Paulo Rosas

Paulo Rosas

Mechanical Engineer

Followers of Paulo Rosas1000 followers
location of Paulo RosasMelbourne, Victoria, Australia

Connect with Paulo Rosas to Send Message

Connect

Connect with Paulo Rosas to Send Message

Connect
  • Timeline

  • About me

    I help multidisciplinary teams to deliver projects while adding value to clients and end users | Project Manager | PMP® MIEAust CPEng NER RPEQ

  • Education

    • University of Concepcion

      1998 - 2001
      Master of Science (M.Sc.) Applied mechanics and finite element model updating
    • University of Concepcion

      1994 - 2000
      Bachelor of Engineering (BEng) Mechanical Engineering

      Publications“Analysis of the Limitations Associated to the MECE error Indicator in the Context of Model Updating”, submitted to Earthquake Engineering and Structural Dynamics.“Detección de Fallas en Estructuras Mediante Ajuste de Modelos de Elementos Finitos” Damage Detection in Structures using Finite Element Model Updating, submitted to Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería“Damage Detection Using Finite Element Model Updating”… Show more Publications“Analysis of the Limitations Associated to the MECE error Indicator in the Context of Model Updating”, submitted to Earthquake Engineering and Structural Dynamics.“Detección de Fallas en Estructuras Mediante Ajuste de Modelos de Elementos Finitos” Damage Detection in Structures using Finite Element Model Updating, submitted to Revista Internacional de Métodos Numéricos para Cálculo y Diseño en Ingeniería“Damage Detection Using Finite Element Model Updating”, Thesis presented to obtain a degree as Masters in Engineering Sciences Major in Mechanical Engineering. University of Conception, January 2001.“Application of Dynamic Simulation to the Design of Copper Leach Projects”, Article presented at International Copper Hydrometallurgy Workshop 2005. Show less

    • Pontificia Universidad Católica de Chile

      2021 - 2022
      Diploma Construction Management
    • Pontificia Universidad Cat��lica de Chile

      2022 - 2022
      Diploma Green Hydrogen
  • Experience

    • Fluor

      Oct 2000 - Jul 2007
      Mechanical Engineer

      As Mechanical Engineer, my focus was on design and writing specifications, scope of works, tracking engineering deliverables, preparing mechanical equipment datasheets and quote requests. Review of tenders, purchase orders, vendor data, vendor expediting and general design review. Conveyor design and dynamic simulation modelling. Contributed to the preparation of mechanical layouts and capital cost estimates.

    • Fluor

      Oct 2007 - Jul 2014

      Lead Mechanical / Piping Engineer for feasibility study services for the Polishing Plant 2 project at Sepon aimed at reducing the tailings water inventory and to also provide sulphate removal before release into the Namkok River. Key Responsibilities; Managed a team of five engineers and designers. Oversaw design and technical qualities of deliverables, development of the engineering level schedule, labour hours estimate, staffing, budget pricing enquiries, liaison with equipment suppliers, technical clarifications and capital cost estimate. Participated in pump and tank calculations, the preparation of equipment datasheets, specification and review of P&ID’s, and supplied design input for the area layout. Show less Prefeasibility study services for the recovery of gold doré, including two process plant options (WOOR / POx), comminution circuit and a conventional carbon-in-leach process (1.7 Mtpa).Key Responsibilities; Lead mechanical/Piping engineer for Process Plant and Infrastructure scope of services, leading a team of 6 engineers and designers. Discipline supervision, design reviews, development of the engineering level schedule, work hours estimate, budget pricing enquiries, liaison with equipment suppliers, equipment selection, review of vendor data, technical clarifications and capital cost estimate Show less The Simandou Iron Ore Project is a world-class iron ore project in Guinea, West Africa. Key Responsibilities as Port Engineer Manager:• Responsible for managing an interdisciplinary team of approximately 50 professionals. • Completion of Definitive Engineering (DE) submission, and project close-out. • Interfaced with engineering disciplines, procurement, project management and the client.Key Responsibilities as Lead Mechanical Engineer:• Accountable for the port scope of services, including a large network of 24 conveyors, throughput up to 15,000tph and leading a team of 25 engineers and designers. • Responsible for the design of all aspects associated with conveyors, feeders, transfer stations including shuttle conveyors and associated infrastructure. • Supervised cost estimate for the Preliminary Engineering Assessment (PEA) and Definitive Engineering (DE) stages, tender preparation and technical bid evaluation of the major mechanical equipment (car dumpers, stackers, and reclaimers and shiploaders), contract and construction support. • Disciplined leads activities, labour hours estimates, scheduling, staffing, design reviews and discipline supervision. Liaison with owner's sub consultant, overseas execution centres and third party design offices. Show less Mechanical engineer for material handling. Involved with the detail design of the material handling facilities at BHP Billiton’s Yandi Mine operations. Key Responsibilities; Accountabilities included detail design of various conveyors, feeders and shuttles ranging from 1,000 to 10,000 tph, including complete conveyor design according to Australian, ISO, DIN and CEMA standards. Prepared specifications, scope of work, datasheets and technical bid evaluations. Reviewed and approved vendor drawings, and provided input on detail design aspect of the conveying system. Show less

