
Engr Naveed Ashraf

Connect with Engr Naveed Ashraf to Send Message
Connect
Connect with Engr Naveed Ashraf to Send Message
ConnectTimeline
About me
BE(Chemical) / RE(PEC) Cement /Aggregate /Asphalt / Concrete Operations / Production / Process / Optimization
Education

Government Islamia College (Civil Lines), Lahore.
2001 - 2003F.Sc. (Pre-Engineering) Science
Government Central Model High School, Lahore.
1999 - 2001Matriculation Science
NFC IET Multan
2003 - 2007B.Sc (Engg), Chemical Engineering SPECIALIZED IN PETROLEUM REFINERY ENGINEERING
Experience

Maple Leaf Cement Factory Limited
Jun 2007 - Nov 2011Working as Assistant Manager (Production) in Maple Leaf Cement Factory (Kohinoor Group), Phase-II. The plants 4000 tpd & 6700 tpd for Gray Cement (OPC) have been supplied by FLSmidth in Denmark. The 4000 tpd plant has single string ILC Preheater Kiln with Grate Cooler and the other 6700 tpd plant has double string ILC Preheater Kiln with Cross Bar Cooler.Working as a Shift Engineer.•Managing the following areas of the plant; Crushers Preheater, Kiln and Cooler Storage Area Clinker Storage Raw mills Cement Mill •Raw materials handling and stocks in the shift.•To maintain the Storage Area and to ensure the smooth operation of Bridge Scrapers for Limestone reclaiming and Side Scrapers for clay reclaiming.•To ensure the smooth operation of Raw Mills both for raw material grinding and raw coal grinding. This area contains two raw mills, one has the capacity of 300 tph and the other has 540 tph. Similarly, one coal mill has the capacity of 30 tph and the other has 45 tph. All raw mills are of the type VRM (ATOX).•To take care of the process parameters of both Kilns, one has the capacity of 264 tph and the other has 450 tph. •To ensure the smooth operations of the clinker grinding facilities. Ball mill has the capacity of 190 tph and that of two OK mills, both have capacities 180 tph. •To adjust and Control the Plant Parameters for the improvement of the Production and to save energy consumptions.•Minimize cost of Production with safe, stable and economical Plant Operation by minimizing stoppages of major equipments.•To run Plant on Optimum conditions at rated Capacity to meet Production Targets.•Profitability and cost reductions are prime objectives of my duty.•To suggest necessary rectifications and improvements.To take part in the shutdowns of different areas of the plants. Show less
Assistant Manager (Production)
Jun 2008 - Nov 2011Management Trainee
Jun 2007 - May 2008

DG Khan Cement Company Limited
Dec 2011 - Sept 2016Deputy Manager (Production)FL Smith’s Plant with double strings, 5 stage Preheater, low NOx ILC Kiln,2Vertical “OK “Roller Mills(Cement Mill) and “At ox” Mills(Coal Mill / Raw Mill)RDF(refuse dry fuel) plant by VECOPLAN Germany, Working Production Engineer (Deputy Manager),1-Under the guidance of HOD (production) & DGM (Works) & GM (Works) to achieve the production targets in a view of quality and cost.2-Planning and executing annual planned shutdown of kiln including refractory replacement.3-Management of Refractory inventory through ERP.4-Troubleshooting and provision of prompt rectification to the problems occurring in material processing at different areas of the plant i.e. Raw Mill, Coal Mill, Kiln, Cement Mill, Packing Plant.5-Regular checking and inspection of process parameters and ensuring their optimum settings to better contribute towards best quality of cement6-Initiation of corrective measures on the basis of physical and inorganic test of samples7-Insuring smooth operation of the plant8-Keeping maximum utilization factor of plant equipment in view, suggest emergency breakdowns necessary to be taken after thorough evaluation of any delicate situation causing serious troubles to smooth operation of the process.9-Insuring Plant shut down measures to be strictly followed before schedules shot down.10-Assigning various shot down responsibilities to the supervisors and checkers during scheduled shut down and have a close monitoring over them11-Supervisor of brick-lining work at pre-heater Kiln & cooler areas Show less
.webp)
CIMKO (NYUMBA YA AKIBA SA)
Sept 2016 - May 2018Process & Optimization Engineerworked at CIMKO cement, another green field project of M/S. FLSmidth,a unit of Lucky Rawji Holding Company, having clinker production capacity of 3000 tons per day, in Democretic Republic Of Congo, erection work of plant entered in the final phase of its completion.

