    Planning & Cost Control Manager at SH Organization Ourhoud (Sonatrach/Cepsa/Anadarko/Eni/Maersk/Pertamina/Tal

  • Education

    • Science & Technology Institute – TEBESSA / ALGERIA - June 1990.

      1985 - 1990
      Degree of Industrial & Civil Construction State Engineer Structural & Civil engineering I.C.C. Engineer
  • Experience

    • Entreprise de Construction Ouargla (ECO - URO)

      Nov 1990 - Aug 1995
      Construction Project Manager
    • Sonatrach

      Aug 1995 - Nov 2000
      Senior Project Engineer
    • SONARCO (Joint Venture between British Petroleum and Sonatrach)

      Jan 2000 - Jan 2011

      - Leading a multidisciplinary engineering and construction site team of team leaders/coordinators, engineers, and superintendents/supervisors/QA-QC inspectors; MOC administrators, DOC and Cost controllers, forming the operation project team (OPT), within an internationally work environment.- Participating on operations management staff meetings, overseeing and discussing all company operations, HSE, and project activities; SCM activities, IT/ IS, and other issues on a daily basis.- Monitoring the company’s project dossiers/packages involving scope of new facilities and Brownfield modifications to support additional production, along with upgrades of safety and systems; mainly for pressure piping systems, custom-made vessels ,and other mechanical/electrical equipment stuff(Material: metallurgical: manufacturing process, compliance & conformity, and FAT; WPSs, PQRs, and Hydro test procedures approval; DWGs approval for implementation, etc.); and all the correspondences for endorsement by the regulatory bodies: ARH, DEM, ONML, ENACT, CTC, etc.- Reinforcing the company policies & promoting a culture of safety first and environmental awareness- Liaising with the SCM department on the procurement, ordering, and delivery of material and Equipment.- Contracts accountability (CAM) and performance management.- Carrying-out: SOW definition/MOC; Cost control/Scheduling, Resources/Workforce management; Risk assessment, Quality aspects for SWPs & WOs to maintain the project variation control system.- Conducting projects execution progress calls and meetings.- Interfacing with operations to ensure successful completion of projects goals and set objectives.- Developing excellence in cost-effective and timely completion of project’s deliverables;Verifying committed, spent cost, and accrual value; checking cash flow projections.- Handling the negotiation of contractual claims.- Close-out: Work Certification; Commissioning; Lessons learned and Integration. Show less - Applied the key role in setting up the company work plans review & supervision from the prefabrication stage to the onsite construction, quality, and inspection activities. basically ,conversant with international standards such as : ANSI/ASME B31.3, B31.4, 31.8; API 5L, API RP1102, API1104, API 6D, API 598, API 600, API 602, API 650, API 653 ; ASTM standards; ISO standards; NACE MR01-75; - Construction management of contracts and personnel in all disciplines for the delivery of projects; Organised the overall execution and control of the workload of the construction team, covering the Multidisciplinary works (PL/Piping-Vessels, Civil-Structural, and Electrical-Instrument) vs. objectives. - Reviewed vendor, installation/construction contractors AFC DWG`s, and material take-offs prior to plan the implementation of the SOW. Developed sub projects (SWP`s) execution plans (WBS/PEP).- Co-ordinated with the construction disciplines who will prepare and issue deliverables such as material requisitions, new purchase requisitions, and technical bid evaluations as required for all the procurement and construction activities, which are reviewed and monitored on a regular basis.- Interfaced with SCM and Subcontractors to review the status of activities and take actions as needed.- Advised team members and increased their awareness of quality and PP compliance against SOW. - Performed site visits, including preparation of site visit reports to resolve the raised site queries in order to be discussed with the engineering and expediting teams as required to arrive at workable solutions for site as well as the identification of necessary preventive or corrective HSE actions. - Performed implementation excellence in all the upgrade/modifications and new installations within the field, plants, and camps work areas. Show less

      • Operations Project Team Manager

        Jan 2005 - Jan 2011
      • Construction & Work Control Team leader

        Jan 2000 - Jan 2005
    • SH Organization Ourhoud (Association between: Sonatrach/Cepsa/Anadarko/Eni/Maersk/Pertamina/Tal

      Jan 2012 - now
      Planning & Cost Control Manager

      Reporting to the General Manager and in charge of developing, implementing, and managing the budget and planning of the Company’s DSWO (Drilling/WO, Subsurface, Wells Services, and Ongoing Operations) and Surface’s project activities. Overall monitoring and direction of the cost control function, risk management and issuing the required reports to all partners on a regular basis; Tracking and providing information to allow proactive and accurate reporting including scheduling analysis (EOT) and change control (CO). Sharing Accountability with functional managers to ensure that any activity is controlled in terms of planning, budget, and SOW limit aiming the delivery of the project in total compliance. Acting as the key interface between the unit's internal functions (finance, procurement, engineering, HSE, and Operations) and the Governmental bodies on the approval of the annual work plans and its associated budget. My principal accountabilities are:Delivers cost management functions through establishing cost baseline, preparation of yearly budget and its associated work program in alignment with the plan of development. Production of estimated costs (OPEX & CAPEX) with regards the following: PERSONNEL’s COSTS, GENARAL SERVICES, WELL SERVICES (Well Testing; Coiled Tubing Services; Slickline work; Pumping Services; Production Loggings; Zonal Isolation; Electric Logging; Well Head maintenance-Greasing; Perforations; Sand Control; Stimulations, etc..), MAINTENANCE & IN--SPECTIONS, CONSUMABLES for the provision of monthly closure and cash flow forecasts. Monthly cost & progress reports (Deviations Explications) submission and distribution.Issuing the Dash Board report with the organization’s KPI on a monthly basis.Control of budget, assessment of value of work done and preparation of monthly closeout. Carries out all company's business operations such budget validation, work plan approval and seeks partners & government approvals. Show less