Rameez Akbar

Rameez Akbar

Internee

Followers of Rameez Akbar3000 followers
location of Rameez AkbarPakistan

Connect with Rameez Akbar to Send Message

Connect

Connect with Rameez Akbar to Send Message

Connect
  • Timeline

  • About me

    Director Finance at Quaid-e-Awam University of Engineering, Sciences and Technology Nawabshah

  • Education

    • Bahria Foundation College

      2004 - 2005
      Intermediate Pre-Engineering
    • V.P.S.S, Jacobabad

      2002 - 2003
      Matriculation Scince A
    • Mehran University of Engineering and Technology Jamshoro

      2011 - 2012
      Master of Engineering (M.Eng.) Power Engineering A

      Electrical (Power) Engineering

    • Quaid-e-Awam University of Engineering, Sciences and Technology Nawabshah

      2006 - 2009
      Bachelor of Engineering (B.E.) Electrical Power Engineering A

      Electrical (Power) Engineering

    • University of Sindh

      2014 - 2016
      Master of Business Administration - MBA Finance, General
  • Experience

    • Civil aviation authority, karachi

      Jul 2008 - Aug 2008
      Internee
    • Siemens

      Jun 2009 - Jul 2009
      Internee
    • SKB Engineering and Construction

      Feb 2010 - Jan 2013
      Site Engineer (Electrical)

      As a Site Engineer, my duties are: Installation and supervision of all Electrical related items, i.e. Conducting network, Wiring, Cabling high and low voltage, Cable trays and cable ladders, Switch gears, HT, LT Panels, and protection System. Manage and assign the duties to staff. Installation, testing and commissioning of H T and LT distribution panels, Control and Protection panels, DBs and JBs etc. Installation, testing and commissioning of distribution Transformers. Installation of cable trays, cable ladder, and bus tie ducts etc. Installation of complete lighting system of power plant.  Installation of below ground and above ground levels earthing system. Installation of indoor and external lighting systems. Installation of VFDs, Battery chargers, batteries and UPS. Laying, termination, testing and commissioning of Power and Control cables. Termination of all types of cables (i.e. HT/LT), Termination of HT cables with transformer, RMS, Heat shrink straight joint of HT/LT Cables. Perform Continuity Test and Insulation Test of Power Cables with megger and DC Hi-pot Test Set. Preparation of project completion schedules, manpower planning and material requirement. Site establishment and management. Installation of Earthing / Grounding system. Installation and testing of MCCs panels & VFDs for HVAC system. Ability to perform Testing of Capacitors (i.e. Continuity Test by AVO Meter and Checking the Amps of Capacitor by Clamp Meter). Ability to perform Testing of Batteries for checking the Specific gravity, Voltages and Amperes of each cell. Show less

    • Sukkur IBA

      Aug 2013 - Jul 2014
      Faculty Member
    • Quaid-e-Awam University of Engineering, Sciences and Technology Nawabshah

      Aug 2014 - now

      Electrical Engineering Department

      • Director Finance

        Feb 2021 - now
      • Assistant Professor

        Aug 2014 - Feb 2021
    • North China Electric Power University

      Jun 2015 - Aug 2015
      Workshop trainee

      renewable energy sources

  • Licenses & Certifications

    • GIS and Remote Sensing Workshop

      QUEST
      Mar 2009