Pioneer Cement
May 2018 - Dec 2023Senior Deputy Manager (Process)Working as a Senior Deputy Manager (Process), of new line-III @ 9000 tpd clinker.
Licenses & Certifications
- View certificate

FLSmidth technical symposium
FLSmidthMar 2014 - View certificate
.webp)
ARTIFICIAL INTELLIGENCE: Implications for Technologies & Business Strategy"
Pakistan Engineering Council (PEC)Apr 2023 - View certificate

Advancing the digital transformation journey
Cemtech Conferences & ExhibitionsMay 2023 
Advancing the digital transformation journey
Cemtech Conferences & ExhibitionsMay 2023
Cement Plant Maintenance and Asset Reliability
Cemtech Conferences & ExhibitionsNov 2023- View certificate

Loesche Grinding Mills Operation & Optimization
Loesche GmbHDec 2020 - View certificate

Grinding systems for modern cements
Cemtech Conferences & ExhibitionsJun 2023 
ISO 14001:2015 - Environmental Management Systems (EMS)
Alison - Empower YourselfDec 2022
Languages
- urUrdu
Recommendations

Christian isaac
Group Head of HR, a Human Resources professional with over 16 years’ experience in various roles wit...Lagos State, Nigeria
Gary huamán rivera
Coordinador Web - La República Deportes | Licenciado | PeriodistaPeru
Ashley gibson
CID+ EngTech MIET // PCB design // Electrical electronics engineerNew Romney, England, United Kingdom
Liz somerville
Director and Senior Leader with a track record of leading and growing an organisation from start up ...Cleish, Scotland, United Kingdom
Peace osian
virtual assistant | Administrative assistant | customer service managementDelta State, Nigeria
Richard nuwagaba
M&E and Technology Manager at Sustainable GrowersUnited States
Namrata saxena
Principal, Asst Prof. Education, Curriculum Head K-12, Prog. Director; Early Years, IBDP CoordinatorThane, Maharashtra, India
Debbie abu-hamdan
Sr Sourcing Manager - Intimates at TargetBrookfield, Wisconsin, United States
Phuc dao
Product Lead at Visily.aiVietnam
Anders nyegaard iburg
Cluster Lead | Leader of Leaders | Digital Transformation | Agile LeadershipCopenhagen, Capital Region of Denmark, Denmark
Magdalena stefan
Senior Manager-Global PayrollBucharest, Bucharest, Romania
Hakan aydoğan
PAN AVIATION & TRADE - Quality and SMS ManagerTürkiye
Aadil chan, ms
Helping Professionals and Businesses Elevate Their LinkedIn Presence to Land Opportunities and Drive...Shaheed Benazirabad District, Sindh, Pakistan
Jefferson neri
Psicólogo/ Gestão por Competências/ Business Partner / Cultura e Clima/ Endomarketing/ Desenvolvimen...Rio de Janeiro, Rio de Janeiro, Brazil
Antoine azouri
Civil, Environmental engineer, Renewable energy, WaSH supervisor | Certified energy auditor by AEEBeirut, Beirut Governorate, Lebanon
Jonatan schwindt
Supply Chain Operations Manager at ENAP ArgentinaArgentina
Muhammad rafay shaikh
Microsoft Certified Azure Data Scientist Associate | Azure DevOps | Git | Data Analytics | PowerBI D...Karāchi, Sindh, Pakistan
Rita desselle
Currently Retired Senior Commercial Escrow Officer at First American Title National Commercial Divis...San Antonio, Texas, United States
Glen sefcik
Executive Leadership Coach at Championship Management Consultants LLCChampionship Management Consultants LLC
Débora camargo
Bradesco | CPA 20Cesário Lange, São Paulo, Brazil
...