Jacqueline Goh

Jacqueline Goh

Design Engineer

Followers of Jacqueline Goh444 followers
location of Jacqueline Goh美国 华盛顿州 贝尔维尤

Connect with Jacqueline Goh to Send Message

Connect

Connect with Jacqueline Goh to Send Message

Connect
  • Timeline

  • About me

    Project Manager at HNTB

  • Education

    • University of South Alabama

      -
      Bachelor Civil Engineering
  • Experience

    • Moreland Altobelli Associates, Inc

      Feb 2002 - Sept 2004
      Design Engineer

      Interstate 85/State Route 316 Interchange Improvements – Georgia Department of Transportation$147 million Interstate 85 (I-85) and State Route 316 (SR 316) improvement project in Atlanta Metropolitan Area in northwestern Georgia. This project included reconstruction of the I-85/SR 316 Interchange, 17 miles of new High Occupancy Vehicle (HOV) lanes along I-85 and SR 316, 11 miles of new collector-distributor roadways that run parallel to I-85, 24 retaining walls, and 13 new/reconstructed bridges. 收起

    • Pharr Engineering, Inc.

      Sept 2004 - Sept 2009
      Project Engineer

      Projects included Douthit Ferry Road Improvement, Main Street Gateway Improvement, State Route 113/State Route 61 Sidewalk and Trail Improvement, Mission Road Realignment, U.S. Highway 411/Tellus Drive Intersection Improvement, Interstate 75/Riverside Drive Interchange Improvements, and Peachtree Street Streetscape.

    • HR Green, Inc.

      Dec 2009 - Jul 2015

      Illiana Expressway, Phase I – Illinois Department of Transportation The 950 square-mile study area is between I-55 in Illinois on the west, I-65 in Indiana on the east, U.S. Highway 30 on the north, the northern portion of Kankakee County in Illinois and the southern portion of Lake County in Indiana on the south. This study includes adherence to an aggressive schedule, incorporation of Context Sensitive Design, and significant public involvement. The proposed design consists of approximately 44.7 mile new four-lane open-median expressway, 10 new/reconstructed interchanges, 78 bridges, retaining walls, and hydraulic analysis of 79 major culverts. I-88 Reagan Memorial Tollway Resurfacing – Illinois State Toll Highway Authority$50 million I-88 Tollway improvement project between U.S. Highway 30 and U.S. Highway 52 in Whiteside and Lee Counties, Illinois. This 10.9 mile long I-88 consisted of patching and overlaying the existing four-lane facility, reconstruction of Illinois Route 26 ramp pavements, rehabilitation of bridges and box culverts, lighting upgrades, installation of new Intelligent Transportation System (ITS), and replacement of an existing weather station. 收起 I-29 Sioux City Interstate Studies, Final Design – Iowa Department of Transportation$64 million I-29 improvement project to accommodate future industrial and commercial development in the City of Sergeant Bluff and Sioux City in northwestern Iowa. This project included adherence to an aggressive schedule, significant multi-year design/construction phasing in correlation with available funding, and extensive design of construction staging to minimize impacts to the motoring public, businesses, and residences. The 5.8 mile long I-29 reconstruction consisted of upgrading the four-lane facility to a six-lane facility with auxiliary lanes at the interchanges, reconstruction/resurfacing of 3 major interchanges, replacement of 6 bridges, 4 new retaining walls, and 15 major culverts. 收起

      • Project Engineer

        Oct 2012 - Jul 2015
      • Project Engineer

        Dec 2009 - Oct 2012
    • HDR

      Jul 2015 - Jun 2018

      Project NEON Design BuildAt over $560 million, Project Neon is the state of Nevada’s largest and most expensive transportation project. The project extends 3.7 miles along I-15 from Sahara to the US-95 interchange and will feature a new High Occupancy Vehicle (HOV) connector between US-95 and I-15, a new I-15 HOV interchange known as “Neon Gateway”, rebuilding the I-15 and Charleston interchange, and realignment of Martin Luther King (MLK) Boulevard with a flyover at Charleston. Rapid Bridge Replacement Project, Design Build Public Private Partnership (P3)This project is a P3 design-build-finance-maintain (DBFM), a partnership between the Pennsylvania Department of Transportation and Plenary Walsh Keystone Partners with an $899M budget to replace 558 aging bridges throughout Pennsylvania. Most of the bridges ranges from 40 to 75 feet long and are located in the rural regions of Pennsylvania. Portsmouth SR 823, Southern Ohio Veterans Memorial Highway, Design Build Public Private Partnership (P3)This P3 project involves design-build-operate-maintain (DBOM) of the $429M new 16 mile 4-lane limited access freeway through the hills of southern Ohio. The project includes 4 interchanges and 22 bridges. The project also includes over 20 million cubic yards of mostly rock excavation and 150 feet high embankments.

      • Project Manager

        Feb 2017 - Jun 2018
      • Roadway Design Discipline Lead

        Mar 2016 - Feb 2017
      • Roadway Deputy Design Manager

        Jul 2015 - Mar 2016
    • HNTB

      Jun 2018 - now
      Project Manager
  • Licenses & Certifications

    • Professional Engineer (PE)

      State of Washington Board of Professional Engineers
      Nov 2018
    • Professional Engineer (PE)

      Georgia Board of Professional Engineers & Land Surveyors
      Jun 2008
    • Professional Engineer (PE)

      Texas Board of Professional Engineers
      Jul 2017