  • Timeline

  • About me

    Project Engineer at High Energy Engineering Sdn Bhd (Electrical Consultancy Firm)

  • Education

    • University of Technology Kuala Lumpur Malaysia

      1968 - 1971
      Diploma Electrical Engineering (Power) 2

      Activities and Societies: Swimming, Walking, Movies, Singing & Guitaring Electrical Installation Contractor Licence (EIU)

  • Experience

    • Sarawak Shell Berhad/Sabah Shell Petroleum Corporation

      Jan 1975 - Jan 1995
      Design: Project : Construction : Commissioning & Maintenance Engineer

      Work with Sarawak Shell Bhd (SSB) and Sabah Shell Petroleum Corporation (SSPC) on the oil & gas offshore Platforms, crude oil/gas Terminals and power supply improvement works at the housing and industrial areas in Lutong & Miri,SarawakResponsibilities are as follows:1.0 Sarawak Shell Berhad (SSB)1.1 Electrical Engineer carried out the improvement projects on the Shell 6.6/0.415kV Power Supply & Distribution System to cater for the increase in the Load Demand & various design (F23 etc)1.2 Resident Engineer (E&I) at Fabrication Yards in Mitsubishi HI, Japan & Hyundai HI South Korea1.3 Lead/Electrical Commissioning Engineer Onshore/Offshore on the fabrication of the offshore oil/gas Platforms & Living Quarters at MHHE Johore & Ramunia Fabricator Telok Ramunia, Johore2.0 Sabah Shell Petroleum Corporation (SSPC)2.1 Maintenance Engineer in charge of SSPC Offshore Oil/Gas Platforms at Sabah Waters & Oil/Gas Terminals at Labuan2.2 Electrical Focal Point for SSPC SabahAll the above Activities were complied to the following SHELL requirements:- Shell Design and Engineering Practices (DEP) as per relevant DEP- Shell SMEP Procedures - Work Site Life Saving Rules- Shell EMS EPA -PRO-0001 TO 0012 ( eg EPA-PRO-0006 Construct and Pre-Commissioning.... EPA-PRO-0007 Commission and Handover Facilities)- Shell Group Golden Rules- Shell HSE, Hazop & JHA Procedures- Others Show less

    • Petronas Methanol Sdn Bhd

      Jan 1997 - Jan 2004
      Project/Electrical Engineer

      Responsibilities are as follows:1) Reliability Study on the Electrical Power Generation and Distribution System & associated Instrumentation,Mechanical & Processes of the Plant2) EPCC on the Improvement & Upgrading of the following Projects: - New packaged boiler,c/w piling work, building extension, electrical transformer substation, and 1 no 33kV GIS extension panel etc - Electrical Installation of CCTV and Perimeter Security Lighting , - Electrical Installation of the MFAP with central/remote monitoring and relay signal to BOMBA - Electrical Installation of 2 nos Auma Actuators and 2 nos production fin fan coolers3) Plant 2 yearly Turnaround Planning & Execution (Maintenance & Improvements)4) Master Project SchedulingAll the above Activities will comply to the following PETRONAS requirements:- PTS (Petronas Technical Standards) relevant PTS- 5 QCP (Quality Control Principles)- PTW/JHA Procedures- Others Show less

    • Petra Resources Sendirian Berhad

      Jan 2004 - Jan 2008
      Lead/Electrical Commissioning Engineer

      Responsibilities for the oil/gas Platforms during the fabrication stage at the Fabrication Yards & final stage of Hook Up, Testing, Commissioning and Start Up at Offshore Location are as follows:1) Preparation of the Pre-Commissioning and Commissioning Manual for the various process systems of the platforms2) Testing & Pre commissioning of the various process systems (Process, Mechanical, E & I ) at the Fabrication Yards at Ramunia Fabricator and MMHE Johor Malaysia 3) Hook Up at Offshore Location, Central Luconia, Bintulu for the E8, E11 and F13 oil/gas platforms 4) Testing and Pre - Commissioning with other discipline engineers (Process, Instrument & Mechanical)5) Hazop and Pre Start Up Audit 6) Commissioning with other discipline engineers (Process, Instrument & Mechanical)7) Handover System PackagesAll the above Activities were complied to the following SHELL requirements:- Shell Design and Engineering Practices (DEP) as per relevant DEP- Shell SMEP Procedures - Work Site Life Saving Rules- Shell EMS EPA -PRO-0001 TO 0012 ( eg EPA-PRO-0006 Construct and Pre-Commissioning.... EPA-PRO-0007 Commission and Handover Facilities)- Shell Group Golden Rules- Shell HSE, Hazop & JHA Procedures- Others Show less

