Basharat Paracha

Basharat Paracha

Trainee Engineer

Followers of Basharat Paracha321 followers
location of Basharat ParachaPakistan

Connect with Basharat Paracha to Send Message

Connect

Connect with Basharat Paracha to Send Message

Connect
  • Timeline

  • About me

    Manager RAN Planning & Optimization at JAZZ

  • Education

    • Comsats Institue of information technology

      2007 - 2011
      BS(TE) Telecom
    • F.G sir syed

      2002 - 2003
      Matric Science
    • International Islamic University

      2003 - 2006
      DAE Electronics
  • Experience

    • National Telecommunication Corporation

      Jan 2010 - Mar 2010
      Trainee Engineer

      Trainee Engineer

    • LCC

      Dec 2010 - Jan 2015

      • Prepared work flow and assigned responsibilities in an effective way to get best performance from every individual.• Analyzed and created alarms monitoring filter by considering alarm severity in iManager M2000 to minimize outage occurrence chances.• Prepared a duty roster to obtain effective performance of each staff according to their abilities and skills.• Created escalation process tree to avoid and control network outages.• Arranged and delivered Trainings to NOC team regarding BSC6900 configuration methods.• Scripts development and implementation for any type of parameter modification using CM Express.• Network Parameter Modification using MML command system also responsible to deliver training regarding MML Command system to NOC Team.• Providing technical support to field team during Ericsson-Huawei Swap.• Installation of iManager PRS, iManager M2000 and Local Maintenance Terminal (LMT).• Entertainment of Customer queries through emails.• Cell/BSC level monitoring of KPIs using I Manager/PRS; identification and troubleshooting of the worst performing cells. • Initial tuning of the newly on aired sites, basic parameter tweaking involved PBGT handover threshold, BQ HO margin etc.• Resolution of SDCCH/TCH blocking issues by tweaking of relevant parameters, activation of congestion relief features. Show less • Initial all major KPIs analysis.• Resolve Handover issues.• Parametric fine tuning i.e. PBGT HO Th. BQ HO Margin, intercell HO Hysteresis in order to improve Handover success Rate.• Modify the Half Rate Settings to cater high TCH blocking on worst cells which ultimately improve CSSR.• Monitoring Major KPIs and highlight the issues.• KPI analysis and recommendations.• CGI Definition.• External Neighbor Definition.• Troubleshooting.• Cell definition verification before swap activity and remove discrepancies.• Making scripts for LAC change, NBR deletion/addition, Power control enable/disable and execute during swap activity.• OMCR support for Drive Test engineers during swap activity.• TRX Locking and unlocking.• Network level, BSC level, cell level and TRX level exports.• Implementation of work orders through CME and LMT.• Configure cell hoping. Show less • Involved in Cluster level drives for major cities of Pakistan in centre region.• Performing Drive Tests using TEMS Investigation 8.x.x for SWAP sites in night activities.• Responsible of monitoring Stats like Call drops, Handover problems, Rx level and Quality issues etc and informed these issues to management to solve them, also coordinates with OMC-R in order to get rid of these problems.• Involved in activities of reducing Network Interference (Co/Adjacent Channel) through cluster drives.• GPRS/EDGE Testing using FTP Downloading on TEMS Investigation and resolve issues like low RLC throughputs, PDP context activation failure.• Site Verification by TRXs Testing, Inter and Intra-Site Handovers tests, Coverage tests and GPRS testing.• Troubleshoot problems faced during D.T e.g. Neighbors definition, Interference, Hardware faults.• Responsible for confirmation of Physical RF Design like Antenna Height, Tilting, Azimuths etc and propose the changes if necessary. • Analyzing log files after Drive Tests and writing Optimization Reports using MapInfo professional, TEMS Route Analysis.• Drive test of Pre SWAP and Post SWAP Sites.• Involved in MOS testing of all major seven cities of Mobilink SWAP Project (phase IV) using Genex Probe and also made reports of the MOS tests using Genex Assistant. Show less

      • OMCR/NPO Engineer-Mobilink Mega Swap Project

        May 2013 - Jan 2015
      • OMCR/NPO Engineer-CMPAK Swap project

        May 2012 - May 2013
      • NPO / OMCR Engineer Mobilink Swap Phase III,IV,V

        Mar 2011 - May 2012
      • RF Engineer (Drive Test)

        Dec 2010 - Mar 2011
    • Turnotech Inc.

      Apr 2015 - Dec 2015
      2G/3G RF Optimizer

      Monitoring and Analyzing parameters and cluster level KPIs (CSSR, CDR, HSR, IHSR Traffic distribution and TCH/SDCCH Blocking) for smooth cluster acceptance process. Project involving Cluster Optimization IAR & FAC Report which includes hard/soft parametric optimization, improvement of major CS & PS KPIs,.I.e. DCR, HSR, Data Volume, throughput & TBF Establishment success rate, coverage, quality, proper serving & pre/post drive tests log files analysis & suggestions. Cluster optimization involving soft/hard parametric optimization for different major KPIs of CS & PS Services & Drive Test statistics (Poor/Cross Coverage/Quality/C/I/Interference). Providing daily/weekly degradation comments for the BSC`s, escalating to MS for urgent resolution. Network/BSC/Cell Level KPIs monitoring /optimization through soft parameters for improving major KPIs .i.e. CSSR, DCR, HSR (Incoming/Outgoing). Traffic Shifting from HR to FR for ensuring Quality/MOS improvement. Handover Distributions optimization to ensure that maximum HOs Distributions should be due to PBGT. Optimization of Major roads/Highways/Coverage holes/capacity issues by making proper/dominant servers both by soft and hard parameters .i.e. suggesting any change in antennas (Azimuth or tilt). Resolving Customer Issues through deep analysis of KPI stats & conducting/analyzing drive tests. Involved in different project of CMPAK/Mobilink Operator in which customer issues relating to radio environment were resolved on priority/daily basis with dedicated RF resources. GPRS/EDGE Statistics analysis & Optimization involving Uplink/Downlink TBF establishment rate, TBF drops rate, TBF Congestion, Data Volume & Throughput issues. BSC Up gradation/Cutovers involving mapping/Audit of parameters before/after activity and maintaining targets for all major KPIs. Expansion recommendation for the existing sites and recommendations for New Sites Show less

    • Jazz

      Dec 2015 - now
      • Manager RAN Planning & Optimization

        Jan 2023 - now
      • Senior Engineer RAN Planning\Optimization

        Dec 2015 - Sept 2023
  • Licenses & Certifications