Pedro Silva

Pedro Silva

Engineering Trainee

Followers of Pedro Silva1000 followers
location of Pedro SilvaPortugal

Connect with Pedro Silva to Send Message

Connect

Connect with Pedro Silva to Send Message

Connect
  • Timeline

  • About me

    Civil Engineer / Projet Manager

  • Education

    • Universidade do Minho

      1998 - 2005
      Engº Msc in Civil Engineering 13/20
    • Universidade do Minho

      2014 - 2016
      Pos Graduation in Project Management Project Management 16/20
  • Experience

    • Elísio Paulo & Azevedo

      Mar 2006 - Apr 2007
      Engineering Trainee

      Construcion of 20km of secondary natural gas networks in the city´s of Porto and Vila Nova de Gaia

    • Tabique Engenharia

      Aug 2008 - Apr 2009
      Health And Safety Site Coordinator

      Parque Escolar Modernization Programme :At the beginning of its activity in March 2007, Parque Escolar’s objectives included the intervention in 332 schools by 2015, and is one of the biggest construccion programs in Portugal in the last years

    • ULMA Construction

      Apr 2009 - May 2015

      As part of National Plan for High Potential Hydroelectric Dams ULMA performed approximately 209.500m2 of formwork and 860.300m3 of concrete on the construction of the Dam and all infrastructures.The 50 km long reservoir has two power stations located in the Sabor River. They are going to generate 170 MW of power and an annual electricity production of 444 GWh.The upstream dam has a double-curvature wall which will be around 123m high and 505m wide, anda the 2º tallest Dam in Portugal Show less

      • Site Manager ULMA at The Bay of Cadiz Bridge - Spain

        Jun 2014 - May 2015
      • Site Manager ULMA at Baixo Sabor Dam

        Mar 2011 - Jun 2014
      • Site Manager

        Apr 2009 - Mar 2011
    • BOSLAN INGENIERIA Y CONSULTORIA

      Sept 2016 - Nov 2019

      IBERDROLA - Alto Tâmega Hydroelectric Complex The Alto Tamega hydroelectric complex in Portugal, one of the largest projects of its kind in Europe, envisages the exploitation of hydroelectricity infrastructure at 3 locations (Gouvaes, Alto Tamega and Daivoes) with a capacity of 1100 MW and an annual production of 2.000 GWh. IBERDROLA - Alto Tâmega Hydroelectric Complex The Alto Tamega hydroelectric complex in Portugal, one of the largest projects of its kind in Europe, envisages the exploitation of hydroelectricity infrastructure at 3 locations (Gouvaes, Alto Tamega and Daivoes) with a capacity of 1100 MW and an annual production of 2.000 GWh

      • Construcion Supervisor Engineer at Gouvães Hydroelectric Complex in IBERDROLA

        Jul 2015 - Nov 2019
      • Construction Supervisor Engineer at Daivões Dam in IBERDROLA

        Sept 2016 - Jan 2018
    • Alfadvice-Serviços de Engenharia

      Feb 2020 - Jun 2021
      Diretor Técnico
    • TUU

      Jul 2021 - now
      Engenheiro civil
  • Licenses & Certifications

    • Project Management Professional

      2159317
      Mar 2018
    • Técnico Superior de Higiene de Segurança no Trabalho - Cap VI

      ACT - Autoridade para as Condições do Trabalho
      Jun 2005
    • Engenheiro Civil : Membro Efetivo Senior

      Ordem dos Engenheiros
      Jun 2019
    • Curso de Exploração e Segurança em Barragens

      LNEC
      Jul 2016