Zaid Abdullah, Abu Yusof

Zaid abdullah, abu yusof

bookmark on deepenrich
location of Zaid Abdullah, Abu YusofKertih, Terengganu, Malaysia
Followers of Zaid Abdullah, Abu Yusof498 followers
  • Timeline

  • About me

    PAUT LevIII/ UT LevIII

  • Education

    • Iandt malaysia

      2023 - 2028
      Iso9712 level iii phased array ultrasonic testing
    • Iandt malaysia

      2023 - 2028
      Iso9712 level iii ultrasonic testing
    • Universiti teknologi malaysia

      2013 - 2014
      Diploma in industrial engineering grade 1

      Professional Diploma in Industrial Engineering

    • University of malaya

      2000 - 2005
      Cad/cam engineering
    • Sdar seremban

      1993 - 1997
      10 agregate
  • Experience

    • Shamira sdn bhd

      Oct 2006 - Jul 2010
      Ndt inspector

      Working with Shamira Sdn Bhd. as NDT Technician (UT) / Asst Phase Array. Carried out Ultrasonic Testing Inspection TKY and Butt joints (Single Bevel, Double Bevel, Single ’V’, Double V’, lamination check during Fabrication.). UT Operator / NDT Inspector (UT PCN Level II, MT/PT ASNT Level II)

    • Sgs sdn bhd

      Sept 2010 - Jan 2015
      Ndt inspector

      Working with SGS (M) Sdn Bhd. Carried out PAUT and Ultrasonic Testing Inspection Butt joint (Single Bevel, Double Bevel, Single ’V’, Double V’, lamination check during Fabrication. Location at designated fabrication yards and plant in Malaysia.PAUT Operator / NDT Inspector (PAUT CSWIP Level II, UT PCN Level II, MT/PT ASNT Level II)

    • Sgs petroleum service corporation

      Aug 2013 - May 2014
      Ndt paut

      To perform Phased Array Ultrasonic Testing (PAUT) on piping for Kebabangan Petroleum Oil Company (KPOC) Project, at Malaysia Marine and Heavy Engineering Holdings Berhad.

    • Sgs petroleum service corporation

      Aug 2014 - Oct 2014
      Paut inspector

      To perform monitoring and supervising as 3rd Party Inspector of Phase Array Ultrasonic Testing (PAUT) done by KPG Sdn Bhd on18” dia piping for EPCIC JDA Gas Balancing Evacuation (EVA) Project, at Muda Platform (CPOC), Trans Thai-Malaysia by Kenchana Pinewell and TTM Sdn Bhd for pre-shutdown, shutdown and post-shutdown.

    • Jgc (m) sdn bhd

      Jan 2016 - Apr 2017
      Chief nde engineer

      : To assess and finalize all NDE procedures for project approval and preparation of NDE production testing by subcontractors.: To monitor Phased Array Ultrasonic Testing (PAUT) for piping and AUT on piping and Tank 7.: To monitor NDE progress and results on piping and tank.: To monitor overall welding progress, hydro tests on PAF piping and Tank T3507.: To prepare for RT activities inside MLNG plant.: To review RT films of tank and PAF piping during production. Show less

    • Sinopec engineering group

      Oct 2017 - Jun 2019
      Paut / ndt inspector

      : To assess and finalize all NDE procedures for project approval and preparation of NDE production testing by subcontractors.: To monitor Phased Array Ultrasonic Testing (PAUT) for piping.: To monitor PWHT progress and results on piping.: To monitor NDE progress and results on piping.: To monitor overall welding progress, hydrotests on piping.: To prepare for RT activities inside Phase 2 RAPID plant.: To review RT films of piping during production.

    • Danamin m sdn bhd

      Aug 2019 - Sept 2019
      Utfd technician

      Scanning and reporting of UTFD activities during August Shutdown 2019

    • One astar

      Sept 2019 - Oct 2019
      Tubing weldment paut scanning

      Scanning weldment of tubing for unit 3 and unit 6 October shutdown

    • Boster engineering sdn bhd

      Sept 2019 - Sept 2019
      Paut operator

      Accessible weldment PAUT scanning on 2 reactors at Indorama Polymer Industries September Shutdown

    • Bvairs

      Oct 2019 - Nov 2019
      Paut technician

      PAUT scanning on coal train axles

    • Xpert engineering solution sdn bhd

      Dec 2019 - Dec 2019
      Paut inspector

      PAUT scanning and interpretation on in-service vessels

    • Various

      Jan 2020 - Sept 2022
      Paut technician

      Paut and Tofd Scanning and/or interpretation at various sites and power plant. Short period of jobs' duration.

    • Techno analysis sdn bhd

      Aug 2021 - Dec 2021
      Paut and ri inspector

      PAUT, UT scanning, interpretation and reporting, RI interpretation on 24" pipeline of Bintulu PTTEP platform

    • Brothers inspection sdn bhd

      Feb 2022 - Feb 2022
      Paut 3rd party inspector

      PAUT 3rd party inspection on 2" and 3" tubing at Jimah Power Plant

    • Be international marketing

      May 2022 - now
      Emerald crown ambassador

      Help yourself, help others

    • Bureau veritas group

      Aug 2022 - Nov 2022

      Advance NDT, conv. UT MT PT on various on static and mobile equipments in various coal mining locations in Mackay and Western Australia Advance NDT, conv. UTT MT on LW and CW inspection for cracking detection

      • NDT Inspector

        May 2022 - Nov 2022
      • PAUT/TOFD Operator

        Aug 2022 - Sept 2022
    • Altair engineering inspections

      Jan 2023 - Mar 2023
      Paut interpreter & operator

      PAUT for small bore tubing

    • Techno analysis sdn bhd

      May 2023 - Sept 2023
      Paut level iii

      Procedures writing, Block prepareation, Validation & Blind test approval. Review production progress,Data reviews and reports

    • Altair engineering inspections

      Jun 2023 - Jul 2023
      Paut operator

      PAUT inspection on tubing replacement for N-2-Outage

    • Ait malaysia sdn bhd

      Jul 2023 - Aug 2023
      Paut lev iii
    • Arise star malaysia

      Aug 2023 - Oct 2023
      Paut lev ii / lev iii

      PAUT scanning, interpretation and reporting for shutdown 2023, review & endorsement

    • Nuri cerah sdn bhd

      Dec 2023 - Feb 2024
      Paut operator
    • Marniq bersatu sdn. bhd.

      Jan 2024 - now
      Paut/ut leviii
  • Licenses & Certifications

    • Bosiet with ebs and travel safety

      Sequ offshore safety tr
      Aug 2015
    • Asnt ut mt pt

      Asnt (the american society for nondestructive testing)
      Jan 2019
    • Manual and encoded paut lev ii

      Cswip - certification scheme for personnel
      Nov 2017
    • Cswip 3.1 welding inspector

      Cswip - certification scheme for personnel
      Sept 2019
    • Ut lev ii 3.1 3.2 3.8 3.9

      The british institute of non-destructive testing
      Nov 2012
      View certificate certificate
    • Diploma in industrial engineering

      Universiti teknologi malaysia
    • Ri lev ii

      Cswip - certification scheme for personnel
      Nov 2017