Bahaa Hussein , PMP®Prep.

Bahaa Hussein , PMP®Prep.

Followers of Bahaa Hussein , PMP®Prep.572 followers
location of Bahaa Hussein , PMP®Prep.Egypt

Connect with Bahaa Hussein , PMP®Prep. to Send Message

Connect

Connect with Bahaa Hussein , PMP®Prep. to Send Message

Connect
  • Timeline

  • About me

    Senior Mechanical Engineer at Dar Al-Handasah (Shair and Partners)

  • Education

    • Helwan University Cairo

      -
      Bachelor's degree Mechanical Engineering Good
  • Experience

    • EGYPTIAN ENGINEERING CONSULTANTS CO. ( INFRA GROUP)

      Aug 2008 - Sept 2019

      Porto Islands, Porto El Sokhna @ El Ain El Sokhna.- Owner: PORTO GROUP .- Arch Consultant: ELGABALY ARCHITECTS .- Project Management: Moharram Bakhoum ACE. - Cost: 300,000,000 L.E- Designation: Senior Mechanical Site Engineer.The project consists of Chalets, Swimming Pools, Fountains, and Parking.The Mechanical Works Including:-1-Hvac System: In this Project uses Split Units at each chalet.2-Fire Fighting works:-Fire Fighting Network ( Hose Cabinets) at each floor with Fire Hydrant at the Landscape Area - Co2 system at electrical rooms and FM200 system at IT and server Rooms.3-Plumbing works:Piping network ,Lavatories ,Urinals,WC,s.(Cold, Hot Water Supply, Drainage System and Irrigation System).4-Swimming Pools works:-Seven Pools consists of filters, circulation pumps c/w piping network.My Duties as follows:-- Review all design drawings of all mechanical works.- Supervise of all Mechanical works, HVAC, Fire Fighting and Plumbing Works.- Review all submittals and data sheet for all Mechanical works.- Review all workshop drawings of all Mechanical works, Hvac, Fire Fighting and Plumbing Works.- Supervise and Review of all Pools works. Show less Porto Cairo Medical @ New Cairo.- Owner: AMER GROUP .- Arch Consultant: ELGABALY ARCHITECTS .- Project Management : Projacs International Co. - Cost: 100,000,000 L.E- Designation: Senior Mechanical Engineer at Porto Cairo Medical @ New Cairo.The project consists of clinics , laboratories , Pharmacy ,Fountains and Parking .The Mechanical Works Including:-1-Hvac System:Two chillers 200 TR each - Absorption Type , chilled water pumps c/w piping networks ,Fresh air Fans ,F.C.U,s at all clinics and laboratories ,Pharmacy , Exhaust air fans at toilets and also Jet Fans at Parking for ventilation c/w Axial Tube Fan 54000 CFM . Two Cooling Tower 55 L/S each c/w piping network and pump station , Chemical treatment with dose pumps for condensing water network.2-Fire Fighting works:-Fire Pumping Station (Elec 750 GPM– Diesel – Jokey) and Fire Fighting Network (Sprinkler – Hose Cabinets) - Co2 system at electrical rooms and FM200 system at IT and server Rooms.-Water Tank 300 M3.3-Plumbing works:Booster set ,piping network ,Lavatories ,Urinals,WC,s , Submersible pumps.(Cold, Hot Water Supply, Drainage System and Irrigation System).4- Fountains works:-Two fountains , consists of filtre ,circulation pumps c/w piping network.My Duties as follows :-- Review all design drawings of all mechanical works.- Supervise of all Mechanical works, Hvac, Fire Fighting and Plumbing Works.- Review all submittals and data sheet for all Mechanical works.- Review all workshop drawings of all Mechanical works, Hvac, Fire Fighting and Plumbing Works.- Supervise and Review of all Fountain works. Show less Malvern College School at Egypt @ EL MAADI.- Owner: AZAZY GROUP - FUTURE UNIVERSITY .- Arch Consultant: ELGABALY ARCHITECTS .- Cost: 600,000,000 L.E- Designation: Senior Mechanical Engineer at Malvern College School at Egypt. The project consists of classrooms , laboratories , restaurant , theater , library , GYM hall , swimming pools.The Mechanical Works Including:-1-Hvac System: Three chillers 300 TR each , chilled water pumps c/w piping networks ,Total Fresh A.H.U,s (fresh air treated ),F.C.U,s at all classrooms and laboratories ,A.H.U,s at Restaurant , Theater , library building and GYM hall . 2-Fire Fighting works:- Fire Pumping Station (Elec 1000 GPM– Diesel – Jokey) and Fire Fighting Network (Sprinkler – Hose Cabinets) - Co2 system at electrical rooms and FM200 system at IT and server Rooms. -Water Tank 200 M3.3-Plumbing works:Booster set ,piping network ,Lavatories ,Urinals,WC,s , Submersible pumps.