Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)

Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)

Site Engineer

Followers of Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)192 followers
location of Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)شمال الشرقية Wilayat Ibra عمان

Connect with Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET) to Send Message

Connect

Connect with Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET) to Send Message

Connect
  • Timeline

  • About me

    Sr.Projects Engineer in WSP-Middle East

  • Education

    • Sawan Public School

      1989 - 1991
      8th PCM and scial Studies
    • Rajiv Gandhi Prodyogiki Vishwavidyalaya

      1997 - 2001
      Bachelor of Engineering - BE Electrical Engineering
    • Shobhit University

      2013 - 2015
      Master of Business Administration - MBA Finance, General
    • Birla Institute of Technology and Science, Pilani

      2016 - 2018
      Master of Technology - MTech Quality Management
  • Experience

    • Paschimanchal Electricals,,

      Jul 2001 - Aug 2003
      Site Engineer

      The project entailed Site supervision of construction activities pertaining to 11 kV and 440 V Rural Electrification Projects; including erection, testing and commissioning of Distribution and pole mounted Transformers, double pole structures, Isolators, AB switches, Energy meters, Lightning Arresters and other associated

    • East West Engineering & contractor company

      Sept 2003 - Oct 2006
      Project Engineer

      Client : Uttar Pradesh Cooperation Limited (UPCL)Project : Construction of 33/11KV Outdoor SubstationResponsible For ; Construction of Earth Mating of the substation ; Installation and commissioning of 33KV and 11KV bus bar and bay system with Rabbit conductors ; Commissioning and testing of two nos. of 5MVA transformer which include – winding resistance, winding ratio, vector group testing, insulation resistance ,oil breakdown test, Buchhol Relay operation etc; Commissioning and testing of 33KV and 11KV switchgear which integrate –current Transformer (CT),Voltage Transformer (VT), Isolators, Circuit Breaker, Air Breaker (AB) switch ,lighting Arrester (LA) and finally handing over of the substation to the Client.Rural ElectrificationSelection of the route for 11KV over head line; Erection of 8.5 m PCC pole; Stringing of AAA weasel conductors over the length of 150Km; Planning and programming for the site work; Maintaining the site store and keeping the records of all the materials; Commissioning and testing of pole mounted transformer; Documentation for the work and invoice and client coordination عرض أقل

    • Gammon Construction Limited

      Nov 2006 - Feb 2008
      Project Engineer

      Surveyed 415 nos. of the villages; involved in preparation of bill of materials based on the conducted survey, such as –No. of PCC pole required for the project, length of weasel conductor, nos. of disc and pin insulators, fabricated steel items, etc.; Electrical inspection of the village which integrate –commissioning and testing of 11KV overhead line, commissioning and testing of transformers, guarding of 11 KV overhead line inside the villages, Testing of Arial Bunch cable, Checking the earthing of the Transformer, Installation of Energy meter, Installation of Air breaker switch and its earthing system. Achievement1. Manage the Political -Socio and Cultural emotion of the area. عرض أقل

    • Vijai Electricals Limited, Hyderabad

      Mar 2008 - Nov 2008
      Construction Manager

      Client : Madhay Pradesh Electricity Company-IndiaProjects : Expansion and Reinforcement of High Voltage Distribution System (HVDS) in Tikamgarh, Madhya Pradesh –(India)Responsible For :Carried out the survey of 11KV outgoing feeder that originates from 33/11KV substation. Commissioning and testing of 16KVA and 25 KVA of more than 230 transformer; Preparation of Estimate for the entire feeder which include all electrical equipment such as transformers, weasel conductors, energy meters, and mild steel fabricated items and submission to the client; Arranging the shut down from the substation for the smooth execution of work; Materials Planning, execution of work, Preparation of Progress report and Bills, coordination with different unit of the organization and the client. Rural Electrification under the Project Rajeev Gandhi Gramin Vidhuti Karan Yogana (RGGVY) –Sidhi, M.P.Carrying out the survey of 716 nos. of the villages which involved the existing infrastructure of the 11KV route, the condition of the weasel conductors; load of villages, transformer capacity; The survey further include proposed 11KV line, replacement of the old weasel conductors, extension of the LV cable line in the new area, distribution of the load with respect to the existing one and proposed one, Proposal for the Installation of 16KV and 25KV three phase transformer; The survey also integrate the finding out the Below Poverty line (BPL) Population residing in the villages, collecting documentary detail from the Govt. Dept. and proposing the LV connection to them Replacement of 3.15 MVA transformer to 5 MVA; & Oil Circuit Breaker to Vacuum Circuit Breaker; Extension of the panel for outgoing feeder; Survey of the existing substation and proposing it extension to the client for further approval.Achievement1. Exposed to the Team Management2. Improved the decision Making Process on site.3. Experience as head for Establishing the coordination with the Client and other stakeholders. عرض أقل

