
FABIO BALDUSSI

Connect with FABIO BALDUSSI to Send Message
Connect
Connect with FABIO BALDUSSI to Send Message
ConnectTimeline
About me
E&I Construction and Commissioning Supervisor
Education

I.P.S.I.A A.Meucci
1983 - 1987Diploma Istituto Tecnico e Professionale Tecnico Elettrico ed Elettronico
IPSIA CAGLIARI
1983 - 1985Radiotelegrafista di Bordo III° Classe
Experience

Saipem
Jan 1994 - Jan 1995calibration and loop check Instrumentation in oil extraction platforms. calibration and loop check Instrumentation in oil extraction platforms.
Commissioning Supervisor
Jan 1994 - Jan 1995Installation Supervisor
Jan 1994 - Jan 1995

Saras
Apr 1996 - Sept 2008Manutenzione Strumentazione\Analizzatori presso SARAS S.p.A Sarroch(CA) Strumentista\Analizzatorista
Strumentista\Capo squadra
Apr 1998 - Sept 2008Strumentista
Apr 1996 - Mar 1998

Polimeri Europa
Sept 2008 - Dec 2011Instrument SuperintendentHead of Instrumental Team at Polimeri Europa (Ravenna)ITALY, coordinating and supervising the work of instruments/ analyzers. Supervisor of Instrumental Team at Polimeri Europa (Ravenna)ITALY, coordinating and supervising of 20 people for the works of instruments/ analyzers installed.Instrumentation Supervisor during various stops and in the maintenance in the following plants:SOL,SBR,BTD, and participated in the construction of a new project for revamping SOL1. -Control of design services for start-up-Control and monitoring of the materials required for the work and compliance with technical specifications-Coordination execution of works-Functional Testing equipment and Loop Check-programs- Start-Up systems-Management Accounting عرض أقل

Agip KCO
Jan 2012 - Jul 2013Coordinates and expedites flow of materials, parts, and assemblies between sections or departments, according to production and shipping schedules or department priorities, and compiles and maintains manual or computerized records: Reviews production schedules and related information and confers with department supervisors to determine material requirements to identify overdue materials and to track material.- Requisitions material and establishes sequential delivery dates to departments, according to job order priorities and material availability.- Examines material delivered to production departments to verify conformance to specifications.- Arranges in-plant transfer of materials to meet production schedules.- Computes amount of material required to complete job orders, applying knowledge of product and manufacturing processes.- Compiles and maintains manual or computerized records, such as material inventory, in-process production reports, and status and location of materials.- Move or transport materials from one department to another, manually or using material handling equipment.- Arrange for repair and assembly of material or part.- Monitor and control movement of material and parts on automated conveyor system عرض أقل QA\QC EI&T INSPECTOR AT "KASHAGAN EXPERIMENTAL PROJECT" ISLAND 'D" IN ATYRAU KAZAKHSTAN Activities Coordination to prepare all equipments for Agipkco Inspectors,Witness for Agipkco Inspector on Electrical Tests for Cables LV,MV,HV,instruments and loop test.Coordinate with the construction, commissioning, safety and other concerned departments for Hook-up Completion QC inspection activities. • Perform pro-active inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures, standards, specifications and ensure that it follows all relevant approve for construction drawings. • Make a record or report on hard and soft copy of the ITR done each day for the Hook-up department ITR tracking. • Prepare drawings if necessary download from ACS & EDMS, like; Instrument Layout Drawing (ILD), Piping & Instrument Diagram (P&ID), LOOP Diagram, (FGD) Fire and Gas Layout Drawing, (TLD) Telecom Layout Drawing, (BLD) Block Logic Diagram, Cable Schedule, Instrument/Cable Indexes, and other pertinent drawings needed for inspection. عرض أقل
QA\QC Engineer Material & Equipment Kashagan Experimental Project
Jan 2013 - Jul 2013QA\QC E&IT INSPECTOR Kashagan Experimental Project Agipkco
Jan 2012 - Jan 2013

