Ezeddine Selmi

Ezeddine Selmi

Stage ouvrier

Followers of Ezeddine Selmi586 followers
location of Ezeddine SelmiFrance

Connect with Ezeddine Selmi to Send Message

Connect

Connect with Ezeddine Selmi to Send Message

Connect
  • Timeline

  • About me

    electrical engineer

  • Education

    • Enig

      2013 - 2016
      Automate programmable PLC-SIEMENS S7-300 S7-400-S7-1200 & S7-1500-tia portal-profinet& profibus DP
  • Experience

    • Cycle combine sidi abhmed (steg)

      Jul 2014 - Aug 2014
      Stage ouvrier

      -industrial environment coverage-industrial maintenance of equipment (transformer, motor, base voltage panels)-reacts to serious situations such as voltage drop, electricity production block failures-know new technology in electricity production-measurement and instrumentation-regulation and speed variator-programmable controller and graphical interface-electric path for HT and LV installation

    • Leoni wiring systems

      Aug 2014 - Sept 2014
      Stage ingenieur

      Leoni is the first employer in Tunisia- creation of an electrical control table for car electrical wiring Germany porch followed by the autocad plan while respecting customer requirements-know the different stages of producing automotive wiring from the study phase through production to packaging and export- cutting - assembly - technical inspection-reacts with the company's internal and external audits-correct the complaint and observations of German customers

    • Poulina Group Holding

      Jan 2016 - Jun 2016
      Projet fin d'etude

      design and creation of a labview application which allows perfect management of water consumption at the MAZRAA company-the overconsumption of water in this company requires following a modern strategy based on technology in order to minimize it-an application based on a labview interface and an Arduino card which allows the acquisition of information from a meter transmitting chargesthe goal is to determine the number of m3 of water and the water flow rate in order to trigger an alarm in the event of anomalies Show less

    • Leoni wiring systems

      Aug 2016 - Nov 2016
      Stage d'integration profesionnel

      technical service in a leading German company in automotive wiring (Mercedes, Porch, BMW, Audi)-quality control of electrical cable using a BAK electrical table

    • EMEM

      Feb 2017 - Mar 2018
      Project Manager

      Prepare technical and financial offer files, execution plans, equipment installations• Costing and management of projects, consultation of suppliers, site requirements,• Monitor and control project work according to the required technical specifications.• Follow Installation of medium transformation stations, MV cells, low voltage panel generator,outdoor lighting, industrial electricity, and building• Manage customer technical complaints.Completed project :• Habitation and extension of Monji slim- marsa hospital “electrical and plumbing lot”• Temporary installation of Rades c power plant site Show less

    • INDUSTRIEL PROCESS services

      Mar 2018 - Dec 2019
      Electrical Engineer

      Manage the Control Room.Water treatment .Water quality.The electric coat of arms and the electric motor.Seawater desalinationSchneider automatons..

    • Cowaterindustry

      Jan 2020 - now
      Project Manager

       Preparation of electrical power balance sheets,h preparation of lighting calculations, Developmentof the layout plan, cable routing plans, Cable schedules.Design and electrical cabinets and sizing of cables using AutoCAD 2D,installation details for lightning protection, including the material specification.Preparation of the "basis design" of electromechanical equipment and electrical machines,automatic plans and housing. Establishment of grounding calculation Suitable for national and international applications that concern hydraulic equipment, electricalappliances and electrical appliances. Consultation with suppliers on the best financial offers, techniques,Developer of available techniques, financials, plans for executions and installations of equipment.Control and management of project work according to the required technical specifications. Installation and commissioning of pumping station project and electrical and electromechanicalequipment until the final acceptance phase with the client according to technical requirements andinternational European standards manage maintenance tasks for MV/LV station, electric motor, centrifugal pumps, compressor,measuring instrument, electric hoist handling systemmanage customer technical complaints.Project completed:Project to strengthen and secure the south bank of BizerteTransfer work for the Gamgoum dam “lot III hydromechanical and electrical equipment”(450m3/h)Strengthening the Bejeoua pumping station on the Mejerda Cap-bon canal “Supply and assemblyof hydromechanical and electrical equipment for the seventh pump”(2.1m3/sRehabilitation of the “SP1” raw water pumping station at the water treatment complex in Ghedir elGolla (phase 2)Construction and equipment of the new sp 5 belli treated water pumping station(capacity4.4m3/s)supply and replacement of a 5.5kv ,650kw medium voltage three-phase asynchronous motor withcage rotor at the el herry sidi ismail complex Show less

    • TVA Engineering

      Jan 2025 - now
      Technical Consultant
  • Licenses & Certifications

    • PLC-SIMENS S7-300-S7-400-S7-1200&S7-1500-TIA Portal-profinet&profibus DP

      High tech learning
      Jan 2018
    • Photovoltaique

      Dec 2017
    • C++tutorial course

      SoloLearn
      Jun 2017