Glen Carter

Glen Carter

Project Engineer

Followers of Glen Carter263 followers
location of Glen CarterTrinidad and Tobago

Connect with Glen Carter to Send Message

Connect

Connect with Glen Carter to Send Message

Connect
  • Timeline

  • About me

    Highly Skilled Project and Construction Manager/Engineer

  • Education

    • San Fernando Technical Institute, Trinidad

      1984 - 1987
      Technician Diploma Construction Engineering
    • The University of the West Indies

      1988 - 1991
      Bachelor's degree Mechanical Engineering
  • Experience

    • Damus Limited

      Jan 1991 - Jan 1995
      Project Engineer

      Executed multiple construction projects within the petroleum and petrochemical industries. Projects including fabrication and installation of process plant piping, pipelines and structural steelwork, fabrication and erection of water, oil and diesel storage tanks, mechanical equipment repairs/installation, concrete foundations, EI&C works and blasting & painting.

    • SNC Lavelin Trinidad Limited

      Jan 1995 - Jan 1997
      Field Piping Engineer

      Petrotrin Point-a-Pierre Refinery Upgrade Project:Played integral role in project planning and execution for unit upgrades and construction of a new grassroots plant from spool fabrication to erection phase. Some responsibilities included revision of piping isometric drawings, compilation of steam tracing nomenclature and schedules, development of hydrotest packages and post hydrotest verification of system mechanical completion.

    • Amoco Trinidad Oil Company

      Jan 1997 - Jan 2000
      Project Engineer

      Engineering & Construction: Liaised with Facilities Engineers and Upsteam Development Team Engineers to plan, manage and execute several on-shore and off-shore projects for Amoco’s Oil Asset and Terminal Operations. Prepared scope of work, project schedule and cost estimates, monitored and reported on project performance, and provided quality assurance for projects such as Teak field sea flare tripod repair, Teak E platform vent boom installation, Galeota Point Terminal flare upgrade, Teak-AP platform to Teak-B platform 8-inch subsea coflexip pipeline installation and Cassia platform to Teak-AP platform 8-inch subsea condensate pipeline and riser repair. Show less

    • BP Amoco Energy Company of Trinidad & Tobago

      Jan 2000 - Jan 2003
      Project Engineer

      Kapok Project:Project Engineer on client Project Management Team responsible for design and installation of two major offshore platforms for Trinidad. Total Facilities Cost US $270 million.- Conducted feasibility study, and convinced Senior Management to build major components in Trinidad.- Developed construction plan and recruited key employees to work at the construction site.- Identified and managed risk associated with fabrication, assembly and load-out of platform components.- Interfaced with Engineering and Fabrication Contractors to provide constructability input during design and resolve EPC issues in the field. - Reviewed and approved Fabrication Contractor safety and work execution plans to provide assurance that platform components were fabricated in accordance with approved ICF drawings, codes, standards and project specifications.- Proactively managed safety of all project personnel including Contractors in the fabrication yard and delivered quality components on schedule and within budget. Show less

    • BP Trinidad and Tobago LLC

      Jan 2003 - Jan 2007
      Project Manager

      New Oil Export Loading (NOEL) Pipeline Project: Successfully managed design and installation of a new 30-inch pipeline, Pipeline End Manifold and Single Point Mooring system. The selected route included a revamp onshore portion, a complex HDD shore approach and offshore pipelay. Total Facilities Cost US $80 million. - Evaluated and awarded EPC contracts and monitored Contractor performance to ensure compliance with BP’s quality and safety standards.- Recruited, coached and supervised core team of 15 technical and professional staff; led team in developing project execution plan and risk management plan, and coordinated project assurance activities such as HAZOP, BRISK and ALERT to effectively manage risk throughout the project.- Developed and implemented Action Tracking Matrix and conducted cost, schedule, safety and technical reviews to ensure timely achievement of project deliverables. - Prepared reports and facilitated review meetings to inform Project Team and Senior Management of project status; submitted Financial Memorandum and Authorization for Expenditure to Senior Management to secure approval and funding for each phase of the project.- Overcame challenge of managing complex interfaces; was innovative taking advantage of delay to change and optimize pipeline route. - Liaised with BP’s Health, Safety and Environment (HSE) Department and the Environmental Management Authority (EMA) to conduct Environmental Impact & Social Assessment; obtained Certificate of Environmental Clearance and proactively managed HSE performance throughout the project to ensure that all project activities were executed in accordance with BP and local regulatory standards.- Maintained good communications with external stakeholders including representatives from the Ministry of Energy and community-based non-governmental organizations to provide timely project updates and solicit feedback. Show less