Eni
Sept 2013 - Mar 2018Coordination and supervision of Commissioning,Start-Up & Operation activities in the field.• Coordination and supervision of Start-Up and Operation activities in the field.• Inspection of Instrumental/Electrical equipment’s (ITR A/B).• Coordinate with the Construction, Safety, Quality and other concerned departments all the Contractor Work permits. • Perform pro-active inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures, standards, specifications and ensure that it follows all relevant approve for construction drawings. • Make a record or report on hard and soft copy of the Punch List (PL) done each week, and closure remedial works coordination.•Planning activities for Test Inspection (ITP) of equipment’s for all Instrumental & Electrical Department. • Make a record or report on hard and soft copy of the ITR done each day for the department ITR tracking• Prepare drawings if necessary download from ACS System or EDAM System, like; Instrument Layout Drawing (ILD), Piping & Instrument Diagram (P&ID), LOOP Diagram, (FGD) Fire and Gas Layout Drawing, (TLD) Telecom Layout Drawing, (BLD) Block Logic Diagram, Cable Schedule, Instrument/Cable Indexes, and other pertinent drawings needed for inspection. عرض أقل Coordination and supervision of Commissioning,Start-Up & Operation activities in the field.• Coordination and supervision of Start-Up and Operation activities in the field.• Inspection of Instrumental/Electrical equipment’s (ITR A/B).• Coordinate with the Construction, Safety, Quality and other concerned departments all the Contractor Work permits. • Perform pro-active inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures, standards, specifications and ensure that it follows all relevant approve for construction drawings. • Make a record or report on hard and soft copy of the Punch List (PL) done each week, and closure remedial works coordination.•Planning activities for Test Inspection (ITP) of equipment’s for all Instrumental & Electrical Department. • Make a record or report on hard and soft copy of the ITR done each day for the department ITR tracking• Prepare drawings if necessary download from ACS System or EDAM System, like; Instrument Layout Drawing (ILD), Piping & Instrument Diagram (P&ID), LOOP Diagram, (FGD) Fire and Gas Layout Drawing, (TLD) Telecom Layout Drawing, (BLD) Block Logic Diagram, Cable Schedule, Instrument/Cable Indexes, and other pertinent drawings needed for inspection. عرض أقل Coordination and supervision of Construction,Commissioning,Start-Up & Operation activities in the field.• Coordination and supervision of Start-Up and Operation activities in the field.• Inspection of Instrumental/Electrical equipment’s (ITR A/B).• Coordinate with the Construction, Safety, Quality and other concerned departments all the Contractor Work permits. • Perform pro-active inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures, standards, specifications and ensure that it follows all relevant approve for construction drawings. • Make a record or report on hard and soft copy of the Punch List (PL) done each week, and closure remedial works coordination.•Planning activities for Test Inspection (ITP) of equipment’s for all Instrumental & Electrical Department. • Make a record or report on hard and soft copy of the ITR done each day for the department ITR tracking• Prepare drawings if necessary download from ACS System or EDAM System, like; Instrument Layout Drawing (ILD), Piping & Instrument Diagram (P&ID), LOOP Diagram, (FGD) Fire and Gas Layout Drawing, (TLD) Telecom Layout Drawing, (BLD) Block Logic Diagram, Cable Schedule, Instrument/Cable Indexes, and other pertinent drawings needed for inspection. عرض أقل Coordination and supervision of Construction,Commissioning,Start-Up & Operation activities in the field.• Coordination and supervision of Start-Up and Operation activities in the field.• Inspection of Instrumental/Electrical equipment’s (ITR A/B).• Coordinate with the Construction, Safety, Quality and other concerned departments all the Contractor Work permits. • Perform pro-active inspection to the ongoing construction activities to align/comply all construction output to the specific project procedures, standards, specifications and ensure that it follows all relevant approve for construction drawings. • Make a record or report on hard and soft copy of the Punch List (PL) done each week, and closure remedial works coordination.•Planning activities for Test Inspection (ITP) of equipment’s for all Instrumental & Electrical Department. • Make a record or report on hard and soft copy of the ITR done each day for the department ITR tracking• Prepare drawings if necessary download from ACS System or EDAM System, like; Instrument Layout Drawing (ILD), Piping & Instrument Diagram (P&ID), LOOP Diagram, (FGD) Fire and Gas Layout Drawing, (TLD) Telecom Layout Drawing, (BLD) Block Logic Diagram, Cable Schedule, Instrument/Cable Indexes, and other pertinent drawings needed for inspection. عرض أقل
E&I Commissioning Supervisor
Jun 2016 - Mar 2018E&I Commissioning & Start Up Supervisor
Dec 2015 - Jun 2016E&I Commissioning &Start Up Supervisor
Oct 2014 - Nov 2015Qa\Qc Engineer EWR Project (FAT)
Jul 2014 - Sept 2014E&IT Construction & Commissioning Supervisor
Sept 2013 - Jun 2014

