SAYED ABDUR RAKIB

SAYED ABDUR RAKIB

Shift Engineer

Followers of SAYED ABDUR RAKIB1000 followers
location of SAYED ABDUR RAKIBNetrakona, Dhaka, Bangladesh

Connect with SAYED ABDUR RAKIB to Send Message

Connect

Connect with SAYED ABDUR RAKIB to Send Message

Connect
  • Timeline

  • About me

    Energy Engineer || Operation Engineer of Gas Turbine & Gas Engine Power Plant || HVAC & R || Renewable Energy

  • Education

    • Barhatta C.K.P Govt. Pilot High School

      2010 - 2015
      SSC Science 5.00
    • Birshreshtha Munshi Abdur Rouf Public College, BMRPC

      2015 - 2017
      HSC Science 5.00 ( Out of 5.00)
    • Khulna University of Engineering and Technology

      2018 - 2023
      Bachelor of Science Energy Science and Engineering 3.60 ( Out of 4), Mark: 76%

      Major Courses ★ Power Plant Engineering ★ Coal Power Generation ★ Nuclear Power Engineering ★ Fuel Combustion and IC Engines ★ HVAC & R System Design ★ Instrumentation and Control ★ Smart Grid Technology ★ Thermodynamics ★ Fluid Mechanics ★ Dynamics and Kinematics of Machineries ★ Power System Engineering ★ Solar Photovoltaic System ★ Electrical Machines ★ Bio and Wind Energy Engineering ★ Energy Efficiency Assessment… Show more Major Courses ★ Power Plant Engineering ★ Coal Power Generation ★ Nuclear Power Engineering ★ Fuel Combustion and IC Engines ★ HVAC & R System Design ★ Instrumentation and Control ★ Smart Grid Technology ★ Thermodynamics ★ Fluid Mechanics ★ Dynamics and Kinematics of Machineries ★ Power System Engineering ★ Solar Photovoltaic System ★ Electrical Machines ★ Bio and Wind Energy Engineering ★ Energy Efficiency Assessment ★ Energy Audit and Management ★ Electrical Circuits and Electronics ★ Power Electronics ★ Statics and Solid Mechanics Show less

  • Experience

    • Sinha Power Generation Company Ltd

      Sept 2023 - now
      Shift Engineer

      Job Responsibilities:1. Supervision and Operation of 34.5 MW Gas Turbine (Turbine – GE, Model PG 6541 B, Speed-Tronic Mark – IV control system, 3 stage turbine, 17 stage compressor, Generator-NTC).2. Supervision and Operation of four Gas Engine (Engine – NIGATA, Model – 18V28AGS, Generator – NISHISHIBA), startup shutdown, full load running and tripping condition.3. Time to time checking of 11/33 KV, 22/25 MVA and 30/35 MVA on load voltage regulation power transformer and auxiliary transformer.4. Preparing transmission operation-related daily reports and system abnormal reports.5. Load maintain according to the demand of LDC and local power distribution company (WZPDCL & BREB). Show less

  • Licenses & Certifications