(Cold, Hot Water Supply, Drainage System and Irrigation System).4- Swimming Pools works:-Two swimming pools , Main pool & Kids pool ,My Duties as follows :- - Supervise of all Mechanical works, Hvac, Fire Fighting and Plumbing Works. - Review all submittals and data sheet for all Mechanical works. - Review all workshop drawings of all Mechanical works, Hvac, Fire Fighting and Plumbing Works. - Supervise and Review of all Swimming Pool works. Show less • Design of HVAC and Fire Fighting Works for the following Projects:• Pepsi Factory @6th October City.• Pepsi Factory @ Tanta City.• Pepsi Factory @ Menya City.• Chipsy Factory @6th October City.• Laboratories Building (Measurements and Calibrations of Cairo University).• Preparation of Workshop Drawings of HVAC Works (Economic and Social Building) of Police Academy @ New Cairo. • Preparation of HVAC workshop drawings of MADINATI MALLS – Talaat Mostafa @ New Cairo.• Porto 6th October City. Show less PepsiCo Inc (Pepsi - @ Minya).- Owner: PepsiCo.- Arch Consultant: CDEC.- Cost: 1.000.000 L.E- Designation: Design and Supervision Engineer.The Project Consists of Main Building, Service Building, and Administration Building, Four Product Lines and Warehouses.The Mechanical Works Including:-1-Hvac System:Two DX Air Cooled – 240 T.R Each, A.H.U.s for Public Area, Wet Area and F.C.U.s for Offices, Fans for Ventilation at Dray Area and Split Unit for IT Rooms and Server Rooms. Show less PepsiCo Inc (Chipsy Factory -@ 6th October).- Owner: PepsiCo.- Arch Consultant: Al Hosny.- Cost: 200.000.000 L.E- Designation: Engineering Construction Manager.The Project Consists of Main Building, Service Buildings, and Two Administration Building, Seven Product Lines and Warehouses.The MEP Works Including:-1-Hvac System:Four Chiller Air Cooled – 300 T.R Each & Chilled Water Pump Station, Chilled Water Network, A.H.U.s for Public Area and F.C.U.s for Offices, Fans for Ventilation and Split Unit for IT Rooms and Server Rooms.2- Fire Fighting System:Fire Pumping Station (Elec 2500 GPM– Diesel– Jockey) and Firefighting Networks (Sprinklers – Hose Cabinets) - Co2, FM 200 & Chemical System.3-Plumbing Works:(Cold, Hot Water Supply, Drainage System) Show less Coral Sea Sensatori Hotel,Resort @Sharm El Sheikh.- Owner: Wings Tours.- Arch Consultant: Karim El Haiwan.- Cost: 500.000.000 L.E.- Designation: Design and Supervision Engineer.The Project Consists of 600 Room, Main Buildings, Service Buildings, Restaurants and Staff Accommodates.The MEP Works Including:-1-Hvac System:Four Chiller Air Cooled – 429 T.R Each & Chilled Water Pump Station, Chilled Water Network, A.H.U.s for Public Area and F.C.U.s for Rooms about (650 Room), Fans for Ventilation and Split Unit for Data Rooms and Server Rooms.2- Fire Fighting System:Fire Pumping Station (Elec – Diesel – Jokey) and Fire Fighting Network (Sprinkler – Hose Cabinet) - Co2 and FM200 system.3-Plumbing works:(Cold, Hot Water Supply, Drainage System and Irrigation System).4-Swimming Pools . Show less EMAK Administration Building .- Owner: Emak, EL Kharafi Group.- Arch consultant: Hatem Hassan.- Cost of Project: 50.000.000 L.E.- Designation: Supervision Engineer.The MEP Works Including:-1-Hvac System:Two Chiller Absorption Systems – 300 T.R Each.Two Cooling Tower, Chilled Water Pump Station – A.H.U.s, F.C.U.s and ventilation System.2- Fire Fighting System:Fire Pumping Station (Elec – Diesel – Jokey) and Fire Fighting Network (Sprinkler – Hose Cabinet) - Co2 & FM200 System.3-Plumbing Works:(Cold, Hot Water Supply and Drainage System). Show less Stock Market Building.- Owner: EGID- Arch Consultant: Magdy NashedNew Administration Building consists of 4000 m2 Basement, Ground & 3 Typical Floors Each 800 m2- Cost of Project: 70.000.000 L.E- Designation: Supervision Engineer.The MEP Works Including:-1-Hvac System:Two Chiller Air Cooled – 250 T.R Each & Chilled Water Pump Station &Air Handling Units, F.C.U’s and Chilled Water Network.2- Fire Fighting System:Fire pumping station (Elec – Diesel – Jokey) and Fire Fighting Network (Sprinkler – Hose Cabinet) - Co2 system.3-Plumbing Works:(Cold, Hot Water Supply and Drainage System Show less

      • Senior Mechanical Site Engineer

        Nov 2017 - Sept 2019
      • Senior Mechanical Site Engineer.

