Ishrak Zaman

Ishrak Zaman

Junior Project Management Intern

Followers of Ishrak Zaman394 followers
location of Ishrak ZamanSt John’s, Newfoundland and Labrador, Canada

Connect with Ishrak Zaman to Send Message

Connect

Connect with Ishrak Zaman to Send Message

Connect
  • Timeline

  • About me

    Mechanical Engineer, EIT

  • Education

    • Memorial University of Newfoundland

      2017 - 2023
      Bachelor of Engineering - BE Mechanical Engineering
  • Experience

    • Kabir Steel Re-Rolling Mills | KSRM

      Nov 2016 - Aug 2017
      Junior Project Management Intern

      • Worked with construction companies that build roads, bridges, buildings etc.• Utilized MS Project to build schedules, budgets, and cost estimates for materials• Utilized MS Office Suite to prepare work progress reports and drafter paperwork• Utilized AutoCAD to design and review construction blueprints.• Utilized MS Project to analyze workloads and track the project’s progress• Managed and schedules assigned tasks for technicians and constructors for labor work on site Show less

    • The Cahill Group.

      Jan 2020 - May 2020
      Field Operations Engineer ( Co-op 1)

      • Utilized MS Project to estimate materials, labour and equipment costs and budgets based on contractor bids, quotations, schematic drawings and design specifications.• Collaborated with Project Engineers and utilized MS Project to maintain a Progress and Performance Measurement Plan, including tracking project deliverables, managing resource utilization, identifying potential delays, and developing corrective actions to enhance project schedule performance.• Conducted Statistical Tolerance Analysis and applied Geometric Dimensioning and Tolerancing principles to develop sustainable and reliable designs associated with various Piping Systems while ensuring compliance to industry standards and client requirements.• Updated IFC documentation, including modifying construction drawings and highlighting changes as per site installation, and recorded the latest revision number in the Drawing Register spreadsheet using MS Excel.• Assisting the Safety Team in inspecting and maintaining the safety integrity of the workplace by identifying potential hazards and taking immediate actions to rectify the situation. Show less

    • The Cahill Group.

      Sept 2020 - Dec 2020
      Project Engineer (Co-op 2)

      • Assisted Engineers in building Site Query, Concession and Field Work reports, all by using MS Office Suite.• Utilized MS Excel to estimate materials, labour and equipment costs and budgets based on contractor bids, quotations, schematic drawings and design specifications.• Worked with the Engineers in evaluating and analyzing the nature, purpose and the operating procedures of numerous machines and equipment implementation required for various subsystem development.• Developed Procurement Specifications and ordered materials by interpreting company’s purchasing Cost Codes.• Prepared detailed technical deigns and drawing specifications using AutoCAD and SolidWorks to upgrade the auxiliary and power control equipment involved with the Mechanical, Instrumentation, Electrical and Piping Systems. • Optimized AutoCAD to analyze, review, modify and draft multi-dimensional layouts for various power control system equipment: the transformers, VFD’s, 600V Switchgears, Motor Control Centers and Remote I/O unit controllers.• Assisted Engineers in evaluating, analyzing and modifying the mechanical and hardware specifications to adjust the interconnection of the equipment interfaces and the automation systems involved with project’s Control and Instrumentation and the Safety Shutdown Systems.• Provided engineering services in reviewing equipment submittals, designing As-Built and Shop drawings using AutoCAD that resulted in closing 100+ punch lists and responding to client’s inquiries. Show less

    • RothLochston

      May 2021 - Aug 2021
      Filed Engineer (Co-op 3)

      • Utilized MS Excel to assist Engineers in reviewing risk mitigation documents to track and monitor work productivity.• Prepared Engineering Work Order Packages, incorporating Vendor-supplied drawings, O&M manuals and ITP documentation for equipment implementation associated with Radiators, Heat Exchangers and Air Handling Units.• Assisted Engineers in conducting routine maintenance operations to inspect and troubleshoot equipment and pump breakdowns/malfunctions and performed Root Cause Analysis to secure asset’s operational integrity. • Utilized AutoCAD to develop design plans for the High Point Vent (HPV) and Low Point Drain (LPD) setups required for conducting hydrotest operations for pipelines associated with the Eastern Deep Powerhouse’s Glycol System.• Submitted requisitions for pump and pipe fitting spare parts from Vale warehouse, updated Material Take Off spreadsheet in MS Excel, and conducted quantity takeoffs and verification for data accuracy and reliability.• Conducted comprehensive fire hazard risk assessments by analyzing the fire protection layouts, HVAC schematics, and equipment specifications to develop detailed fire protection and emergency response plans.• Collaborated with Safety Team in reviewing Safety Plans and OHSA certifications for Crane operations and updated the HAZOP documentation associated with different Rigging and Lifting devices. Show less