GE
Apr 2018 - Jul 2018Field Service Engineer
May 2018 - Jul 2018E&I Commissioning Superintendent
Apr 2018 - May 2018

KCOI LLP
Sept 2018 - Apr 2019Mechanical Completion E&I-FAT Coordinator
Eni
May 2019 - Nov 2019E&I Advisor for NNPC refinery rehabilitation
SARLUX SRL
Nov 2019 - May 2020Instrument Supervisor
FATA EPC
Jun 2020 - Oct 2020Instrument supervisor
Licenses & Certifications

BOSIET OPITO
OPITOMay 2016
Languages
- inInglese
- frFrancese
- ruRusso
- kaKazako
Recommendations

Mallinath elekar
Trainee Developer at PRGX | Aspiring Data Enthusiast | SQL | Python | AirflowPune, Maharashtra, India
Rui ferreira da silva neto
Engenheiro de Controle e AutomaçãoEunápolis, Bahia, Brasil
Moh adli akbar
Software Engineer | Driving Needle-Sized Change with LLM & AIBandung, West Java, Indonesia
Catalina olazo hurtado
Project Manager | Líder en Gestión de ProyectosChile
马锦锦
美国selleck生物科技有限公司 -Technical supportShanghai, China
Phillip sandeman
Freelance Senior Motion Designer - motion, design, and direction (Sandeman.tv)London, England, United Kingdom
Sadaf zehra
Research scientist, Protein Biochemist, Scientific writer, Project management, Nature enthusiastWindsor, Ontario, Canada
Sarah brown, cfre
Sr. Director of Philanthropy at Oakland UniversityDetroit Metropolitan Area
Gloria olumayede llm, cipm
Data Privacy and Security| Risk Assessment| Research| UEA Law ‘23Bournemouth, England, United Kingdom
Naila batool
SQA ENGINEER | SDET | QA | Web Testing | Linux | Application Testing | API Testing | Load Testing | ...Islāmābād, Pakistan
Suman saha
Officer- IT at APEX PHARMABangladesh
Vivek chauhan
SDL Performance Engineering at American ExpressNoida, Uttar Pradesh, India
Lina ljungholm
FastighetsförvaltareGreater Gothenburg Metropolitan Area
Shilpa nair-kulkarni
Project Manager, Learning & DevelopmentPune, Maharashtra, India
Lynn husseini
Senior Performance Executive - at Omnicom Media GroupBeirut Governorate, Lebanon
Pauline eklund
Adjunct Professor of Psychology at San Jacinto CollegeLeague City, Texas, United States
Varsha golande ccp, ccp-c, grp
Sr. Specialist, Human Resources at WorldatWork India - Does Everything with Meraki![ may-rah-kee]Pune, Maharashtra, India
Morgana clock
Senior Manager | Quality Engineering | Customer Experience | Product Development | Business Strategy...Joinville, Santa Catarina, Brazil
Deepak m.
Experienced Java DeveloperMumbai, Maharashtra, India
Pam roes
Student Tio University of Applied SciencesRiethoven, North Brabant, Netherlands
...