
Timeline
About me
Director
Education
.webp)
Institut teknologi bandung (itb)
2000 - 2006Bsc computer engineering, electrical engineering department
Experience

Dge for nokia siemens networks
May 2006 - May 2008Transmission access and ddf planner• Responsible for Jakarta region (May 2006-January 2007) and West Java region (January 2007 – May 2008).• Responsible for all aspects of region access / core traffic planning • Completes Nominal Transmission Plan • Advance planning for each site to make sure the next activity or department is ready to be completed without delay• Performing link and path calculation and specifies equipment and parameters• Performs capacity and system availability calculation.• Responsible for region IP DCN access (IP Planner)• Field survey coordinator• Reviewing ATP (Acceptance Test Protocol) after installation finished whether inline with MW link budget, example dish alignment, RX level, error rate, etc. Show less

Nokia siemens networks
Jun 2008 - Jun 2008Backbone planner hcpt projectTemporary Position• Issuing Backbone link budget• Give solution for Backbone link problem to Managed Service

Nokia siemens networks
Sept 2008 - Jun 2010Spesific role as strategic planner in NMSA (Managed Service Planning) for HCPT• Strategic planner is a position that needs knowledge and ability in all aspect of transport networks. This role has to support backbone planner, access planner, IP planner, mux planner.• Create Power Budget for Fiber Optic protection path.• Reviewing and optimizing transmission access design from all regions.• Responsible for networks performance including Backbone (microwave, fiber optic, DWDM) and Access (microwave) for planning part. For example microwave backbone or access link down due to reflection, multipath fading, or interference and create solution for problem occurred.• Create synchronization plan for backbone.• Create protection plan for Backbone traffic such as OMAL, TRAU, IP Backbone, Gb, etc• Validate any transmission activity in live networks• Analyze and evaluate from spectrum analyzer output to set new SDH frequency or interference problem Show less
Transport Networks Specialist HCPT Project
May 2006 - Jun 2010Strategic Planner NPA HCPT Project
Sept 2008 - Apr 2009

Nokia siemens networks
Sept 2010 - Jun 20112g & 3g transport & rnc planning indosat project• Create data fill and DCN IP assignment for Flexi Packet (IP Based Microwave)• Design of radio system propagation and capacity plan according to client requirements, equipment and ITU specifications for Sumatera Area• The calculation of radio frequency and Interference plan.• Report directly to Transmission Manager.• Create synchronization plan for Flexi Packet.• Site survey coordinator, collect accurate site information to dimension the networks accurately• The calculation of quantities of types of equipment to dimension networks (Bill of Quantity)• Reviewing ATP (Acceptance Test Protocol) after installation finished whether inline with MW link budget, example dish alignment, RX level, error rate, etc.• Create RNC and IuB datafill for ATM and Native IP based.• Detail transmission Capacity Planning for : new NE and Upgraded NE• Update 3G & 2G System Plan & Network Architecture• Transmission planning for Rehoming & Reparenting• Transmission project Progress tracker update & closing• Planning 3G RNC, IuB, IuCS, and IuPS• IuB ATM/ IP Networks Planning for NodeB, (S)AXC & RNC• RNC datafill for integration• Detail AXC datafill configuration• Progress 3G Roll-Out NodeB/IuB - RNC Implementation• Support 3G Traffic migration (ATM to IP Based ) via Metro-e, Cisco, Tellabs series Show less