        Jan 2017 - Oct 2017
      • Senior Mechanical Site Engineer.

        Aug 2017 - Sept 2017
      • Senior Mechanical Site Engineer.

        Dec 2014 - Dec 2016
      • Senior Mechanical Design Engineer

        Apr 2014 - Nov 2014
      • Design and Supervision Engineer.

        Sept 2013 - Mar 2014
      • Engineering Construction Manager.

        Jan 2012 - Aug 2013
      • Design and Supervision Engineer.

        Oct 2010 - Dec 2011
      • Supervision Enginer.

        Sept 2009 - Sept 2010
      • Supervision Engineer.

        Aug 2008 - Aug 2009
    • Arkan Consultants

      Oct 2019 - Nov 2019
      Senior Mechanical Engineer

      OZONE Health Care District@ 5th Settlement, Cairo, Egypt.- Owner: Heliopolis Developers Group - HDG.- Main Consultant: ARKAN CONSULTANTS.- Cost: 500,000,000 L.E- Designation: Senior Mechanical Site Engineer.The project consists of Clinics, Pharmacy, Hospital, Shops, Lounge Area and Parking.The Mechanical Works Including:-1-HVAC System: VRF System for all Public areas, main corridors, and entrance with various cooling capacities.2-Fire Fighting works:-Fire Pump Station (Elec Pump 1000 GPM, Deisel Pump 1000 GPM and Jockey Pump 50 GPM)Fire Fighting Network ( Sprinklers and Hose Cabinets) at each floor with Fire Hydrant at the Landscape Area - Co2 system at electrical rooms and FM200 system at IT and server Rooms.3-Plumbing works:Booster Set, Piping network, Lavatories, Urinals and WC,s.(Cold, Hot Water Supply, Drainage System and Irrigation System).4-Fountains works:-Fountains consist of filters, circulation pumps c/w piping network.My Duties as follows:-- Review all design drawings of all mechanical works.- Supervise all Mechanical works, HVAC, Fire Fighting and Plumbing Works.- Review all submittals and datasheets for all Mechanical works.- Review all workshop drawings of all Mechanical works, HVAC, Fire Fighting and Plumbing Works.- Supervise and Review of all BMS works.- Supervise and Review of all Fountain's works. Show less

    • Dar

      Dec 2019 - now

      East Port Said @Port Said, Egypt.- Owner: Suez Canal Container Terminal (SCCT), Maersk’s and APM Terminals'.- PMC Consultant: Dar Al-Handasah (Shair and Partners).- Designation: Senior Mechanical Engineer.The project aims to expand the existing SCCT facility (a joint venture container terminal with APM Terminals as majority shareholder) at Port Said East Port, by adding a new 955m berth and a new 510,000 m2 container handling yard. The terminal is currently operating with a berth length of 2,400m and a handling yard of 1.2 million sq. m and is the main operator in Port Said East Port.My Duties are as follows:-- PMC & Review all Mechanical design drawings of all Mechanical works of the Yards.- Supervise and Review all Sewage Lift Stations and Oil separator storm stations.- Review all submissions and datasheets for all Mechanical works.- Review all workshop drawings of all Mechanical works.- Supervise and Review all, HVAC, Firefighting, and Plumbing works.- Supervise and Review all piping networks ( Potable Water, Irrigation Water, Force Main, and Sewerage network ). Show less East Port Said Industrial Area @Port Said, Egypt.- Owner: SCZONE – General Authority for Suez Canal Economic Zone.- Main Consultant: Dar Al-Handasah (Shair and Partners).- Designation: Senior Mechanical Engineer.The project is a landmark industrial area of 1,600 ha located in East Port Said Industrial Zone.The scope of services includes concept master planning for the whole site area, final master planning for Phase 1 area (400 ha), preparation of planning guidelines, marketing materials, site grading, traffic study, and concept design for 80 km of roads and infrastructure utilities in the area called Phase 1 (potable water & firefighting systems, sewerage system, irrigation network, stormwater drainage, street lighting, power distribution network, telecommunication network, and landscaping).My Duties as follows:-- Review all Mechanical design drawings of all Lift Stations and Sewage Treatment Plant.- Supervise and Review all Lift Stations and Main Water Treatment Plant.- Review all submitting and datasheets for all Mechanical works.- Review all workshop drawings of all Mechanical works.- Supervise and Review all, HVAC, Firefighting, Plumbing, BMS works.- Supervise and Review all piping networks ( Potable Water, Irrigation Water, Force Main, and Sewerage network ). Show less

      • Senior Mechanical Engineer

        Sept 2024 - now
      • Senior Mechanical Engineer

        Dec 2019 - Jan 2025
  • Licenses & Certifications

    • Autodesk Revit MEP Certified Professional Certification

      Autodesk Authorized Training Center | ATC
      Mar 2011
    • PMP® Certification Training Course

      PMP Exam Prep Handbook
      Aug 2016