Srinivasan K R

Srinivasan k r

bookmark on deepenrich
location of Srinivasan K RBengaluru, Karnataka, India
Followers of Srinivasan K R89 followers
  • Timeline

  • About me

    Planning Engineer - Envac Environmental Technology Pvt Ltd

  • Education

    • Guhan matric hr. school

      -
      S.s.l.c
    • K.l.n college of engineering

      2000 - 2004
      Bachelor of engineering (be) mechanical engineering first class
    • Sourasthra boys higher secondary school

      1998 - 1999
      H.s.c
  • Experience

    • Maruthi engineering consultants

      Mar 2005 - Apr 2007
      Design engineer

      - Checking and Preparation of Plot Plan, Equipment Layout & Piping GAD- Preparing of various layouts – Plant arrangement planning, Equipment layout, Pipe layout and Feasibility study.- Preparing of Pipe routing as per P & ID- Planning of support location- Co-ordination with internal discipline (Process, civil & structural, Electrical & Instrumentation).- Generation of fabrication 2D drawings for manufacturer & erection- Isometric generation- Carried out various Design Calculations for ensuring optimum design- Conversant with ASME, ASTM and ANSI standards- Working Platform used: AutoCAD 2007. Show less

    • Saankhya techneering pvt ltd

      May 2007 - Mar 2008
      Piping engineer

      - - Checking and Preparation of Plot Plan, Equipment Layout & Piping GAD.- Pipe routing, preparation of GA’s and MTO preparation.- Preparation of Pipe & Valve Material Specification.- Checking of drawings and mentoring junior designers.- Checking of isometrics.- Checking of Piping MTO.- Co-ordination with internal discipline (Process, civil & structural, Electrical & Instrumentation)- Working platform: PDMS 11.6 SP2 and AutoCAD 2007.

    • Envac environmental technology pvt ltd

      Apr 2008 - now
      Planning engineer

      - Preparation of Master Schedule based on the Scope of works- Preparation of micro level work Sequences so that the client will able to interpret the work procedure and step involved in the sequence of activities- Analyze critical path of the project and managing the project float and free float of the activities- Developing Work breakdown Structure (WBS) and organizing codes- Developing Resource dictionaries, Calendars and assign to activities- Updating the project progress using Progress Reporter- Updating individual activities using Team Member Module- Prepare Weekly and Monthly Progress Reports- Preparing and analyzing portfolio analysis, capacity planning and performance reports- Co-ordination with department heads to acquire information about the progress at site- Pipe System Design for ARCS , Layout Generation and Product Design- Preparation of Plot plan, Plant Layout.- Preparing Bill of Materials- Working Platform: Primavera P6.R7, AutoCAD 2012, 3D Realize Show less