Mohamed Ibrahim

Mohamed ibrahim

bookmark on deepenrich
Followers of Mohamed Ibrahim2000 followers
  • Timeline

  • About me

    Geotechnical Section Manager at EDECS

  • Education

    • Faculty of engineering suez canal university

      -
      Bachelor of engineering (b.eng.) civil engineering graduation project excellent (transportation and traffic engineering)
  • Experience

    • Alhamd for contracting

      Jun 2008 - Sept 2008
      Site engineer

      Site Engineer (June 2008 – September 2008) Location: Talaeea` Alzra`een organization – Alasher mn Ramadan, Egypt Project: Construction of a new stage, lack & landscape.

    • Archirodon group n.v.

      Oct 2008 - Jun 2010

      The New Container Terminal In Damietta International Port. • Construction of diaphragm wall of total length 2.5 km ,width 1 m ,depth 40 m using hydraulic cutter and hydraulic grab using the overlap technique.• Construction of diaphragm wall of total length 2.5 km, width 80 cm, depth 40 m using hydraulic cutter and hydraulic grab using the overlap technique.• Construction of 3000 cast insitu bored piles diameter 1 m, length 40 m.• Construction of 2000 permanent anchors length 30 m. Contract value: 600 million us dollars Show less

      • Site Engineer

        Sept 2009 - Jun 2010
      • Site Engineer

        Oct 2008 - Aug 2009
    • Archirodon group n.v.

      Jan 2011 - Jun 2011
      Site engineer

      Damietta 500 MW Simple Cycle Gas Turbine- Four Units,Egypt. • Working With Geotechnical Department As a Site Engineer For:• Construction of 1100 Bored Piles of Diameter 80 cm & length 43m.• Performing 6 Dynamic pile load tests. • Performing 3 lateral pile load tests.• Construction of the Dewatering System using sump pit and Deep Wells of Length 14 m.Site Engineer (Jul 2010 - Dec 2010). AL Ein AL-Sokhna Power Station Unit 1&2 (2x650MW) Thermal Plant. • Working With Geotechnical Department As a Site Engineer For:• Construction of 1000 Bored Piles of Diameter 80 cm & various lengths.• Performing 6 compression pile load tests.• Performing 2 lateral pile load tests.• Performing 1 tension pile load test. Show less

    • Saudi pan kingdom company - sapac

      Jun 2011 - Jul 2012
      Construction section head for geotechnical department.

      Completion of El madina Roads Group Ten. • Working With Geotechnical Department As a Section head Engineer For:• Construction of bored piles various diameters and various Length for foundation of the Bridge.• Performing one compression pile load test.• Performing one tension pile load test.• Client : ARMCO• Country : Saudi Arabia.

    • Archirodon group n.v.

      Aug 2012 - Feb 2017

      Extension And Rehabilitation Of Port Of Jorf Lasfar, Morocco. Supervising and Construction of the following activities: • Construction of diaphragm wall of Extension with total length 61,6 m ,width 1.2 m ,depth 34 m using hydraulic cutter and hydraulic grab using the overlap technique.• Construction of 25 cast in situ bored piles diameter 1.2 m, length 25 m.• Soil improvement by vibroflotation compaction technique.•48 Off King Pile diameter 1.05m, length 38m.•36 Off Mortar Pile diameter 1.05m, length 8m.•24 Off Secant Pile diameter 1.05m ,length 12m.• Client : Office National for electricity (OCP S.A)• Country : Morocco. Show less

      • Construction Section Head for Geotechnical Department

        Mar 2016 - Feb 2017
      • Construction section head engineer for Geotechnical Department

        Jun 2015 - Feb 2016
      • Geotechnical Section head

        Aug 2012 - May 2015
    • Edecs el dawlia for engineering & contracting

      Mar 2017 - now
      Geotechnical section manager

      Mar. 2020 – Present,o Project: Multi‐Purpose Terminal on Berths 55/62 Alexandria Seaport Expansiono Budget: EGP 2.5 Billion ($156 Million).o Supervised the dredging phases of backfilling sand amount of 10 million cubic meters by marine hopper dredger.o Performed the site investigation tests; Boreholes, CPTs, Piezometers, and Geophysical testing.o Soil improvement for 256000 m2. using Wick Drains technique (P.V.D.).o Soil improvement for 4080000 m3 using vibro‐flotation compaction technique.o Soil improvement for 272026 m2 using Rapid Impact Compaction (R.I.C.).o Construction of diaphragm wall with total length 1224 L.m., width 1.20 m, depth 40 m usingHydro‐fraise and the overlap technique.o Construction of Barrettes with total No.319 Barrettes Length 2.8 m, width 0.8 m, depth 40 musing Hydro‐fraise.o Construction of Bored Piles with total No.641, 1.20 m diameter and 40 m depth.Jan. 2019 – Feb.2020,o Project: Construction of Eastern Quay Wall for The Naval Base, East Port Said. o Budget: EGP 1.5 Billion ($84 million).o Construction of diaphragm wall with total length 1041 L.m., width 0.8 m, depth 67.5 m using hydraulic cutter and hydraulic grab using the overlap technique.o Construction of Barrettes with total No.382 Barrettes Length 2.8 m, width 0.8 m, depth 67.5 m using hydraulic grab and hydraulic Cutter.April. 2017 – Dec.2019,o Project: Construction of 680 m Berth in Damietta Port.o Budget: EGP 990 milliono Soil improvement for 678529 L.M. using Wick Drains technique (P.V.D.).o Soil improvement for 465119 m3 using vibro-flotation compaction technique.o Soil improvement for 43829 m2 using Rapid Impact Compaction (R.I.C.).o Construction of diaphragm wall with total length 640 L.m., width 1.0 m, depth 42 m usinghydraulic grab and hydraulic Cutter using the overlap technique.o Construction of Barrettes with total No.489 Barrettes Length 2.5 m, width 0.8 m, depth 42 musing hydraulic Cutter. Show less

  • Licenses & Certifications

    • Graduation certificate

      May 2008
    • Open water diver

      Padi
      Sept 2017