Nokia solutions and networks
Feb 2012 - Apr 2015Working for APAC project in Global Delivery Center with specialist compentence in LTE Radio Optimization, LTE Radio Planning, 3G RF Radio optimization, RNC, IP, Transport Planning and Optimization. December 2014 – Current LTE RF Planning Team leader, XL Axiata, NOKIA, Indonesia• RF Planning team leader, lead 28 persons working for Axiata XL bidding• Create strategic guideline for RF planning in XL bidding• Elaborate with solution and KPI team to comply the RFP given by XL• Technical clarification and consultancy with costumerLTE RF Trial – Optimization and Planning October 2014 – February 2015, XL Axiata, NOKIA, IndonesiaMay – June 2014, Smartfren, NOKIA, IndonesiaNovember - December 2013, Telkomsel, NOKIA, Indonesia• Parameter setting planning for commissioning• Optimization & DT analysis for acceptance 20 trial sites XL• Parameter and physical tuning to achieved peak and average throughput• Create coverage plot using ATOLL• Create networks dimensioning using RANDIM• Interference clearance• Overshoot clearanceLTE RF OptimizationSeptember 2013 – October 2014, HFTI, NOKIA, Philippine• DT analysis and troubleshoot problem spots to achieved KPI target• Worst cell troubleshooting• Create NCR (Network Change Request) for changing parameter• Post optimization activity• Monitoring performance BTS• Discrepancy neighbors and optimization• Pilot Pollution & overshoot clearance.• Meeting and Reporting with Customer.• AcceptanceJune 2013 – January 2015 LTE RF planner for bidding (presales) – LTE & LTE AdvancedSingTel, NOKIA, SingaporeAIS, NOKIA, ThailandSmarfren, NOKIA, IndonesiaP1 & Telekom Malaysia, NOKIA, MalaysiaGlobe, NOKIA, Philippine• Create coverage plot using ATOLL• Create networks dimensioning using RANDIM• Create capacity planning• Support radio solution for some cases like interference mitigationLTE and 3G RF Trainer support Nokia AcademyTraining material:• 3G Radio Specialist (RU40 & RU50)• LTE Radio Planning (RL40) Show less • Daily performance close monitoring for HSDPA/HSUPA RU20 use Netact Reporting Suite, RNC KPI CSSR CS and PS, RRC Success Rate, RAB Success rate, CCSR, SHO, ISHO, HSDPA Accessibility and Retainability, HSDPA throughput and Data Volume, Cell available and etc.• RNC Owner for 2 RNC in South Sumatera area.• Worst cell justification and action for daily and weekly basis.• Create HCR (Hardware Change Request) for alarm escalation and clearance to Indosat Team.• Post optimization activity for 3G HSPA Networks.• Monitoring performance RU20 BTS WN6.0; RNC MP.6 software upgrade.• Discrepancy neighbors and optimization both for SHO, ISHO.• Pilot Pollution clearance.• Weekly Meeting and Reporting with Customer.• Overshoot clearance Show less
Subject Matter Expert (SME) - Radio and Transport Domain
Mar 2013 - Apr 2015Access & IP Planning BSC Indosat Project
Jul 2013 - Sept 20133G Radio Optimization Indosat Project
Feb 2012 - Jun 2013

Nokia siemens networks
Apr 2012 - Apr 2013• Access Transport Capacity Optimization, KPI Measurements and counters • RNC Audit Performance & Analysis • IuB, IuCS, IuPS - IuR Capacity Monitoring• WBTS, AXC, RNC Configuration & Analysis• DMPG and ICSU Load monitoring• Statistic data collection, reporting, propose optimization plan, and upgrade if necessary • Troubleshoot the transmission problem and determine the problem causes, provide recommendation and advices• Abis Transmission performance and availability• PCM failure trend and contributor Show less
3G Transport & mcRNC Planning HCPT project
Jul 2012 - Apr 20132G & 3G Transport Optimization & Performance Indosat Project
Jul 2011 - Jun 2012RNC & Transport Pre sales XL tender
Apr 2012 - May 2012

Sofrecom indonesia
May 2015 - Jan 2016Senior radio consultant• Consulting non Networks and Services domains related to Radio for Asia Hub• Provide training to the costumer• Support pre sales• Organization, Provision, Management of consulting services• Managed radio project• Capitalization

Telkom infra
Feb 2016 - Jan 2017Lte strategic optimization - telkomsel project- National Strategic Optimization for Telkomsel Project with vendor NOKIA, ZTE, Huawei, and Ericsson- Create strategic guideline to regional team regarding features and parameter optimization for Radio LTE and 2G/3G/LTE Transport- Give consultancy/advise to Telkomsel- Conduct trial for LTE new features- Conduct LTE networks assessement and give recommendation for improvement- Support VIP complain for special casesSelected achievement:• Ericsson LTE network assessment in Telkomsel Kalimantan and Sumatera region• Huawei LTE network assessment in Telkomsel West Java and Central Java region• ZTE LTE network assessment in Telkomsel Sulawesi region• Nokia LTE network assessment in Telkomsel Bali, Kalimantan, and Papua regionAssessment activities:o Increase productivity (payload) and UE battery power saving by adjust idle and connected mobility parameter with acceptable trade offo Improve CSFB time o Change RBG allocation to improve DL throughput from Round Down setting to Adaptive settingo Reduce UL interference by adjust RACH power, Nomimal PUSCH power, alpha pathloss compensation, PUCCHo PCI Conflict improvemento Handover Success Rate improvemento Bad spot analysiso To improve UL throughput by optimize PUCCH capacity and increased number of usero Reduce UL interference and improve UL throughput by created longer CQI reporting period Show less

