Zohaib Sajid

Zohaib Sajid

Electrical Engineer

Followers of Zohaib Sajid857 followers
location of Zohaib SajidPakistan

Connect with Zohaib Sajid to Send Message

Connect

Connect with Zohaib Sajid to Send Message

Connect
  • Timeline

  • About me

    Maintenance Manager at GE Power

  • Education

    • Institute of Management Science (IMS Department) BZU Multan

      2011 - 2014
      Master in Business Administration (MBA-Executive in Project Management) 2011 - 2014 Project Management A+

      EntrepreneurshipBrand ManagementProject ManagementInventory ManagementInternational FinanceOrganizational BehaviourAccounting and FinanceManagerial Finance

    • UET Lahore

      2005 - 2009
      BSC Electrical Engineering Electrical and Electronics Engineering A

      Activities and Societies: IEEE Power Engineering Power System ProtectionElectric Machine DesignsPower GenerationPower System Transmission and DistributionsControl Systems

    • Govt College Gujranwala

      2003 - 2005
      FSC Pre-Engineering A

      Activities and Societies: Swimming, Tennis, Cricket.

    • BISE Gujranwala

      2002 - 2004
      Metric Science A+

      Activities and Societies: Debating Society Member.

  • Experience

    • GEPCO

      May 2008 - Jun 2008
      Electrical Engineer

      1. Develope Report on Distribution Network.2. Improvement of Transformer Reclamation Workshop.

    • Fatima Group

      Oct 2009 - Nov 2013
      Electrical Engineer

      Responsibilities:1. Electrical maintenance of Cogeneration Power Plant 33 MW(3 GTGs), 3 x 11.33MW G10-1, GE make gas turbines installed with Ansaldo alternator & soft staring system, GE Fanuc control system and Woodward governor and synchronizer. Each turbine has heat recovery boiler of UMAG make. All the 6kV & 415V distribution system is SIEMENS Pakistan. 2. Operation and maintenance of Steam power plant 27 MW, 3 X 9MW 850 / C, BBC make gas turbine installed with CEM alternator, with three BORSIG boilers each having capacity 85 t/hr. All the 6kV & 415V distribution system is BBC make.3. To ensure the reliable operation and maintenance of ELMS (Electrical Load Management System), Priority based Plant electric load shedding system and its signal exchange algorithm with steam turbine and gas turbine switchgear. 4. Operation and maintenance of 2MW Black Start Emergency Diesel Generator and its signal exchange algorithm with ELMS (Electrical Load Management System) and MV Switchgear.5. Develop and implement annual plan for inspection and PM of MV and LV Substations/MCCs.6. Preparation of annual lists of spare parts, consumable materials and special tools or test equipment.7. Preparation of Technical specification and Supervise/Provide Technical Support/Instructions for Maintenance and troubleshooting of MV and LV Switch gear installed at Power house , Sub-Stations, MV and LV Motors, Transformer, Fire Alarm System, Energy Analyzers, VFD, Soft Starters, Control Circuit of Hoist Crane and other Electrical equipments.8.Reviews design options and recommend best solution based on cost, engineering quality, or availability of materials.9. Prepare equipment cost benefit analysis reports, Payback period reports, staff/contractor appraisal reports, indicating activities carried out, problems encountered and produce analysis reports of a technical nature indicating different comparison analysis and recommendations to alleviate recurring problems. Show less

    • K-Electric

      Nov 2013 - Jun 2014
      Deputy Manager

      1. Maintenance of 3 x 120 MW GE Gas turbine having frame size G9-E, EX-2100 Excitation System, Mark-VI control system, G-60 Generator Protection System. Each turbine has heat recovery steam generator. 2. Operation and maintenance of 1 x 200 MW Steam Turbine Generator with Unitroll ABB excitation System make: Herbain Electric Company.3. Operation and maintenance of 220 KV Gas Insulated switchgear (GIS) equipped with ABB Protections. 4. Operation and maintenance of 170 MVA, 15 KV/220 KV Power Transformers with On-load Tap changer, ODAF Cooling system make: Hengyang T/F Co. 5. Operation and maintenance of 3 x 2000 KW BSDG and 1 x 1800 KW EDG make: SWT Super Watt Power Group.6. To ensure reliable operation of 220 KV Protection relays RED 670, REC 670 and other micro processor based relays and protection scheme make: ABB.7. Reliable operation of electrical equipments through different performance and predictive tests i.e. MAGIC Test for GTG, Hydrogen leakage test of STG, LIRA , Online PD testing of 1C X 625 mm2 220 KV XLPE Cables and DGA, Tan Delta etc for transformers and MV motors. Show less

    • GE Power

      Jul 2014 - now

      Muridke Power Plant is 234 MW Combined Cycle Power Generation facility located in Sheikhupura Pakistan near Lahore, owned by Sapphire Electric Company and its O&M and CSA contracts are with General Electric (GE). My responsibilities are followings:1. Managing Day to Day activities of Electrical Maintenance Department including PM/CM/PDMs.2. Coordinate with Engineering through PAC cases, M&D cases, support central to resolve plant critical issues to ensure Plant Reliability, Availability, Start up reliability and to reduce number of trips.3. Coordinate I&FS team for planning and successful execution of plant outages.4. Propose, maintain and track KPIs of Maintenance Department.5. Ensure asset integrity and reliability through FMEA, Single point failure Assets, RAM+ actions.6. Suggest, implement and execute facility improvement plans (FIP).76. Prepare and submit detailed technical reports on all maintenance related works / projects as per customer and management requirements.7. Drive optimization of plant maintenance strategies with the aim of achieving lower cost operation and/or increased efficiency.8. Maintenance of 1x 85 MW Steam Turbine Generator (Make: SKODA) with Brushless excitation System and Siemens Generator Protection.9. Maintenance of 132KV Grid Station having double bus single breaker scheme (Make: Siemens).10.Maintenance of 95 MVA, 11.5 KV/132 KV Power Transformers with On-load Tap changer, ONAF Cooling system make: LEEEC.11. Develop/Review and implementation of SOPs, maintenance manuals, training plans, PM/PDM Plan & reliability program for electrical systems.12. Preparation of annual Revenue & Capital budget.13. Conduct analysis of maintenance histories/downtime problems and investigate to determine the manpower/equipment required. Show less

      • Maintenance Manager

        Mar 2020 - now
      • Team Lead Electrical Maintenance

        Jul 2014 - now