Atef Zreik Farhat

Atef Zreik Farhat

Structural Engineer

Followers of Atef Zreik Farhat313 followers
location of Atef Zreik FarhatUnited Arab Emirates

Connect with Atef Zreik Farhat to Send Message

Connect

Connect with Atef Zreik Farhat to Send Message

Connect
  • Timeline

  • About me

    Projects Director at International Foundation Group L.L.C - Dubai - U.A.E

  • Education

    • Joul Jamal - Lattakia - Syria

      1976 - 1977
      Bachelor of Science (B.Sc.) in Civil Engineering

      Normal School Student up to 12th Grade

    • Tishreen University

      1977 - 1982
      BSc - Civil Engineering Construction Engineering

      Civil Engineer

  • Experience

    • Military Housing Establishment

      Oct 1982 - Sept 1990
      Structural Engineer

      - Structural Engineer in Military Housing Establishment (Design & Site Work) in Lattakia, Syria- Participation in the structural design works of parts of Al Assad Sport City in Lattakia including ( The Halls Complex, Utility Building, Administrative Building, Footbridge, Chivalry & Shooting Club and various landscaping works.

    • General CO. for Engineering & Consulting - GCEC

      Oct 1990 - Apr 1995
      Senior Structural Engineer

      • Senior Structural Engineer for reputed Consultant Agency ( General Co. for Engineering & Consulting –GCEC), Syria. -Head of Supervision Team in Lattakia, Syria.

    • OWN Engineering Office

      Mar 1995 - Oct 1999
      General Manager

      • Independent Engineering Office in Lattakia – Syria- Structural design and supervision over execution of ( Industrial works and warehouses for JOUD Trading Co. & ZEIN Trading Co.) and ( Several residential buildings &SOUFAN Mosque in Lattakia ). - Supervisory engineer of Al-Mirsate Housing Cooperative, Al Sham Cooperative in Lattakia.

    • Middle East Foundations Group

      Oct 1999 - Sept 2011
      Sr. Projects Manager

      Senior Projects Manager for many Projects like• Golf Tower II , Golf Tower III , PQRST Project ,Marina Tower & Two Nos. of Bridges in Dubai Marina, for Emaar (Enabling works).• Emirates Hills (Al Hashemi) 24 Building – 4500 Piles for Emaar.• Emirates Hills (Norr) Emaar Office Building 4 Bldgs – 640 Piles.• 21st Century Tower 53 Story (1.2 dia Piles, 46m depth) for Al Rostamani.• Marina Residence Tower (Enabling Works).• Al Yassat Tower at SH. Zayed Road (398 Piles) for Al Gaith Holding.• Emirates Crew Training Center- Al Garhood for Fly Emirates.• Ministry of Labours- Qusais• Internet City (5 Bldgs).• Dubai Islamic Bank (Diaphragm Wall + Excavation + Dewatering) • Sajwani Office building in Tecom (Diaphragm Wall + Piling)• 4B+79 Floor Building for Mr. Tayeb Khoori in Al Barsha (Secant Piles & Soldier Piles + excavation + dewatering )• Sulafa Tower In Marina (Shoring , Piling & Other activities )• Marina 101 (Shoring and Piling and other activities)• First Gulf Bank in Al Barsha ( Shoring ) • Shahla Tower (In Marina)- (Secant Piles+ 226 Piles)• Cluster K ,3 Towers in Jumerah Lake Tower .• Grosvenor House Hotel for Shk. Ahmad Bin Saeed Al Maktoum.The following up works for the above projects included many items like ( site requirement, submittals, detail programs, site activities follow up, payment applications, daily reports, weekly reports, monthly reports, coordination with authorities, project meetings attendance with Client/ Management/Consultant, and other required following up to hand over the projects to the Consultant ). Other Works:- Re design of the piles for many projects along with the design team. - Working with the Tender department for preparation of the Quotations and Offers for piling and shoring for many projects.- Checking of the pile as built and redesign the loads on the piles.- Static load test reports preparation. Show less

    • Huta Foundation

      Oct 2011 - Dec 2014
      Sr. Project Manager

      Work as Sr. Project Manager in Huta Foundation for the following projects:1 - The Kingdom Tower - Jeddah - K.S.A ( from Nov. 2011 up to February 2012 ) : for the test stage ( 1500 mm Dia. piles with 49 m & 78 m depth - Installation including different tests on the piles like - Koden, Caliper logging, Cross hole sonic, integrity & static test using O-Cell system, the piles working load is 3750 Tons and the applied load was 11250 Tons.2 - Expansion of King Abdulaziz Airport - Jeddal - K.S.A ( from March 2012 up to Aug. 2013 ):2500 piles in Elevated Road ( 1200 mm Dia. piles - 45 m to 70 m depth piles - Maximum working load is 1300 Tonsm the applied test load is 1950 Tons, ( Reaction piles system ). 3 - Expansion of Haram in Al Madina Al Munawwara - K.S.A ( from Sep.2013 up to Dec. 2014 ) :Shoring of 500 L.M , secant piles system, 1200 mm Dia. and 33 m to 48 m depth with one layer of anchors.First stage of piles for 950 piles ( 1200 mm Dia. and 55 m to 74 m depth, drilling in the Basalt ), Working load of 2260 Tons, test load for Main piles 3390 Tons and for PTP piles 4520 Tons using the Reaction System, 100% of the piles tested for the cross hole sonic. Show less

    • Middle East Foundations Group L.L.C

      Jan 2015 - now
      Senior Projects Manager

      Period : 04-01-2015 till date M/s. Middle East Foundations Group L.L.C Dubai, U.A.E Senior Projects Manager

    • Dutch International Contracting Company LLC

      Jul 2020 - May 2021
      Construction Manager
    • INTERNATIONAL FOUNDATION GROUP L.L.C.

      Jun 2023 - now
      Projects Director
  • Licenses & Certifications

    • BSc Civil Engineering

      Tishreen University - Lattakia - Syria
      Oct 1977