Azad CAVDAR

Azad CAVDAR

Internship Of Electrical Technician

Followers of Azad CAVDAR2000 followers
location of Azad CAVDARMersin, İçel, Türkiye

Connect with Azad CAVDAR to Send Message

Connect

Connect with Azad CAVDAR to Send Message

Connect
  • Timeline

  • About me

    Electrical Engineer & Data Analyst

  • Education

    • University of Technologies (UHT Plovdiv)

      2010 - 2011
      English and Bulgarian Languages
    • Kurtalan CPL High School

      2003 - 2008
      Electrical/Electronics Maintenance and Repair Technology
    • Technical University Sofia

      2011 - 2014
      Bachelor’s Degree Electric Electronic Engineering

      Individual Program

    • Technical University of Sofia

      2017 - 2019
      Master's degree Electrical and Electronics Engineering 1
    • Harran University

      2008 - 2010
      Associate's degree Electrical Engineering Technologies/Technicians 2
  • Experience

    • Limak Holding

      Jul 2004 - Jun 2005
      Internship Of Electrical Technician

      Commencing July 2004 through to June 2005 as an Intern of Technical Expert for the biggest cement factroy in Turkey, with an output of approximately 800.000m2. The factory is owned by Limak Holdings and Goverment. Each year selling over one (1) million tonnes of cement for export and import. The factory produces cement but also produces clinker and plaster. The factory is a 24 hour operation, the electrical system of the factory consists of 540000Kw power demand, 175Kv ring connection voltage, synchronous motors 22nos, asynchronous motors 4 specially designed MCC room, 2 nos 400MVA power transformers.My scope was as a intern checking power meters and signal genetator daily, record all out going ampere and power daily, installing switch-socket outlet based on departmental requirements, measure motors vibration daily, maintanence of motor bearing, daily maintanence of MCC panels, rewinding broken asynchronous motors, creating distribution panels, maintanence of distribution panels. Show less

    • LIMAK CEMENT GROUP

      Jun 2009 - Sept 2009
      Internship of Electrical Technician

      My scope was checking power meters and signal generator daily, record all out going ampere and daily power, installing switch-socket outlets base on department requirements, measure motors vibration daily, maintanence of motor bearing, daily maintanence of MCC panels, rewinding broken asynchronous motors, creating distribution panels and maintanence of distribution panels.

    • VYM ENGINEERING ( SOYAK HOLDING)

      May 2013 - Dec 2013
      Electrical Engineering Technician

      Project: Soyak Park Apart Housing Project, the largest housing project in the region, an area of 123,142.00m2 and total 1121 apartments. The maximum power demand for the project was 41200kW. The essential supply consisted of (6) 1250kVA gensets. The project joint ventured Turkish and Japanese investor and designed by Japanese and constructed by a Turkish company.Duties: Signed with fixed term contract. Preparing shop drawings for site supervisors and technicians, coordination MEP drawings and dimensions, tracking material purchasing and delivering status, cost control, work inspection, marking up all electrical changes in shop drawings, preparing single line diagrams, coordination between electrical installation and BMS installation. Show less

    • ASYA ELECTRIC (ICON HOTEL CONSTRUCTION)

      Jan 2014 - Jul 2014
      Electrical Engineering Technician

      Project: ICON Tourism Hotel Project, the hotel consisted of 65 Guest Rooms, smart room, intelligence door system. The project cost was 14,000.000 USD. The estimated workforce of 120 employed to construct and commission. Duties: Signed with fixed term contract. Preparing shop drawings for site supervisors and technicians, coordination MEP drawings and dimensions, tracking material purchasing and delivering status, cost control, work inspection, marking up all electrical changes in shop drawings, measuring indoor and outdoor lux values, coordination between electrical installation and BMS installation. Show less

    • Elzer Automation MFM Engineering

      Aug 2014 - Feb 2015
      Automation Engineer

      Project: LMA Core Sand Preparation System Project, A mechanical and automated system in term of sand storage, heating, cooling, dosing, and mixing. The project has been joint ventured by Turkish and German investors. The project cost is 6,000.000 USD and an estimated workforce of 450 employed to construct and commission. The project has been sponsored by SIEMENS. Duties: Singed with fixed term contract, preparing I/O, Input and Output lists, creating wiring diagram via EPLAN and COFASO, purchasing component of automation panel, the configuration of PLC and HMI settings, Calibration and setting parameter of Servo Motors. Supervising of wire tagging and wiring of small power of automation panels, producing communication cables via soldering jacks, developing System User Operation Manuals. Show less

    • Dorce Prefabricated Building and Construction Industry Trade Inc.