    • Parsons Brinckerhoff

      Dec 2008 - Jun 2012
      Asst.Resident Electrical Engineer

      Client-ABU DHABI DISTRIBUTION COMPANYProject-Frame Work Consultancy For Engineering Services to Carryout Construction and Reinforcement Of The Distribution Network in Eastern RegionResponsible For-I Carried out the supervision of the survey of overhead lines, HV & LV cable route, reviewing the preparation of shop drawing, preparation of overhead line schedule listing all equipment required for each pole, submittal of all the required documents and obtained its approval. Responsible for installation, testing and commissioning of 11KV and LV cable,11KV Overhead lines, pole mounted transformer on 10.5M and 14M high H-pole, 11KV joints, indoor termination and 415v joints and termination, Tee Ring Main Unit (TRM) / Quad Ring Main Unit (QRM), GRP Consumer unit ( Feeder Pillar) comprising of MCCB and three phase Energy Meter and interconnection wiring, and witnessing the testing of TransformersAchievement: 1. Design & Review and Execution experience of GULF OHL Line, especially wooden pole.2. Design & Review and Execution experience of 33KV cable and Fiber optics.3. Worked in Integrated Management SystemClient : Abu Dhabi Water & Electricity Authority-UAEProject: Consultancy Service For Expansion and Reinforcement of 33KV Network in AlAin -UAEResponsible For-erection, commissioning and testing of 60KM of 33 KV HV underground cables along 144 core Fiber Optics Cable to the route length of 90KM and giving approval to certify that the work has been done in accordance to the specification and Client requirement. I am also doing the Site review of survey, trial pit excavation and finding, horizontal directional drilling, trench excavation, manhole installation, sand bedding, cable management system Client : ABU DHABI WATER & ELECT.AUTHORITYProjects-Western Region Development Program- Augmentation and Expansion of the 33KV network in Western Region of Abdu DhjabiResponsible For -Construction of 42 No. of Distribution substation 11/0.415 KV عرض أقل

    • Dorsch Holding GmbH

      Jul 2012 - Dec 2013
      Electrical Engineer

      Client-Lusail Development Primary Infrastructures –Doha; State of QatarElectrification inside the tunnel is the biggest challenge and I took this challenge in my carrier . I have been reviewing the contractor design based on specification and IFC drawing and giving approval for the electrical lighting layout in the utility tunnel, earthing, fire alarm and emergency lightening layout-fire alarm electronic sounder, linear heat sensor cable, fire alarm control panel, fluorescent emergency light powered by central battery panel; I have been also reviewing Low current system layout include- installation of camera in the tunnel for recognition, deduction and observation purpose completely with power supply unit encoder, signal converter etc., ICT panel, magnetic door contact for manhole cover, phone connection; Electrical Ventilation Fan Room- Light fitting, door contact, smoke and heat detector, Manual call point and fire alarm sounder, emergency telephone set. Beside this I am also responsible for the Traffic Management system which include traffic signaling, street lighting feeder pillar, speed detector camera .I am also responsible for installation testing & commission of 66KV, 11KV &LV cable network in the area, construction and commissioning of 11/0.4KV distribution substation inside the Tunnel.Achievement: 1. Electrical execution experience 200m below from normal ground level.2. Design and execution experience in the tunnel Engineering. عرض أقل

