      Senior Construction Engineer

      January 2011 – December 2012- ADCO Representative for SAS / FFD project in Abu Dhabi .Project Owner :ADCO Project main contractor :PETROFAC • Involved in implementing all project mechanical specifications according to standard codes (ASME B31.3, 31.4and 31.8) beside SHELL DEP. To achieve required project Quality and evaluate work performed by the Contractor and sub-contractors to insure that the work is being executed in accordance with project specifications. • acting as construction superintendent ,Direct report to Construction manager and supporting in coordinating different activities affected mechanical, safety and work completion.• Facilitate and coordinate all mechanical engineering technical work products in the brown/green field (Piping, Pipeline and Equipments )• Following up daily site progress, from the Contractor and sub-contractors as well as technical information requests• All piping activities in side RDSs ,fabrication, erection, punch listing, hydro testing and pre-commissioning hydro testing and pre-commissioning o Handling all pipeline and TL activities fabrication , lowering, HT,precomm,caliber pigging ,commissioning and IPS activities . • Involved in Shutdown activities belongs to mechanical department such as ,pre-shut down activities ,reviewing shutdown tie in packages and schedule, follow up daily progress of the shut down ,surface testing for all tie-in joints and issuing tie-in ITRs(inspection test record )in order to issuing MCC(mechanical completion certificate)• Involved in erection of all equipment inside RDSs such as ,flair stack , poster pumps, multi phase manifold, nitrogen receiver, nitrogen package, chemical skids, gas knockout drum, multi phase flow meter…..etc.• Participating in most EPC contractor and PMT meetings such as (weekly construction and kick-off meeting) .• Follow up commissioning issues with both contractors and vendor in order t close out pending issues properly Show less

    • Mott MacDonald (formerly HLSP)

      Jan 2016 - Nov 2016
      Sr.Commissioning Engineer

      project : Rumitha /Shanayel Phase III Client : ADCOContractor : GS & Dodsal responsibilities :Client representative at site for managing all pre-commissioning and Commissioning activities . Co-ordination with the Construction team to get the subsystems & systems ready for commissioning. In order to expedite pre-commissioning activities .  Preparation of pre-commissioning Commissioning Dossiers, Site Mark ups (Systems& sub-systems) , As Built / As Tested / As Commissioned drawings and Subsystem/System list. Arrange and witness Site Acceptance Test (SAT) carried out by vendor.  Coordinating between Company PMC, Ops. team ,Contactor and Vendor to sort and solve both punch list and warranty related issues. Preparation of commissioning spare parts list and test equipment requirements. Preparation and Execution of Operational Test Procedures. Planning, Scheduling and leading Execution of Decommissioning activities for Pipelines, piping and equipment s ; which should be carried out by specialized sub-contractor for decommissioning and desludging activies. Follow up with Contractor execution of project Demolition scope of work Show less

    • PESCO Emirates Electrical Services & Contracting LLC

      Jan 2017 - Jan 2018
      Sr.Lead Engineer (piping)

      • Lead pipeline, Piping and mechanical team to complete project Engineering.• Review all received engineering documents from engineering sub-contractor and get PMC approval(i.e. 3D modeling ,Piping isometrics , MTOs, pipe supports schedule ,PFD,WD ,…etc)• Succeeded to Lead site technical office and construction disciplines to complete project Phase I on time (Nov.2017).• Support all project vendors /manufactures with required technical date / documents to facilitate their scope of work. • Lead Building up all schedules for construction completion, pre-commissioning Activities, System /sub-system creation, testing, commissioning hand over Phase I.• Prepare all project As-built and project close out documents.• Succeeded to Administer and Liaises with site Engineers, Supervisors, Foreman, Quality Control and Specialists of other disciplines to ensure the optimum interface of the various operational activities.• Demonstrate personal commitment to HSE by following and comply with HSE Regulations, Corporate HSE Policy and applying Company's Safety Management Systems. Show less