Jose Manuel Izquierdo Miralles, PMP®

Jose Manuel Izquierdo Miralles, PMP®

IT Engineer

Followers of Jose Manuel Izquierdo Miralles, PMP®543 followers
location of Jose Manuel Izquierdo Miralles, PMP®Greater Jerez de la Frontera Metropolitan Area

Connect with Jose Manuel Izquierdo Miralles, PMP® to Send Message

Connect

Connect with Jose Manuel Izquierdo Miralles, PMP® to Send Message

Connect
  • Timeline

  • About me

    Senior Planning Engineer

  • Education

    • Universidad Politecnica de Cádiz

      2000 - 2004
      I.T. Engineer
  • Experience

    • Dragados Offshore. Templayd PROJECT

      May 2001 - Sept 2001
      IT Engineer
    • Dragados Offshore. IPC

      Feb 2002 - Aug 2002
      IT Engineer
    • Dragados Offshore

      Sept 2003 - Jul 2005
      Planner / Progress Control/ Cost Controller

      The Hammerfest Project was a 25,000 Ton barge mounted Liquid Natural Gas Plant. My roles included: carrying out diverse activities, such as: Progress, Production and Manhours Control, Cost Control, and at the end of the project I was updating activities on P3.

    • Acciona Infraestructuras S.A.

      Nov 2005 - Oct 2011

      The Termosolar Project "Palma del Río I & II" CSP plant brought into service to generate clean electricity equivalent to the consumption of around 35,000 homes. It represents an investment of around 247 million Euros and it is the fourth CSP plant that the company has grid connected in Spain, taking its operating capacity in the country to 200 megawatts and achieving a market share of 23,5%.On this project was the Planning and Logistics Manager. Responsible for Planning, reporting, cost control for several important projects in Andalucia:- Total Terminal Internacional in Algeciras (TTIA).- Design and construction of an extension to the Guadalquivir sewage treatment plant in the municipality of Palomares del Río (Seville)- Lucena-Cabra (Cordoba) highway project.- Piping of the Combined-cycle power plant in Campañillas (Malaga) for Alstom.- Extension of Piers no. 1 at the Rota naval base (Cádiz). The Adriatic LNG terminal is a liquid natural gas offshore terminal 9 miles (14 km) offshore near Rovigo, Italy in the northern Adriatic. It is the world's first offshore gravity-based structure LNG regasification terminal.My roles inclued: updating progress on P3, control of actual hours, cost control, weely and monthly reporting.

      • Planning and Logistics Manager

        Aug 2010 - Oct 2011
      • Planning Manager

        Oct 2007 - Jul 2010
      • Planner / Progress Control, Acciona Infraestructuras S.A.

        Nov 2005 - Sept 2007
    • Grupo Cobra

      Feb 2012 - Apr 2013
      Planning Manager, Moncobra S.A. (Cobra Group)

      Responsible for the planning of several projects in Andalucía also cost and production control for Jasmine Project, an oil platform for Dragados Offshore S.A. in Puerto Real.

    • Tecnicas Reunidas

      Jul 2013 - Apr 2015
      Planning Engineer

      TOTAL Raffinaderij Antwerpen - OPTARA Project. The objetive of TOTAL is to increase the profitability of the Antwerp refinery.

    • Abengoa

      May 2015 - Jan 2017
      Senior Planning Engineer

      Reports to the Planning Director and responsible for setting up a schedule, tracking and monitoring this schedule and providing project management with essential input for the controlling of the project.

    • Navantia s.a.

      Jan 2017 - now
      Senior Planning Engineer

      Implementation of the Planning Methology in the assigned Naval Projects. Monitoring progress during construction and re-programming if required. Preparation of detailed naval programmes from information produced at Outline Design and Detailed design stage. Production of Cost Forecast and operation Earned Value Management process.

  • Licenses & Certifications

    • Project Management Professional (PMP)®

      Project Management Institute
      Jun 2017
      View certificate certificate