner Project Manager within Large Industries Direction. Responsible for the development, construction and execution of the electrical HV system, steam, hydrogen and natural gas piping in the construction of an Steam Methane Reformer (total project budget: 120m €, managed budget: 25m €) - Project canceled -.02/2019 - 04/2019 (Grenoble, France). Execution Management Plan for the Commissioning phase of the largest Liquid Helium Cryoplant ever built, for the International Thermonuclear Experimental Reactor (ITER).08/2017 - 10/2020. Strategic Project Management within Industrial Merchant Direction. Transformation & OptimizationResponsible for the development phase of strategic projects (technical requirements definition, business case and profitability analysis, strategy and execution management plan definition)o Analysis of Renewable Hydrogen and CO2 production technologieso Hydrogen compression and purification plantso Hydrogen bulk logistics optimization for Spain and Portugallo Cylinders and bundles hydraulic tests strategy transformation for Spain and Portugalo Structural and organizative transformation projectsPMO for Transformation & Optimization Program Show less

      • Plant Manager - North Spain

        Jul 2021 - now
      • Project Manager

        Aug 2017 - Jul 2021
  • Licenses & Certifications

    • Member & mentor

      Nova talent
      Aug 2019
    • Entrepreneurship: launching an innovative business

      University of maryland
      Sept 2018
    • Project management advanced

      Air liquide
      May 2018
    • Yellow belt - continuous improvement

      Air liquide
      Apr 2018