      • Lead Mechanical / Piping Engineer

        Oct 2013 - Jul 2014
      • Lead Mechanical / Piping Engineer

        Jul 2013 - Sept 2013
      • Senior Mechanical Engineer

        May 2013 - Jun 2013
      • Lead Mechanical Engineer

        Jan 2011 - Apr 2013
      • Lead Mechanical Engineer

        Jul 2009 - Dec 2010
      • Material Handling Engineer

        Oct 2007 - Jun 2009
    • Fluor Corporation

      Nov 2014 - Dec 2018

      Key Responsibilities; • Supported the Project Area Engineer Manager for the successful execution of all the engineering scope of work on the project including budget, schedule and quality. • Ensured proper communication and coordination among Engineering disciplines, construction, BHP and external parties (e.g. contractors).• Ensured that the lead discipline engineers provided the overall technical quality, integrity and adequacy of all engineering design deliverables within the project budget and schedule and according to the project design basis and standards.• Ensured implementation of technical design requirements to meet health, safety, and environmental (HSE) regulatory requirements. Show less Key ResponsibilitiesOversaw design and technical qualities of deliverables, development of the engineering level schedule, labour hours estimate, staffing, budget pricing enquiries, liaison with equipment suppliers, technical clarifications and equipment selection,• Supervised cost estimate, tender preparation and technical bid evaluation of the major mechanical equipment (SAG & Ball mills, SFR flotation cells, Regrind mills and filter plant),• Reviewed and approved vendor drawings, and provided input on detail design aspect of the concentrator plant layout. Show less

      • Engineer Manager

        May 2018 - Dec 2018
      • Deputy Manager Engineering

        Sept 2017 - Apr 2018
      • Mechanical Department Manager

        Jul 2017 - Apr 2018
      • Lead Mechanical Engineer

        Sept 2015 - Aug 2017
      • Senior Project Engineer

        Nov 2014 - Aug 2015
    • Consultant at Self-employed

      Jan 2019 - Mar 2019
      Senior Mechanical Engineer
    • Mincore

      Apr 2019 - Nov 2022

      Project Manager at Mincore for Latrobe Magnesium Demonstration Plant Project regarding a new Magnesium Metal Plant in Victoria's Latrobe Valley, Australia. Detail design and construction support for the operational readiness of the existing Gold Plant to process Primary Gold Ore. Project manager for the detail design phase of the advanced compressed air energy storage (A-CAES) facility. Responsible for the rehabilitation of the existing underground section of the Angas Zinc Mine in South Australia.

      • Project Manager

        May 2020 - Nov 2022
      • Project Manager

        Jan 2020 - May 2020
      • Project Manager

        Apr 2019 - Dec 2019
    • Wood

      Nov 2022 - now
      Senior Project Manager
  • Licenses & Certifications

    • National Engineering Register

      Engineers Australia
      Sept 2020
      View certificate certificate
    • National Engineering Register

      Engineers Australia
      Jul 2020
      View certificate certificate
    • Registered Professional Engineer of Queensland (RPEQ)

      The Board of Professional Engineers of Queensland
      Mar 2019
    • Chartered Professional Engineer (CPEng)

      Engineers Australia
      Mar 2019
    • Chartered Professional Engineer

      Engineers Australia
      Mar 2019
      View certificate certificate
    • Project Management Professional (PMP)®

      Project Management Institute
      Jun 2017
    • Finance for Non-Financial Managers

      LinkedIn
      Sept 2021
      View certificate certificate
    • Chartered Professional Engineer

      Engineers Australia
      Mar 2019
      View certificate certificate