    • Intec - GOPA-International Energy Consultants

      Dec 2013 - Jun 2015
      Assistant Resident Engineer

      Client- Abu Dhabi Distribution company Project-Data Collection of Abu Dhabi Distribution company for their AssetsAs a team leader ,I contributed basically in the three area –Planning/execution &Control & monitoring of the data collection of Assets Management of ADDC which was spread over entire Abudhabi Emirates and covers more than 12000 distribution substation and managing the team of 12 engineers.-Planning Process- I am preparing the Plan schedule as defined in Inspection Sequence provided by ADDC, Release of work order and Bar code on or before time, facilitating the logistic support to site Engineers such as Hard copy of all inspection format, Invoice sheet inspection sticker, stationary, Items ,First Aids Kits and other safety device in advance, Apply for Competency Certificate for the Site EngineersExecution Process includes- I am Defining the job that need to be carried out at the site and in Maximo software .I am Providing Training to the new site Engineer at the site & Managing all Company resources for execution of work such as Tablet, Partial Discharge Device, Thermal Camera, Handling unit and their Charger, ladders, company handbag, and Relay Tester Device provided by ADDC. I am also generating the Project Data such as daily Progress report, Cumulative Progress and Monthly Progress Report and also organizing the meetings with the internal staffs and client from time to time.Monitoring And Controlling Process - I am Tracking the Project work on daily basis such as obtaining Daily Progress Report from all site Engineers and Maximo Team( who are working in the software for the data entry received from the site Engineer), .Reviewing and Regulating the progress to meet the performance objectives Defined in the Project Management Plan . I am also managing and doing Resource Leveling, schedule, Compression Technique such as Crashing & Fast Tracking. Control Cost, Monitoring the Financial status of the project. عرض أقل

    • WSP in the Middle East

      Jul 2015 - now
      Senior Project Engineer

      • Rendered assistance in program management services and support for the many projects, created the program charter and the program management plan with the support and coordination of other leaders in the organization including various teams and departments including the program• Supervised more than 1500 projects/year annually, and provided aid to finalize any outstanding issues, ensure and inspect the material delivered, issue the instructions to the contractors, and supervise the execution as per specification, review weekly and monthly progress, review contractors claim for variation work, provide required assistance to the client and, implementation of safety rule• Successfully achieved and reduced the average project duration which minimized cost and maximized return on investment, reduction in the total return of cable to 1.045%, thereby reducing cost and maximizing return on investment• Reduced the cable cut pieces by 50% from the previous year, improvement of value of work done to achieve and achieve an increase of 90%, delivering more value and maximizing return on investment, project completion on time without delay for 95% of projects with improved projects execution that maximized return on investment• Managed to improve, resolve the site objections in quick manager making issue management and compliance a faster and smoother approach, minimized risks and achieved more efficient processes and a mindset and a culture of Health and Safety• Rendered Consultancy Services for Providing Project Management Engineers for Electrical Projects; provided safe, reliable, and sustainable electricity defined by Authority of Electricity Regulation (AER) in OmanReviewed the risk register qualitatively and created a ranking and scoring of the risks and maintained a Risk Register and a risk watch list; Risk Register عرض أقل

  • Licenses & Certifications

    • Chartered Engineer

      Confederation of Engineers-Inida
      Jan 2019
    • Project Management Professional (PMP)

      Project Management Institute
      Dec 2020
    • Certified Member (CM)

      Institution of Engineering and Technology (IET)
      Jan 2016
  • Honors & Awards

