Amir Abd Elhamid

Amir Abd Elhamid

Followers of Amir Abd Elhamid943 followers
location of Amir Abd ElhamidEgypt

Connect with Amir Abd Elhamid to Send Message

Connect

Connect with Amir Abd Elhamid to Send Message

Connect
  • Timeline

  • About me

    Sr Specialist - R&D System Design & Testing Engineer

  • Education

    • AMIT Learning

      2023 - 2023
      Diploma Embedded Systems & Software Testing

      Activities and Societies: Smart Home Automation Graduation Project Link: https://drive.google.com/file/d/1cziFxeo9ZX-SlEPMRenCDPbMhOcIteUL/view?usp=sharing (LCD-Keypad-Servo & DC Motor-Dimmer Circuit(PWM)-DIO-ADC-EEPROM-Blutooth(UART) Control) Proteus Simulation & Hardware Implementation Customized Mobile Application - C Programming & Data Structure- Embedded system Tools- Microcontroller & Microprocessor (AVR - ARM) Interfacing- RTOS- Software Testing- Automotive Bus Technology

    • Cairo University

      2014 - 2019
      Mechanical Power Engineering
    • Udacity

      2022 - 2022
      Nanodegree Advanced Digital Marketing

      Activities and Societies: -SEO -SEM -Display Marketing -Email Marketing - Google Analytics and Optimization - Introduction to Agile

  • Experience

    • Midea Carrier

      Nov 2019 - Dec 2023

      Responsibilities- Work Planning and leading 16 technicians through 8 Air Conditioning & Ventilation Testing labsincluding Performance, Reliability, Vibration Stress Analysis, and Sound Testing- Technical management, responsible for the effective operation of all labs resources and solvingany rising issue (mechanical, electrical, control, software, measurement, calibration, etc)- Data Analysis and Monitoring of Results, Decision Making, specifying points of improvementand possible risks for Residential & Commercial AC projects- Quality Assurance, Processes Standardization, Training of technicians, Assuring Conformity ofStandards and New Standards ImplementationSummary of Work Projects- Rebuilding & upgrading First Commercial Air Conditioning Performance Lab(25 TR) in Egypt &MENA from design phase till through implementation & operation saving more than 50% costfrom external contractors- Rebuilding & upgrading of 2 Performance Testing Labs (5 TR) from design phase till throughimplementation & operation (Sheet Metal, Electrical Distribution, Chiller System, DAQ System, LabView- Improving productivity by 30 % in 2 years through early optimized planning, processstandardization and training, development of new labs and equipment- Introducing and manufacturing the first 3D Printer in Miraco Company and printing several toolsand spare parts, Labs models, logos, etc.- Automation of several Excel VBA templates used for reporting, revision, and qualitydocumentation saving at least 70% of manual process time- Continual Yearly Accreditation of Testing labs from the Egyptian Accreditation Council (ISO) andextending scope with 2 new performance labs with zero overall Nonconformities Show less

      • Act. Head of Air Conditioning & Ventilation Testing laboratories

        Jun 2023 - Dec 2023
      • Senior Quality labs Engineer

        Nov 2020 - Jul 2023
      • Quality Engineer

        Nov 2019 - Nov 2020
    • Beko Global

      Jan 2024 - now
      Sr Specialist - R&D System Design & Testing Engineer
  • Licenses & Certifications