Mohamed Faizal B.E (EEE)

Mohamed Faizal B.E (EEE)

Jr Quantity Surveyor

Followers of Mohamed Faizal B.E (EEE)610 followers
location of Mohamed Faizal B.E (EEE)Saudi Arabia

Connect with Mohamed Faizal B.E (EEE) to Send Message

Connect

Connect with Mohamed Faizal B.E (EEE) to Send Message

Connect
  • Timeline

  • About me

    Senior MEP Quantity Surveyor at MIE-TECH Engineering

  • Education

    • M.I.E.T Polytechnic College

      2004 - 2007
      D.E.E.E Electrical and Electronics Engineering

      الأنشطة والجمعيات:Cricket team

    • Anna University Chennai

      2007 - 2010
      Bachelor of Engineering (BE) Electrical and Electronics Engineering

      الأنشطة والجمعيات:Cricket team captain

  • Experience

    • Ideal Construction Solutions

      May 2010 - Sept 2012
      Jr Quantity Surveyor

      • Review all payment applications submitted by subcontractors.• Detailed Study of Subcontract documents.• Verifying Bill of Quantities as per drawings and specifications.• Inspection of Material on Site claims and Material off site claims.• Joint review with a subcontractor and close the issues if needed.• Checking of sub-contractors quantity as per the approved MIR, RIW and shop drawings.• Preparing an assessment sheet, recommendation letter, measurement and summary sheets for a certifying quantity and get approval from senior contract administrator before submit to cost control.• Prepare & maintain records of all subcontractor agreement and payments• Working closely with Project Team to ensure that all progress payments are in accordance to approve on the project. عرض أقل

    • Control & Applications Emirates LLC

      Oct 2012 - Dec 2013
      Electrical Quantity Surveyor

      • Detailed Study of Contract documents.• Quantity take-off from the approved MIR, RIW and shop drawings. • Preparing a measurement and summary sheets for the claimed items. • Submitting the monthly payment certificate to the client with prepared substantial documents. • Joint review with the client for a payment certificates.• Negotiation with client for submitted variations and finalizing the quantities and rates. Issuance of Site Instructions to related subcontractors.• Monitoring the progress, engineering design process, material and equipment procurement and construction and commissioning status with respect to commercial impacts on the project.• Preparing Biweekly report as per approved documents and submit to client.• Evaluation of variation and finalization عرض أقل

    • Faithful+Gould

      Feb 2014 - Mar 2018
      MEP Quantity Serviour

      This is King Abdulaziz International Airport Expansion project. Working as a consultant.Facilities Handling in King Abdul Azeez International Airport (KAIA), Saudi:• Load Centers and Utilities – Three Billion SAR in KAIA Project• Detailed Study of Contract / Subcontract documents.• Packaging of different trades.• Verifying Bill of Quantities as per drawings and specifications.• Preparation of Measurement (Quantity Takeoff) sheet for all items within our scope of works.• Payment with Client negotiation.• Submission of Monthly Interim Payment Application to Main Contractor / Client.• Follow up of Payment Certificate from Main Contractor / Client.• Preparation of Payment certifications to Subcontractors / Suppliers.• Procurement log update on every week• Forwarding enquiries to subcontractors and Suppliers.• Preparing Bid Comparision Sheet for received quotations.• Prepare Local Purchase Orders (LPO) to Suppliers.• Prepare draft Subcontract Letter of Acceptance / Agreement to Subcontractors.Cost Report:• Updating all logs such as Subcontractors Log, Purchase Order Log, Variations Order Log, Subcontractor’s Variation Order Log, Preliminaries Log. عرض أقل

    • Arabian Construction Co.

      Apr 2018 - May 2022
      MEP Quantity Surveyor
    • MIE-TECH Engineering Ptd Ltd

      Jun 2022 - now
      Sr. MEP Quantity Surveyor

      - Detail study of tender documents and drawings.- Rising tender queries from received tender documents. - Preparing documents for RFQ (Request for Quotation) as per trade wise.- Sending RFQ to the Subcontractors. - Quantity take-off as per the tender drawings.- Preparation of BOQ as per the tender documents and drawings.- Make discussion with management and pricing the items in the BOQ. - Submitting the tender documents to the client with respective documents.- Preparing and issuing of LOA (Letter of Award) to the subcontractor.- Preparation of variation as per drawing change and submitted to the client.- Preparation of interim payment and submitted to commercial manager to get approval. - Checking and certifying monthly interim payment as per approved documents for subcontractors. عرض أقل

  • Licenses & Certifications

    • Primavera P6 Enterprise Project Portfolio Management 8 Certified Implementation Specialist

      Sys Cad Training Center
      Dec 2017
    • Auto Cad

      Autodesk
      Oct 2012
    • Expertise in Switch Gear

      GJ SWITCHGEAR CONSULTANT
      Feb 2012