Mahmoud Atef

Mahmoud atef

bookmark on deepenrich
location of Mahmoud AtefCairo, Egypt
Phone number of Mahmoud Atef+91 xxxx xxxxx
Followers of Mahmoud Atef13000 followers
  • Timeline

    Jul 2015 - Jan 2016

    Site Civil Engineer

    Hassan Allam Holding
    Mar 2016 - Sept 2016

    Site Civil Engineer

    Egyptian Armed Forces
    Oct 2016 - Jun 2017

    Site Civil Engineer

    SINAI EGYPT company
    Current Company
    Jul 2017 - now

    Site Engineer Section Head

    Hassan Allam Holding
    New Administrative Capital
  • About me

    Site Engineer Section Head (Civil)

  • Education

    • Faculty of engineering, menoufia university

      -
      Bachelor's degree civil engineering very good with percentage 76.4 %
  • Experience

    • Hassan allam holding

      Jul 2015 - Jan 2016
      Site civil engineer

      • Project: Egyptian refinery company (ERC) at Main Control Buildings and Substation Unites.• Location: Mostorod, Cairo Governorate, Egypt.• Owner: ERC Company.• Main contractor: GS E&C Korean Company.• Consultant: Worley parsons consulting.• Budget: Around 4 billion US dollars.• Project brief: Consists of Diesel purification system cycle which includes main control buildings, substation unites, steel structures and infra-structure works for all of project, I was responsible of the process on constructing 2 substation buildings from A to Z including all pre-stressed works on site. Show less

    • Egyptian armed forces

      Mar 2016 - Sept 2016
      Site civil engineer

      • Project: Military Administrative buildings of military air defense Forces.• Location: North Coast, Salloum, Egypt.• Owner: The Egyptian Armed Forces.• Consultant: Military Corps of Engineers at Air Defense Forces.• Project brief: Consists of 5 main administrative buildings, I was responsible of all process of construction of those buildings and all finishing works or them.

    • Sinai egypt company

      Oct 2016 - Jun 2017
      Site civil engineer

      • Project: Commanders Villas at Egyptian Army Military Entity.• Location: The New Administrative Capital.• Owner: The Egyptian Armed Forces.• Consultant: Sabbour consulting.• Budget: Around 4 billions L.E.• Project brief: Consists of 1000 villas with 800m2 for each one and utilities buildings, including infra-structure works, I have worked on executing process of constructing 100 villas, I have also executed the infra- structure of those villas.

    • Hassan allam holding

      Jul 2017 - now

      • Project: National Energy Control Centre (NECC). • Location: The New Administrative Capital (Military Entity).• Owner: The Egyptian Ministry of Electricity.• Consultant: EDF (Electric De France) consultants.• Budget: Around 8 billion L.E.• Project brief: Consists of a huge building with 16000 m2 of area used in controlling and supervision of all electric consumption in whole of Arab Republic of Egypt, I am responsible of managing team to finish all works related to finishing work of building facades, steel structures and infra-structures to snag list. Show less • Project: Military colleges and institutes project in the military entity.• Location: The New Administrative Capital.• Owner: The Egyptian Ministry of Defense.• Consultant: Dar El-Handasah consultants• Budget: Around 32 billions L.E.• Project brief: Consists of conference hall, all military colleges, military institutions and administrative buildings of the project, I have executed the Main gate of project, 2 secondary gates, and now working on executing process of a the conference hall with 14000 m2 of area including all pre-stressed works on site . Show less • Project: New Administrative Capital Residential Neighborhood (R 05).• Location: The New Administrative Capital.• Owner: Ministry Of Housing & Urban Communications.• Consultant: ECG group.• Budget: Around 9 billions L.E.• Project brief: Consists of 7 clusters with 15000 m2 of area for each of them, Each one contains 5 residential buildings with 2 basements and 6 typical floors, I was responsible of executing 2 main clusters from A to Z of the construction process including all pre-stressed works on site till the finish delivery to the client. Show less • Project: New Administrative Capital Residential Neighborhood (R 05).• Location: The New Administrative Capital.• Owner: Ministry Of Housing & Urban Communications.• Consultant: ECG group.• Budget: Around 9 billions L.E.• Project brief: Consists of 7 clusters with 15000 m2 of area for each of them, Each one contains 5 residential buildings with 2 basements and 6 typical floors, I was responsible of executing 2 main clusters from A to Z of the construction process including all pre-stressed works on site till the finish delivery to the client. Show less • Project: El Mansoura (1) project.• Location: The New Administrative Capital.• Owner: The Egyptian Presidency.• Consultant: 5+ UDC offices.• Budget: Around 30 billions L.E.• Project brief: Consists of The Main Presidental Palace 60000 m2 of area, 5 Presidential Villas, Administrative and Utilities buildings, I have worked on executing process of 30000 m2 of the area of the palace including pre-stressed slabs, internal finishing of building and other landscape works outside the building. Show less

      • Site Engineer Section Head

        Sept 2023 - now
      • Senior Site Civil Engineer

        Feb 2022 - Sept 2023
      • Senior Site Civil Engineer

        Jul 2021 - Jun 2022
      • Site Civil Engineer

        Jun 2019 - Jan 2022
      • Site Civil Engineer

        Jul 2017 - Jun 2019
  • Licenses & Certifications