Huawei technologies
Feb 2017 - Aug 2017Senior optimization engineer / lte expert• Conduct LTE networks assessement and give recommendation for improvement including parameter recommendation, feature recommendation, transport analysis, and physical optimization. o Parameter Asessment: observe from dump which parameter setting still not optimum or not propero Feature Assessment: observe from dump which features is proper to be enabled for better networks performanceo Coverage Assessment: Analyze overshooting cells with consideration of RACH Success Rate, Timing Advanced anaylsis, Drive Test resulto Capacity Assessment: Analyze which cells has congested capacity with consideration of user experiencseo Transport Assesment: Analyze transport based on RTT delay and packet loss• Conduct trial for LTE new features• Handle VIP Complain for special case• Cluster optimizationSelected achievement:• Network assessment conduct for all central region networks (10 city) Show less

Sofrecom
Sept 2017 - Jun 2018Ran & transport expert / consultantHired to deliver consultancy services in RAN domain (Radio, Controller & Transport) as below:• Indosat Project, Indonesia: E2E Planning Tools Integration and Assessment. Assigned to assess planning process in RAN domain (LTE, 3G, 2G) and give recommendation for improvement• Telkomsel Project, Indonesia: NetOptim Project to review the 3 years of TrueBEx program and TelkomInfra’s role. Take role for Network Optimization Assessment.• Ministry of Communication and Information, Indonesia: Give consultancy and supervision for fiber optic (land and submarine) and microwave network roll out nationwide (Palapa Ring Project) Show less

Hutchison 3 indonesia
Jun 2018 - Jan 2022Manager strategic radio planning
Pt. alfary modula teknologi
Jan 2022 - Oct 2024Director-Monitoring build progress, overseeing finance and ensuring project quality-Making strategic decisions and providing leadership and direction to project managers to implement those decisions-Meeting with clients, stakeholders and project managers to report on project progress-Liaising with clients and building strong working relationships-Devising cost-effective plans to enable effective project completion-Managing risks to avoid delays or reputational damage-Ensuring permits and legal papers are secured ahead of the project-Managing project managers and enabling them to supervise and manage their own teams Show less
Licenses & Certifications

Juniper networks certified internet specialist
Juniper networksOct 2010- View certificate

Nokia certified solution specialist 3g radio (ncss 3g ra pao 2.0)
Nokia networksNov 2014 - View certificate

Nokia certified solution specialist lte radio (ncss lte ra pao 2.0)
Nokia networksNov 2014 
Juniper networks certified internet associate
Juniper networksJul 2010
Languages
- enEnglish
- baBahasa indonesia
Recommendations

Raveendra thumati
Works at DELLEMCBengaluru, Karnataka, India
Claire conradie
Office Administration and HRPorirua, Wellington, New Zealand
Ahmed saadouli
Operation Engineer at Ras Girtas Power Company ( IWPP 2730 MW & 63 MIGD )Qatar
Emily yunes
Coordinator at Northern Essex Community CollegeHudson, New Hampshire, United States
Everett gorel
Director/ DPHouston, Texas, United States
Lorena gil peña
I Marketing Strategist I Strategy & EntrepreneurshipBelgium
Janet adams
Financial Aid Specialist at Porter and Chester InstituteNew York City Metropolitan Area
Olivia white
Sales, Communications, MarketingCharlotte, North Carolina, United States
Kristin burke
Sr. Operations Project Manager at JLL (Xerox account)Wilmington, Ohio, United States
Marcia dietz
Sales Manager, Team Builder, Customer Service, Public SpeakingEllicott City, Maryland, United States
Mohammed aamir
Performance Marketing Manager | Digital Innovation | Performance Marketing | eCommerce | Persuasion ...Dubai, United Arab Emirates
Nalongded luanglath
Innovative Entrepreneur & Managing Director | Building the Future of Tyre Industry in Laos | Passion...Vientiane Capital, Laos
Eduardo andrés monras gunther
Civil Electrical Engineer, interested in Artificial Intelligence, Machine Learning and Robotics.Berlin, Berlin, Germany
Ashish balaji
AWS | EC2 | IAM | CLOUD WATCH | DEVOPS | DOCKER | TERRAFORMChennai, Tamil Nadu, India
Nibin koshy
أونتاريو هاميلتون كندا
José sanmartin
Conseiller en Gestion de Patrimoine certifiéPamiers, Occitanie, France
Lauriane bénard
Éducatrice spécialiséeRouen et périphérie
Krista gerner
Experinced Teacher, Director, and ManagerAnderson, California, United States
Ali chami
senior sales specialistBeirut, Beirut Governorate, Lebanon
Brad groeneweg ea caa lpa cpa cga
Principal, US Tax Baker Tilly Trillium LLPLondon, Ontario, Canada
...