    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      Certificate of Appreciation MAZOON ELECTRICITY COMPANY -OMAN ديسمبر ٢٠٢٠ The Appreciation Certificate given by the MZEC for managing more than 1500 Extension Project in Sharqiyah Governorate.
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      The Leadership Award MAZOON ELECTRICITY COMPANY ديسمبر ٢٠١٨ The Award was given by Extension Management for scrupulous Performance and commitment in achieving the excellency in MZEC Extension Projects. The recognition is given for dedication , determination and professionalism which help in developing MZEC Project Team in Quality HSE & Project Management in an eminent degree.
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      People and Project Awards 2018 WSP نوفمبر ٢٠١٨ As The Oman Team , we won the Award in 2018 for Consultancy Services for Providing Project Management Engineers for Electrical Projects to Mazoon Electricity Company-Oman
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      Appreciation Certificate MAZOON ELECTRICITY COMPANY أكتوبر ٢٠١٨ Recognized by MZEC CEO for improving operational performance, customer service, health & safety performance, and to ensure economic investment and efficient utilization of the assets. The MZEC also recognized our services for improving the competency and commitment of the employees , ushering the Quality Management System & achieving the overall performance and laying the foundation for sustainable development growth. MZEC also appreciated for addressing the risk and opportunities ,bring… عرض المزيد Recognized by MZEC CEO for improving operational performance, customer service, health & safety performance, and to ensure economic investment and efficient utilization of the assets. The MZEC also recognized our services for improving the competency and commitment of the employees , ushering the Quality Management System & achieving the overall performance and laying the foundation for sustainable development growth. MZEC also appreciated for addressing the risk and opportunities ,bring the uniformity in the structure ,alignment of documentation, demonstration of leadership and commitment, engagement of stakeholders & shareholders, improve the process approach ,& develop the relationship management. عرض أقل
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      ENGINUITY 2 018 VIRTUAL MANAGEMENT SIMULATIONS -UK يوليو ٢٠١٨ Scored 1st Place in the Middle East & Asia and 11th Placed in the World -Team "WSPME Focus"The Global Business Management Competition for the Construction IndustryNearly 200 Teams From Around The World Took Part
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      People And Projects Awards WSP ديسمبر ٢٠١٧ The Award was given by Project Director-Middle East for the outstanding performance among the middle east team
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      APPRECIATION CERTIFICATE MAZOON ELECTRICITY COMPANY-OMAN نوفمبر ٢٠١٧ The Reorganization was given by Sharqiyah Management for achieving a. Enhancing MZEC HSE culture and complying with HSE rules & requirements. b. Introducing Total Quality Management System.c. Compliance with ISO and Auditing observations.d. Reducing the work load on existing department employees.e. Raising the level of satisfaction of stakeholders/ shareholders.f. Achieving MZEC vision through its mission and strategyg. Development of carrier path for the exiting… عرض المزيد The Reorganization was given by Sharqiyah Management for achieving a. Enhancing MZEC HSE culture and complying with HSE rules & requirements. b. Introducing Total Quality Management System.c. Compliance with ISO and Auditing observations.d. Reducing the work load on existing department employees.e. Raising the level of satisfaction of stakeholders/ shareholders.f. Achieving MZEC vision through its mission and strategyg. Development of carrier path for the exiting MZEC extension projects employees. عرض أقل
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      Certificate of Achievement MAZOON ELECTRICITY COMPANY ديسمبر ٢٠١٦ The Award was given By Sharqiyah management a) Managing More than 1500 Extension project/ Yearsb) Developing the Communication Managements and protocol c) Developing the process of investment decision during survey and design stage d) Introducing the archiving of projects documentation e) Analyzing the contract management and developing the process for budget management systemf) Working towards the customer satisfaction g) Team leadership enhancement i) Worked… عرض المزيد The Award was given By Sharqiyah management a) Managing More than 1500 Extension project/ Yearsb) Developing the Communication Managements and protocol c) Developing the process of investment decision during survey and design stage d) Introducing the archiving of projects documentation e) Analyzing the contract management and developing the process for budget management systemf) Working towards the customer satisfaction g) Team leadership enhancement i) Worked for framing the responsibilities matrix for project team. عرض أقل
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      People And Projects Award for Innovative WSP ديسمبر ٢٠١٦ 1.Improving the Reliability of MZEC Network by introducing various methodology and process2. Developing the appropriate tools for Controlling and Monitoring of Projects3. Introducing the appropriate procedure for closing of Projects4. Challenges For Improving The Quality5.Help in developing the quality plan for the contractors.6.Conducting the skill Development Program for the Project Team .7.Introducing the Quality checklist for the contractors 8. Developing the… عرض المزيد 1.Improving the Reliability of MZEC Network by introducing various methodology and process2. Developing the appropriate tools for Controlling and Monitoring of Projects3. Introducing the appropriate procedure for closing of Projects4. Challenges For Improving The Quality5.Help in developing the quality plan for the contractors.6.Conducting the skill Development Program for the Project Team .7.Introducing the Quality checklist for the contractors 8. Developing the list of approved Civil subcontractors 9.Defining the color code and bring the uniformity in color for route marker and earthpit chamber عرض أقل
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      Appreciation Certificate MAZOON ELECTRICITY COMPANY-OMAN نوفمبر ٢٠١٦ Appreciation Certificate given by Senior Management of MZEC for contribution in the following area..1. Project Management2. HSE 3. Quality 4. Development of Process and procedure5.Documentation management 6. Skill development for MZEC Employee7. Conducting training & knowledge sharing Session .
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      Project Management Excellency Certificate GOPA-INTEC فبراير ٢٠١٥ The award was given by Gopa-Managing Director for the following area ..1. Managing Projects for the Etihad Railways Station 2. Data collection for ADDC Projects
    • Awarded to Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)
      Team Leadership Award GOPA Intect ديسمبر ٢٠١٤ The Award was given by GOPA Managing Director for the following works 1. Managing the data collection team ( 20 Engineers) 2. On time reporting and Tracking the Project work on daily basis.3.managing and doing Resource Leveling, schedule, Compression Technique such as Crashing & Fast Tracking. Control Cost, Monitoring the Financial status of the project to update the Project budget.
  • Volunteer Experience

    • Treasurer

      Issued by Board of Directors Indian school Oman on Feb 2018
      Board of Directors Indian school OmanAssociated with Vivek Kumar Srivastava (PMP ,M.Tech MBA BE C.Eng MIET)