Aqeel Ahmed -(PMP)®

Aqeel ahmed -(pmp)®

bookmark on deepenrich
location of Aqeel Ahmed -(PMP)®Lahore, Punjab, Pakistan
Followers of Aqeel Ahmed -(PMP)®4000 followers
  • Timeline

  • About me

    Deputy General Manager Operations | Manufacturing Operations

  • Education

    • Institute of international career certificate

      2019 - 2019
      Nebosh igc-1/igc-2/igc-3 occupational health and industrial hygiene
    • University of engineering and technology, lahore

      2013 -
      Bachelor of engineering - be industrial and manufacturing engineering a
    • Project management institute

      2021 - 2023
      Project management professional -pmp® project management a
    • University of sargodha

      2013 - 2015
      Bachelor of arts - ba journalism a
  • Experience

    • Kamal hosiery mills

      Oct 2015 - Apr 2017
      Lean project trainee

      Socks & Towel manufacturer

    • Style textile (private) limited

      May 2017 - Dec 2018
      Assistant manager ie

      Pakistan Top Exporter and Manufacturer of Adidas's/Hurley/Reebok/Levi's Brand.1-Product Operation breakdown(OB) making2-Standard Time study and line balances3-Hire 409 operators for 36 lines/made Skill Matrix's4-Layouts design and implementation5-Capacities calculation and strength setting6-VSM of whole Unit

    • Waresa industries pvt ltd

      Dec 2018 - Dec 2019
      Deputy manager ie/lean/qa

      Deluxe/Reef Land brand

    • Service industries limited

      Jan 2020 - Dec 2022
      Manager ie/lean/td

      Leading Overall Servis Tyre and Tube industries Limited Gujrat as a IE/Lean/Process Improvement Manager.1-Calculate Capacities of Overall Plant , Set benchmark of 85% Efficiencies and Achieve this Target successfully. Increase in Per day Production details are belowTyre-(MC 27k to 32k)-(BC 6K to 6.5K)-(ULT 6.2k to 6.9k )-(Agri 380 to 400)Tube-(MC 125k to 133k)-(BC 22k to 26K)-(Agri 7800 to 8500)2-Through Process Improvement and Automation Save 178Manpower/year ( Implement Conveyors for transportation of Goods and Save Labor ,merge different processes like insert plunger & inflation etc)3-Implement Reliever System and Save 6millions/Month with job creation of almost 700 People.4-Project on data centralization as well as strength control w.r.t capacities5- Introduce Digital Training System Show less

    • Indus home limited

      Dec 2022 - now

      1-Start Leading Overall Stitching Section of IHL with Approx. 40Tons Production/Day2-Introduce Concept of Cellular Manufacturing and Reduce Strength/Line from 37 to 283- Floor Improvement Stats (Improve WIP 10%, Audit pass ratio Internal 38% to 70% &External 92% to 95%).4-DHU (30% to 20% ) as well as OWE 52% to 70%.5- Implement Different Automation Projects having worth of 100millions with ROI lessthen 2years6-Introduce concept of Work standardization and reduce indirect Manpower 12% Show less Leading Overall Indus from Weaving to Stitching1-In Stitching section reduce strength from 49/line to 38/line.2-Introduce Performance Bonus Plan with a vision of Saving 300Millions/Year3-Introduce Concept of Smart Factory with Data Centralization System( Digitalization with Data Studio)4-Introduce Concept of Digital Training System with Saving of 20millions/Year ( Videography)5-Introduce Training School with Zero Operational Cost6-Introduce Sustainability Project (Conversation of B-Grade into A-Grade )7-Implement Lean Methodology and Save up to 380 Manpower Annually. Show less

      • DGM Operations & Product Development

        Nov 2024 - now
      • Deputy General Manager Operations

        Jan 2024 - now
      • Senior Operations Manager

        Dec 2022 - Jan 2024
  • Licenses & Certifications

    • Project management professional (pmp)®

      Project management institute
      Jan 2023
      View certificate certificate