    • Rotary Mec Sdn Bhd

      Jan 2010 - Jan 2012
      Project Engineer/Planner

      1) MLNG 2 Bintulu - Petronas Debottlenecking Project E&I Work, Testing & Commissioning for the following items : - 2 nos 45 MW 6.6kV Gas Turbine Generators - 500 KW 415V Emergency Diesel Generator - 10 nos 6.6/11/33/0.415 kV Power Transformer - HV/LV IMCS Main Switchboard - AC/DC UPS - Control Valves, Transmitters, FG Super Heater etc - Fire Fighting System & CCTV - F&G, PS, DCS, GPA/PA, Telecom System etc - Electrical & Instrumentation Work etc2) Brooke Engineering Fab Yard, Kuching - Shell St Joseph Compression Platform Offshore Project E&I Work, Testing & Commissioning for the following items : - 3 nos 3.45 MW 6.6kV Gas Turbine Generator - 1,500 KW 415V Emergency Diesel Generator - 5 nos 6.6/0.415 kV Power Transformer - HV/LV IMCS Main Switchboard - AC/DC UPS - Control Valves, Transmitters, FG Super Heater etc - Fire Fighting System & CCTV - F&G, PS, DCS, GPA/PA, Telecom System etc - Electrical & Instrumentation Work etc - Water Injection Package & VSD - Sea Water Lift Pumps - Electric and Diesel Fire Water Pumps - Jockey, Potable, Diesel Transfer and Chemical Injection Pump - OthersProject Management Processes were utilized for the above Petronas & Shell ProjectsCompliance to the requirements of the Client, BOMBA, CIDB, DOSH, DOE, ISO etcMore Details are available Show less

    • Bormal Engineering Sdn Bhd (JV with Siemens Malaysia)

      Jun 2010 - Sept 2012
      Project Engineer/Planner

      Sarawak Energy Bhd (Client)EPCC 275/132/33 kV Outdoor Electrical Substation & Control Building at Bintulu, SarawakScope of Work (turnkey) includes all design, engineering, procurement, construction, testing and commissioning on the following;- Earth Work- Temporary Road, Drainage and Hoarding- Control Building, Warehouse, Guard House and Switchyard- Infrastructure (road, drainage etc)- Fire Fighting System- Power System 275/132/33kV & 415 V (Transformers, HV/LV Switchboards, DC System etc)- SCADA, Event Recorder and other control systemsProject Management Processes were utilizedCompliance to requirements of the Client, Local Authorities, BOMBA, CIDB, DOSH, DOE, ISO etcMore Details are available Show less

    • Pestech Sdn Bhd

      Sept 2012 - Oct 2019
      Construction Site Manager & Project Controller

      Sarawak Energy Bhd (Client)EPCC 275/33 kV Outdoor Electrical Substation & Control Building at Murum Junction Bintulu and Mapai Kanowit, Sarawak MalaysiaScope of Work (turnkey) includes all design, engineering, procurement, construction, testing and commissioning on the following;- Earth Work- Temporary Road, Drainage and Hoarding- Control Building, Warehouse, Guard House and Switchyard- Infrastructure (road, drainage etc)- Fire Fighting System- Power System 275/132/33kV & 415 V (Transformers, HV/LV Switchboards, DC System etc)- SCADA, Event Recorder and other control systemsProject Management Processes were utilizedCompliance to the requirements of the Client, Local Authorities, BOMBA, CIDB, DOSH, DOE, ISO etcMore Details are available Show less

    • High Energy Engineering Sdn Bhd

      Aug 2019 - now
      Project Engineer

      Site Inspection with relays testing to assess the serviceability and functionality of the Power Supply and the Electrical Installation of the Water Treatment Plant at Tebakang, Sematan, Pusa and Kanowit, Sarawak.The Plant consists of the process which incorporated the use of UF Membrane Technology and automated pump drives (VFD) and Control PanelTechnical Report of Inspection/recommendations and submission of as built Electrical DrawingsCompliance to the requirements of the following:- Electricity Ordinance Sarawak (Electricity Rules 1999), - Suruhanjaya Tenaga Electricity Supply ACT 1990- IEE Regulations Show less