    • Carillion (Caribbean) Limited

      Jan 2007 - Jan 2012
      Project Engineer

      PROJECT: BPTT TERMINAL FIREWATER PUMP RELOCATION PROJECT • Provided ready and reliable technical support during the development of work procedures and lift plans for civil, piping and structural works.PROJECT: EOG KISKADEE PLATFORM STRUCTURAL REPAIRS AND REFURBISHMENT PROJECT • Successfully managed and led the fabrication and installation of new/replacement piping and structural steel, including scaffolding, lifting & rigging and painting work.PROJECT: NMWG/BPTT IMMORTELLE PLATFORM HELIDECK UPGRADE PROJECT • Developed efficient lift plans and procedures for the lifting and handling of helideck components (pipe trusses and structural frames/modules ranging from 7 to 22 Ton) in the Fabrication Yard.• Coordinated mock-up fit-up procedure for assembly of helideck components in the Fabrication Yard to verify fit-up before load out and shipping of helideck components offshore.PROJECT: DYNAMIC/BHP BILLITON ANGOSTURA GAS PROJECT • Successfully managed and led shop the fabrication and supply of resources (including labour, materials and equipment) for offshore construction and commissioning support works. PROJECT: NGC TOBAGO GAS RECEIVING AND METERING FACILITY PROJECT • Successfully managed and led the fabrication and installation of underground piping systems, structural steel pipe racks and perimeter fencing works.PROJECT: PETROTRIN NHT & CCR PLATFORMER COMPLEX PROJECT • Generated comprehensive method statements for civil and piping works.• Planned and coordinated major temporary works for the design and installation of formwork support systems for suspended and elevated concrete slabs. • Identified test packages, test pressures and test limits/boundaries for utility and process piping systems. PROJECT: PPGPL PHASE III GAS PLANT EXPANSION PROJECT • Successfully managed and led the delivery of civil and road works. Show less

    • WorleyParsons Trinidad Limited

      Jan 2012 - now
      Construction Interface Manager/Project Manager

      PROJECT: ATLANTIC ENGINEERING MSA PORTFOLIO • Effectively led/managed constructability input during engineering design, provided construction and procurement support and interface coordination with Customer, construction Contractors and Engineering during the selection, design and execution of multiple onshore brownfield engineering projects through Select, Define and Execute Phases some of which were driven by Turnarounds / Shutdowns.• Successfully led/facilitated planning and preparation works for Project Constructability Reviews. • Key participant in 3D Model / Design Reviews, Risk and Opportunity Reviews and Customer Value Assurance Reviews. • key projects included:o Train 1 and Common Facilities Life Extension. o Effluent Management Sewage Treatment Package (STP) Upgrade Trains 1 & 4.o Cold Temperature Metal Embrittlement (CTME) Train 4 Packages 1 & 3 Piping CS-SS Change Out. o Train 4 Regeneration Gas Circuit Upgrade.o NGL Stabilization for All Trains o Instrument Air Upgrade All Trains.PROJECT: MULTI-CUSTOMER MISCELLANEOUS PROJECTS PORTFOLIO • Effectively managed a project team of 12 people while spearheading the delivery of multiple miscellaneous brownfield engineering projects (onshore and offshore). • Successfully led the selection definition and execution of projects stages while ensuring timely completion, within the set budgets. • Established close working relationships with Customers, including BPTT, BGTT, BHP Billiton, Repsol and NGC.• Key projects included:o BHP Billiton Crude Oil Transfer Pumps Replacement CPP Platform.o BGTT Instrument Air and Nitrogen Upgrade Dolphin Platform / Beachfield.o BGTT Mahogany B Platform Hub Bypass.o NGC Third Emergency Bypass and Condensate Tank. Show less

  • Licenses & Certifications

    • Registered Engineer

      Board of Engineers of Trinidad and Tobago
      Jan 2003
    • API-510 Pressure Vessel Inspector Certification Program

      API - American Petroleum Institute
      Jan 2000
    • API-570 Piping Inspector Certification Program

      API - American Petroleum Institute
      Jan 1998
    • Project Management Professional

      Project Management Institute
      Jan 2003
    • API-653 Tank Inspector Certification Program

      API - American Petroleum Institute
      Jan 1999