Mahmoud Abdelaziz. , PMP, RMP, PMO-CP

Mahmoud abdelaziz. , pmp, rmp, pmo-cp

bookmark on deepenrich
Followers of Mahmoud Abdelaziz. , PMP, RMP, PMO-CP1000 followers
  • Timeline

  • About me

    Senior Project Engineer, Giza Arabia

  • Education

    • Faculty of engineering

      2004 - 2009
      Good electrical, electronics and communications engineering goode
    • Benha university

      2004 - 2009
      Bachelor of engineering - be electrical and electronics engineering
  • Experience

    • Consolidated contractors international company

      Feb 2011 - Aug 2014

      A) Cables works for medium and low voltage cables (Installation supports, cable trays, pulling cables, termination, and splices and testing). B) Installation, testing and handing over for main and sub main panels (medium and low voltage panels). C) Transformers :( Installation, testing and connections).D) Installation Electric works for residential buildings including (high class) 1- Installation lighting, small power panel, power socket. 2- Light current system (Data, Tel and Fire alarm, …..). 3- Earthing system. Show less

      • construction and qc engineer

        Feb 2011 - Aug 2014
      • Qc engineer

        Feb 2011 - Aug 2013
    • Hassan allam holding

      Oct 2013 - Oct 2018
      Electrical engineer

      a) Estimation of raw materialsb) Purchase materialsc) Quality control on materials d) Prepare the project time plane and coordinate with civil & steel structure work plane.e) Follow up the drawing with site and the work in new area which requiredf) Preparing the R.F.I. if any equipment needs clarification.g) Check the problem in the site and send R.F.I for consultant with the clarification or solution as per site condition.h) Make evaluation for extra work or modification happen in the site and send variation sheet for employer.i) Prepare monthly invoice of work done.j) Coordinate between project budget and actual monthly manpower cost by prepare the work have to done for covering the project budget cost in present months.k) Preparing monthly report included the work progress and cost control report.l) Quality control for control HVAC systems Show less

    • Tecnicas reunidas

      Dec 2018 - Sept 2024
      Electrical engineer

      E&I supervisor • Studying Project’s specification and have good knowledge in international standard and all document of the project• Determined the project schedule, which included the sequence of all construction activities. • Supervise all plant electrical construction activities erection and internal finishing (cable tray installation, cable pulling ,GIS installation ,switch gears installation ,MCC ,LV panels ,lighting post (conventional and solar system ) ,transformers (HV/MV & MV /LV) , cathodic protection installation, cable glanding ,cable termination ,preparing for all tests required …….)• Instrument pre-calibration, instrument installation, Hook up installation, Marshaling , workstation , fire and gas system installation • Managing all excavation methodologies, procedures and equipment • Capability to ensure adherence to the planned time frame and to the quality control plan• Organize and manage the assigned teams.• Avoided construction delays by efficiently following through with all site inspections in a timely manner. • Guided and directed third-party inspectors through project construction, commissioning and closeout. • Scheduled all contractors and materials deliveries. • Prepared regular interval progress reports. • Implemented systems to improve process efficiency and reduce the project duration. • Conducted routine quality audits to ensure that work was progressing per the specifications and initiated corrective actions. • Conducted all critical pre-installation conferences with general contractors, subcontractors, consultants and manufacturer's representatives. • Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues. • Digitally archived weekly progress and technical “Knowledge Base” photographs of all assigned projects. Show less

    • Giza arabia

      Nov 2023 - now
      Senior project engineer
  • Licenses & Certifications