Oxana Gamza

Oxana gamza

bookmark on deepenrich
Followers of Oxana Gamza41 followers
  • Timeline

  • About me

    Capex manager

  • Education

    • Ukhta state technical university

      2014 - 2014
      Teaching

      I red lectures on " Principles of estimated business", led practical training of the software "Bagheera», "Grand-Smeta". (Part-time, after the main work).

    • Institute for training and retraining of managers and specialists, st. petersburg

      2012 - 2012
      Advanced training of managers and professionals peculiarities of estimate documentation in construction.

      http://www.kccs.ru/

    • Ukhta training center employment services

      2008 - 2008
      Quantity surveyor (cost estimator) in industrial and civil construction quantity surveyor (cost estimator) 5
    • Central educational combine, ukhta

      2002 - 2002
      Oil and gas well servicing operator оператор по обслуживанию нефтяных и газовых скважин 5
    • Ukhta state technical university

      2000 - 2006
      Professional diploma development and operation of oil and gas fields 4,2
  • Experience

    • Severgaztorg ltd.

      May 2008 - Jun 2011
      Chief specialist of engineering department

      Client’s company, the subsidiary of JSC "Gazprom". Creation estimates for civil works (facing, electrical works, laying of pipelines, excavation, road maintenance). Preparations forms KS-2 (Act of works performed), KS-3 (Summary form). Monthly, quarterly, annual capital investment re-ports with justification it in "Gazprom" JSC (Moscow, Na-metkina street, 16). Cooperation with related departments.

    • Uralneftegazstroy ltd.

      Jun 2011 - Dec 2011
      Quantity surveyor, cost estimator

      Contractor's company. Construction on the project "Reno-vation of the Koshehablsky Complex Gas Gondensate Treatment Unit". Work place directly in Krasnodar region, together with "Yuzhgazenerdzhi" (a subsidiary of British company JKX Oil & Gas). Making estimates for installation of technical pipelines, equipments (cleaning equipments, reservoirs, heat exchangers, etc.), civil works, excavation. Preparation of financial forms KS-2 (Act of works performed), justification it before Client. Cooperation with related departments. Show less

    • Stroygazconsulting-specmontazh ltd.

      Dec 2011 - Mar 2013
      Quantity surveyor, cost estimator

      The contractor's company.Work on the construction "System of main gas pipelines Ukhta-Torzhok" and "System of main gas pipelines Bovanenkova - Ukhta." Checking the estimates of the design Institute "Giprospetsgaz", "VNIIGAZDOBYCHA" (Russia). Making estimates for additional works of cathodic protection of pipelines, including horizontal directional drilling, overheard power line, remote control systems, trunking VHF radio, fire alarm system, civil works, excavation. Strict adherence to the estimated standard MDS 81-35.2004. Preparation of financing forms KS-2 (Act of works performed), KS-3 (Summary form), KS-6 (Cumulative form), M-29 (write-off materials document). Creation of estimated prices and justification it before client, investor, design institute. Cooperation with related departments. Participation in meetings. Tight schedule. Show less

    • Stroygazproekt ltd

      Jun 2013 - Feb 2014
      Quantity surveyor, cost estimator

      The project company of Gazprom OAO. Making estimate documentations for the repairs of Gas distribution stations of JSC “Gazprom", such as the replacement of heating gas unit, fuel gas odorizing package and so on, including electric installation works, civil works, excavation, commissioning. Making Summary budget calculations. Calculation of transport relocation, workers transportation and other expenses. Strict adherence to MDS 81-35.2004 and others. Passing cost expertise. Cooperation with related departments. Show less

    • Audit office "​ nedra business consulting"​ ltd.

      Feb 2014 - Jan 2015
      Quantity surveyor, cost estimator

      Client’s company. Check financial costs of Contractor on oil wells construction, located in Orenburg, Khanty-Mansiysk, Republic of Komi, Irkutsk (Russia). Estimate analysis of Russian standards "Drilling wells №49" and ESN "Gazprom". Making estimates for installation of oil derricks, drilling, cementation, wells test. Work with software Bagheera. Cooperation with related departments.

    • South tambey lng

      Apr 2015 - Oct 2016
      Quantity surveyor. south tambey lng.

      Work on the construction of Liquefied Natural Gas Plant on the Yamal peninsula. Work in French-Japanese joint venture, general contractor. Check and justification KS-2 (Act of works performed), KS-3 (Summary act), KS-6 (Cumulative form), M-29 (write-off materials docu-ment). Work with price items and Lump Sum. Responsible for piping, concreting (including monolithic concreting), excavation, civil work. Making Bills of quantities for additional works not included in the design. Plan-Fact analysis. Cooperation with related departments. Corporate language - English. Show less

    • Qedi

      Jun 2017 - Jul 2018
      Senior quantity surveyor. qed internqtional. www.rhi-group.com.

      The structural unit of Rider Hunt International (contractor's company). Leading 6 contracts on the Con-struction of Cargo Transportation Route for Facili-ties in North-Eastern Part of the Caspian Sea, Ka-zakhstan. Verification of payment applications including timesheets, invoices, geodetic surveys, acts of work performed and other related documents. Complete and justify payment Certificates before Client (TengizChevroil). Work with price items and Lump Sum. Tight schedule. Self-leadership. Corporate language - English. Show less

    • Ooo “apis-plus”

      Mar 2020 - Jun 2021
      Quantity surveyor. cost estimator.

