Daniel Mihaila

Daniel Mihaila

Deputy Section Manager

Followers of Daniel Mihaila268 followers
location of Daniel MihailaMangalia, Constanţa, Romania

Connect with Daniel Mihaila to Send Message

Connect

Connect with Daniel Mihaila to Send Message

Connect
  • Timeline

  • About me

    Project Manager at Alstom Transport S.A. Romania

  • Education

    • University ''Dunarea de Jos'' Galati,Romania

      2000 - 2003
      Engineer's degree Shipbuilding
    • University Dunarea de Jos - Romania

      2000 - 2003
      Engineer's degree Shipbuilding
  • Experience

    • Daewoo Mangalia Heavy Industries

      Aug 2004 - May 2008
      Deputy Section Manager

      1.Elaborate the three months schedule for preoutfitting and outfitting jobs(piping, steel outfitting,electrical hot work,pre-erection, erection, dock and quay;2.Weekly meetings with quality management team, owner and class to clarify the quality problems;3.Establish the production needed date (PND) for bulk materials;4.Issued and input the work packages for production in to an internal program(Magic);5.Extract the work volume & man-hour from one internal program(Magic);6.Clarify all problems regarding work package system.7.Weekly reports regarding the work volume, man hour and productivity for preoutfitting stage;8.Check the subcontractor request sheet and result of final performance;9.Coordinate and tranning the members from my team regarding their daily activities. Show less

    • Balfour Beatty Rail S.R.L.

      May 2008 - Sept 2012

      A. Tender Management Team - International Operation1.Planning and Logistic for International Railway Projects:Prepare the necessary time schedules for the tender submission(e.g.:supply,design,installation,testing and commissioning) - overhead catenary system & powersupply.Resource calculation,histogramms,method statements,cash flow,etc...Relevant Projects:Hong Kong Express Rail Link - China;Hong Kong South Island Line - China;Hong Kong Kwun Tong Line Extension;Goldcoast Light Rail Transit - Australia;Tuas West Extension - Singapore;Frontiera-Curtici-Arad-KM614 - Romania;Zurich Durchmesserlinie - Switzerland;B. Electrification Projects Team - Warsaw Metro Line II Project - Poland:1.Planning and Logistic for Tender Management TeamC. Electrification Projects - Maramaray Crossing Project - Turkey Republic:1.Planning and Programming2.Project Management Support Show less Electrification Projects Department - Fetesti-Constanta Railway Rehabilitation Project - Romania:1.Elaborate the Master Schedule in MS Project programe for the Railway Rehabilitation including all activities that must be perform from dismantling work to installation of new catenary(railway poles,anchor, cantilevers, wiring,finial adjusment,commissioning and hand over);2.Weekly status report & summary report regarding the progress from the site contact line & powersupply activities;3.Weekly meting with site engineers to discuss the progress from site;4.Prepare the status of necessary materials for the project and provide support to purchasingdepartment for ordering the materials;5.Cost estimation for the project;6.Other internal reports & review of the project requested by the project manager. Show less

      • Project Planner

        Jun 2012 - Sept 2012
      • Tender Management International Projects - Senior Planner

        Nov 2009 - Jul 2012
      • Project Planner

        May 2008 - Nov 2009
    • Alstom

      Sept 2012 - now

      Planning Manager For Railway Rehabilitation Corridor IV Romania for Contact Line & Power Supply:1. Project Simeria -Sighisoara - Lot 2 Micasasa-Coslariu - Time Schedule for Electrification Scope of Work - Contact Line & Power Supply; - Monthly Application of Payments &Interim Payment Certificates; - Project Management Support.2. Project Border-Curtici-Arad-KM 614 - Time Schedule for Electrification Scope of Work - Contact Line & Power Supply Works - Weekly/Monthly reports related to the Progress of Works - Cash Flow Curves3. Project 12 Traction Substations Rehabilitation4.Project Simeria -Sighisoara - Lot 1 Simeria - Vintu de Jos - Cost controlling/Cash Flow Curve/Time Schedule for Electrification Scope of Work - Overhead catenary system & Power Supply; - Quantity Surveyor for Electrification Scope of Work5.Cost Manager for Electrification Scope of Work - Corridor IV - KM 614 - Simeria ( 2A,2B,2C,3,Sighisoara-Brasov Lot 1&3 and Cata-Apata lot 2);6.Planning Manager for project 2C - Signaling and Electrification scope Show less

      • Project Manager

        Mar 2023 - now
      • Bid Manager

        Mar 2020 - Feb 2024
      • Planning Manager & Quantity Surveyor

        Sept 2012 - Mar 2023
  • Licenses & Certifications

    • Certificate of Completion in Advance Project Management

      Total Soft Romania
    • Resource Management In Primavera P6

      Smart Project Solution
      Sept 2019