    • Kiewit

      Jan 2022 - May 2022
      Project Controls (Co-op 4)

      • Completed daily field reviews to ensure piping and mechanical equipment were installed as per IFC drawings and contract specifications.• Coordinated meetings with clients and supported Project Engineers in generating detailed RFI packages, performing redline markups on IFC drawings, and ensuring all changes were incorporated into project-progress documentation.• Developed Isometrics and P&IDs associated with new pipelines and the related infrastructures, incorporating assessment and selection of feasible pipeline route alignments, pipeline stations, block valves and compressors.• Monitored cost tracking of project utilities (Hydrovac Excavators, Loaders, Cranes, Boom Pumps, etc.) by applying utility credit rules and updated the database, incorporating billing, payments, incurred and accrual costs, and the planned expenditures.• Assisted in designing Hydrotest Packages for the Product Pipeline, incorporating the Welding, Bolting, Torquing, Tie-in Inspections, and NDT Inspection certifications, ensuring alignment with project scope and client requirements.• Utilized MS Excel to determine the project’s critical dependencies and perform critical path analysis to identify potential delays and determine changes to enhance project schedule performance to meet the required deliverables.• Optimized MS Excel to perform schedule quality checks to monitor project budgets and review project expenses against the budgets to identify inefficiencies in the project operations and remedy any non-approved charges. • Participated in Safety Assessment duties by performing various EHS audits, including reviewing Environmental Site Assessments, Process Hazard Analysis, and Upstream Waste Auditing reports. Show less

    • Michelin

      Sept 2022 - Dec 2022
      System Integrity and Reliability Engineer Co-op

      • Sophisticated MS Office to develop reports, illustrate presentations and highlight progress-related impacts.• Utilized MS Project to align capital expenditure proposals with strategic objectives of the organization, integrating sustainability principles, life-cycle costing, and risk assessment methodologies to ensure optimized resource allocation and efficient project execution.• Assisted Engineers in performing Vibration Analysis, Infrared Thermography and Ultrasound Leak inspections to evaluate motors, shafts, and bearings' operational lifespan and performance capability.• Implemented Root Cause Analysis, DFMEA and mitigation plans to address design issues in blueprints, update O&M manuals and troubleshoot malfunctions associated with the factory’s Blending Drums, Extruders and Chippers. • Participated in a Process Improvement Project integrating the Lean Six Sigma technique to reduce material waste by 15%. Applied process optimization methods and conducted variation analysis to analyze curing cycles, which decreased defects by 12%, ensuring consistent rubber quality.• Used SolidWorks to design calendar rolls and gauge control systems to ensure precise sheet thickness and uniform rubber processing. Applied FEA to evaluate stress distribution, structural integrity and overall calendar performance.• Applied Producibility Analysis techniques to optimize rubber compound extrusion and blending drum procedures to enhance production efficiency, reduce production cycle time and maintain consistent rubber quality.• Collaborated with multiple stakeholders in reviewing OHSA certifications and HAZOP documentation associated with leakage preventions, spilling controls and chemical discharge treatments. Show less

    • Pennecon

      Nov 2023 - Aug 2024
      Project Controls
  • Licenses & Certifications

    • Driver License

      Government of Newfoundland and Labrador
    • Level A/AED First Aid

      St. John Ambulance Canada | Ambulance Saint-Jean
      Oct 2020
    • WHIMS 2015

      The Cahill Group.
      Jan 2020
  • Honors & Awards

    • Awarded to Ishrak Zaman
      Academic Excellence Dean's Award Memorial University of Newfoundland Sep 2020 Top 10% of the class
  • Volunteer Experience

    • Executive at Large

      Issued by Bangladesh Student Association (MUN) on Sept 2017
      Bangladesh Student Association (MUN)Associated with Ishrak Zaman
    • Club Activist

      Issued by Interschool Robofest Foundation on Apr 2016
      Interschool Robofest FoundationAssociated with Ishrak Zaman