      Jul 2015 - Jun 2019

      Project: 4000 Man Integrated Worker Accommodation Camp construction for World Cup 2022 Stadiums. The total area of buildings 63,400m2 and constructing prefabricated 32 Nos Worker Accommodation, Supervisor, Laundry, Kitchen, Mosque and Health Clinic, 4 Nos 11kV 800A Substation will feed overall facilities. Duties: Managing and planning all electrical works for 4000 Man camp construction, preparing BOQ, BOM, Tender Drawings for subcontractor bidding, preparing shop drawings, plan drawings for site supervisors, generating Mark-up drawing and As-built drawing for the client. Preparing Purchase Order and Post Order for subcontractor scope. Preparing dimension drawings, superimposing electrical and mechanical drawings, preparing and revising plot, master plan, submitting and revising shop and plan drawings and the electrical team consisted of 150 direct and 130 indirect people. Show less Project: Future Growth Project TCO, Chevron, Construction of PMT, Training Center and Main Canteen Buildings. The total area of buildings is 10,381m2 Total capacity of the facility is 5000kVA and system have been designed with %100 redundancy and fully automated with smart MDB Room and Substations. The project includes a great foundation for HVAC Heating and Cooling pipes and power cables. Electrical design and installation were conducted in compliance with RoK and TCO operation and specifications.Duties: Designing all electrical system and planning for construction. Preparing documentation for engineering, calculation of cable, MCB, MCCB, ACB, and Busbars. Managing all electrical installation, preparing an exhaustive progress report for daily and weekly meetings. Preparing IFC, IFR, Mark-Up and As-Built drawings. Generation Cable Schedules according to changes at the site. Preparing breaker trip setting via simulation ETAP and supervising at the site. Approving and controlling electrical work permit as PIC. Preparation of electrical design for Heat Trace, preparation electrical specification for electrical equipment’s. Sizing and designing UPS Essential supply and isolation transformer, Calculation and sizing generators, and preparing a scenario of the substation and generator synchronization. Show less Project: RAPID, Refinery and Petrochemical Integrated Development Project. Construction of 2400 People 50 Nos prefabricated buildings. The total area of buildings is 52,520m2 Construction of Camp Accommodation and Common Facilities situated on a 600-acre Site and is utilized to accommodate and estimated workforce of 53’000 employed to construct and commission the Mega Scale Petronas Rapid Project with an estimated value of US$24 billion. Facility Feeder Substations 33kV and 11kV.Duties: Managing and planning all electrical works, preparing BOQ and Tender drawings for Subcontractors, Inspect and commission Subcontractor’s works. Preparing SLD and Datasheet for Sub-distribution Boards, preparing work permit, progress report for daily and weekly meetings, preparing job pack, issuing material approval documentation. Generating Cad drawings for the consultant. Revise and Submit all engineering documents, IFR, IFC, IFI, IFA, AFD, AFC, IFD, FCA, and FCR, getting proper engineering code for all documentation. Preparing master and plot plan, superimposing electrical, mechanical and architectural drawings. Effect analysis and identify to project risks and develop a response plan. Sizing generator for the site and office mobilization areas. Calculation diversity factor and demand factor for the substation. Preparation electrical audit. Preparation electrical specifications for electrical equipment; Substations, Switchgear, Motor Control Center, MCC, UPS, Transformers. Show less

      • Senior Electrical Engineer

        Jul 2018 - Jun 2019
      • Senior Electrical Engineer

        Jan 2017 - Jun 2018
      • Senior Electrical Engineer

        Jul 2015 - Jul 2017
    • ISKER Group

      Jun 2019 - Sept 2021
      • Database Coordinator

        Apr 2020 - Sept 2021
      • Senior Electrical Engineer

        Jun 2019 - Apr 2020
    • Tengizchevroil

      Sept 2021 - Jan 2023
      Information Coordinator / Project Engineer
    • Crescent Petroleum

      Jan 2023 - now
      Electrical and Instrumentation Engineer
  • Licenses & Certifications

    • Electrical Engineering Simulation With ETAP

      Udemy
      Apr 2019
    • Allen-Bradley PLC Programming

      Rockwell Automation
      Jun 2015
    • Certificate Of Appreciation

      Dorce Prefabricated Building and Construction Industry Trade Inc.
      Mar 2016
    • Bulgarian Language Certificate

      Plovdiv University
      Aug 2012
      View certificate certificate
    • Professional Electrical Engineer

      Engineers Australia
      Apr 2024
    • Certificate Of Recognition

      Tengizchevroil
      Feb 2018
    • Beijer HMI Programing And Design

      Beijer Electronics
      Nov 2014
      View certificate certificate
    • English Language Certificate

      Plovdiv University
      Aug 2012
      View certificate certificate
    • Fatek Plc Programming

      Beijer Electronics
      Nov 2014
      View certificate certificate
  • Honors & Awards

    • Awarded to Azad CAVDAR
      Appreciation Certificate Coollins KEJANG Mar 2016 The certificate scanned and added on below link.https://drive.google.com/file/d/0BxRPBKCiz7oIVkVial9QeGJFaHc/view
  • Volunteer Experience

    • Photographer

      Issued by Photography Freelance
      Photography FreelanceAssociated with Azad CAVDAR