Rajesh Naduvakkatt Kalam

Rajesh naduvakkatt kalam

bookmark on deepenrich
location of Rajesh Naduvakkatt KalamUnited Arab Emirates
Followers of Rajesh Naduvakkatt Kalam160 followers
  • Timeline

  • About me

    Mechanical Engineer - Construction at Emirates Global Aluminium (EGA​)

  • Education

    • Bangalore university

      1992 - 1996
      Bachelor of mechanical engineering mechanical engineering
    • University of leicester

      2003 - 2005
      Master of business administration - mba marketing
  • Experience

    • Snc-lavalin

      Aug 2006 - May 2018

      Package Engineer Mechanical - 2014:DX+ ULTRA Project for Dubai Aluminium Smelter, EGA Jebel Ali Site and RTR Rehabilitation Project.Package Engineer Mechanical 2013 to 2014: Construction of Liquid Pitch Tank#3 at DUBAL Dock Facility as part of EMAL Phase II Project, Dubai Aluminium.Package Engineer-Mechanical – 2012 – 2013:Potline-6 Crane Rail Replacement Project at the Dubai Aluminium Smelter, EGA Jebel Ali Site.Package Engineer-Mechanical – 2012: Executing the 7nos of existing D18 pots replacement with the new D18+ Technology Pots at the Dubai Aluminium Smelter, EGA Jebel Ali Site. Preparation of Small Tools Package for EMAL Phase-II project; Dubai North Casting Station Replacement Project; Feasibility Study for the replacement of all D18 pots with D18+ pots.Preparation of Dubal Technology Drawings for ALBA Potline-6 ExpansionPackage Engineer 2011 – 2012: Ship Unloader-4 Transfer from Dubal Dock Facility to EMAL Dock Feasibility Study for Replacement of all remaining 513 pots of Potlines 1 & 3 at Dubai Aluminium Smelter, EGA Jebel Ali Site Package Engineer – 2010 – 2011: Fire Detection and Protection System for SBRT56 Rectifier South of Potline 6-Testing and Commissioning.Construction of EMAL South Casting Station and Pouring Car for EMAL Rodding Operations as part of EMAL Phase-1 Upgrade project.Package Engineer – 2009 – 2010: EMAL Tanker Loading Station-H between Alumina Silo-6 & Alumina Silo-8 in Dubal Dock - includes turnkey construction of complete material handling system from Filling on to New Receiving Silo and Loading on To the Alumina Tanker.DX+ Project included the installation of the new Pots, Superstructure, Pot Feed Systems, Fume Ducts & Fan, Cranes with enhanced Dubal Technology.Dubai Aluminium Expansion Projects: Coke Blending Project at Dubal Dock Facility Package Engineer–2007 – 2009: Potlines 4,3,2,1. Construction Coordinator – 2006 - 2007 for the Alumina Storage Silo No.7 at Jebel Ali Free zone. Show less

      • Lead Mechanical Engineer

        Oct 2014 - May 2018
      • Package Engineer - Mechanical

        Aug 2006 - Oct 2014
    • Alucor limited

      Jun 2018 - Jul 2019
      Technical manager

      Successfully Coordinating operations mainly during the Engineering and Production stages for various projects including; Gas Filter Coalescer Vessel Skid –for EXPRO SDX Energy Egypt; Limestone Contactor Pressure Vessels for ACCIONA- DEWA and SWRO Potable Water Tanks for ACCIONA DEWA; Sulphur Granulation Drums for IPCO-Petrofac and preparing technical proposals for various tenders from EGA, RAK Gas

    • Emirates global aluminium (ega​)

      Feb 2020 - now
      Mechanical engineer - construction
  • Licenses & Certifications

    • Project management professional (pmp)®

      Project management institute
      Jan 2025
      View certificate certificate