      Cost estimating, preparation KS-2, KS-3 forms for general construction works in FER, TEP, ENiR, in company price items. Development of the company's budget-normative base (with exit to the site, calcula-tion of resources). Bills of quantity preparation based on the design, with visit to a site. Calculation of the cost of machines operation. Calculation of aggregated estimate standards for road construction, gas pipeline, fiber-optic communication lines, drilling, piling works, metal structures, etc. Calculation of the Summary Cost Estimates (price limit) for the Lime plant construction (for all chapters of the SSR) using the using the aggregated prices (NCS-2020), as well as the prices self-developed on the FER basis. Work with estimating softwares Grand-smeta, Bagheera. Keeping of accounts. Show less

    • Ooo“rusfen” (www.tekfen.com.tr)

      Aug 2021 - Feb 2022
      Инженер-сметчик. ooo“rusfen” www.tekfen.com.tr

      Turkish company, general contractor. Project "Complex gas treatment unit with central booster pump station of Kharampur deposit – connection to the unified system of gas supply of OJSC Gazprom Section". Preparation of monthly funding Progress Payment (Interim Payment Certificate - forms KS-2, KS-3, M-29, etc.). Complying estimates according to drawings for additional work in the Grand-Smeta software. Making the Summary Construction costs for tender. Interaction with related departments, customer service. Corporate language - English.Left this company due to receiving more interesting offer. Show less

    • Ao “technip energies rus” (technipenergies.com)

      Feb 2022 - Apr 2022
      Senior quantity surveyor, cost estimator

      Analysis of Customer's and Contractor's estimating price item resources (about 4 thousand pieces) such as machine and labor hours, materials, scope of works and other for their compliance with entering the identified discrepancies in the tables. Participation in the creation of corporate price iterms in the part of labor and machine hours calculations. Participation in meetings. Interaction with related departments. Due to the political situation in Russia, I fell under redundancy. A letter of recommendation and a phone number of the recommender are available. Show less

    • Ооо "gazprom lng technologies"

      Sept 2022 - Apr 2023
      Senior quantity surveyor/ senior cost estimator

      Work on the EPC projects "Natural Gas Liquefaction Complex", "LNG Reception, Storage and Regasification System", General Contractor Company. 1. Checking KS-2, KS-3 (Interim Payment Certificates), and justification it before Client. 2. Making estimates for additional works, incl. calculation of costs for diesel power stations working, commissioning, snow control, etc. 3. Development of Company’s unit rates for civil and installation works and justified it before Client. 4. Work with the Grand-Smeta software. Strict adherence to order No. 421. Work in conditions of multitasking. Show less

    • Ursa community

      Apr 2023 - Oct 2024
      Cost estimation lead specialist

      Work on the Murmansk LNG Plant project. 1. Writing the "Capex Estimation" procedure for class 4-2 us-ing the AACE system. 2. Preparing the "Capex Estimation" presentation and justification it before the Client. 3. Capex estimation of project optimization (cost reduc-tion) for class 4 based on an analogous project. 4. Writing a Capex methodology. Estimation of design concepts (class 4, for getting cost on the investment stage). 5. Capex estimation class 1. 6. Participation in creation of design unit price data-base for the FEED stage. 7. Making estimates for design works, civil works using Russian databases and the Grand-smeta software. 8. Graduated from the course "Project Cost Estimation" according to the AACE system (certificate No. 2023-T-0019). 9. Making estimates for design works, civil works using Russian databases and the Grand-smeta software. Graduated from the course "Project Cost Estimation" according to the AACE system (certificate No. 2023-T-0019). Corporate language - English. Show less

    • Rti project

      Oct 2024 - now
      Capex manager

      Work on the project "Construction of theUdokan mining and smelting Plant, 2nd stage".Capex cost estimation using the AACE system.Calculation and checking Capex class 4 using a database of analogs, by bottom-up method.Creation of Estimation Plan (Capex Plan).WBS creation (work breakdown structure).Forming RACI matrix.Forming Contractual Responsibility Matrix.Writing a Capex estimation methodology.CBS creation (cost breakdown structure).Making Contractual Responsibility Matrix.Checking estimates of design works.Filling unit rate database with price items in software A0.Writing Contract in the part of cost estimation, coordination of department activities.Recruiting employees for estimation team. Interaction with related departments. Participation in meetings. Show less

  • Licenses & Certifications

    • Project cost control

      Aace international, moscow
      Aug 2025
    • Methodology for calculating the cost of design and survey works

      Software engineering institute
      Sept 2024
    • Project cost estimation

      Aace international, moscow
      Jul 2023
    • Certificate in pricing and estimating business

      Association of russian builders
      Sept 2012
      View certificate certificate
    • Certified cost professional

      Aace international, moscow
      Sept 2025
    • Membership in cost estimators union

      Cost estimators union
      Aug 2012
      View certificate certificate
    • Certified cost professional preparation cours

      Pm soft
      Sept 2025
  • Volunteer Experience

    • Builder

      Issued by Solidarites Jeunesses on Oct 2018
      Solidarites JeunessesAssociated with Oxana Gamza