Bahruddin Khan

Bahruddin khan

bookmark on deepenrich
location of Bahruddin KhanDubai, United Arab Emirates
Phone number of Bahruddin Khan+91 xxxx xxxxx
Followers of Bahruddin Khan615 followers
  • Timeline

    Aug 2006 - Dec 2009

    Engineer Electrical

    The DESIGN'O
    Jan 2010 - Feb 2011

    Technical Support Executive

    Star Touch India Pvt. Ltd
    Mar 2011 - Aug 2013

    Engineering Executive

    IBM
    Sept 2013 - Jun 2015

    Project Electrical Engineer

    Stunner Consultancy Services Pvt. Ltd.
    Feb 2016 - Feb 2018

    Electrical Site Engineer

    Agnice Electromechanical L.L.C, Dubai
    Mar 2018 - Nov 2020

    Site Engineer

    KGN INFOTECH LLP, GHAZIABAD (DELHI/NCR)
    Current Company
    Jan 2021 - now

    Project Engineer

    Panacor Technologies LLC
  • About me

    Project Engineer MEP, ELV, Electrical Engineering

  • Education

    • Maulana azad college of engineering & technology, patna

      -
      Bachelors of engineering electronics & communication engineering
    • Carmel school, madhupur

      -
      Nursery to 3rd standard

      Activities and Societies: Nothing. From Nursery to Class 3rd.

    • National institute of engineering & technology, new delhi

      2014 - 2015
      Master of engineering - meng electrical and electronics engineering
    • Jamtara college, jamtara

      1993 - 1995
      Intermediate junior high/intermediate/middle school education and teaching
    • Edward george high school

      1987 - 1993
      Matriculation
    • Maulana azad college of engineering and technology, patna

      1999 - 2006
      Bachelor of engineering - be electrical, electronics and communications engineering a
  • Experience

    • The design'o

      Aug 2006 - Dec 2009
      Engineer electrical

      • Looking after all type of Electrical operation & maintenance within the organization.• Monitoring preparing checklist for lux level of work station areas, earth status of various Electrical equipments as per schedule. Planned preventive maintenance of all the Electrical Equipments.• Interaction with Contractors and Consultants. Prepare weekly and monthly report. • Monitoring daily checklist and Auditing at frequent level. Maintenance records of daily Energy Consumption, Comparing with past records and Analyzing. Investigate for any abrupt changes. Show less

    • Star touch india pvt. ltd

      Jan 2010 - Feb 2011
      Technical support executive

      • Handled all aspects of networking and technical troubleshooting within the organization.• Efficiently coordinating with NLD & ILD Carriers for all kinds of Traffic related Issues.• Responsible for traffic monitoring from remote and local carriers (Incoming/Outgoing). Providing Support to various call centre customers. Independently managing configuration & Routing of different National / International dial codes through alternate POIs (Point of Interconnect).

    • Ibm

      Mar 2011 - Aug 2013
      Engineering executive

      • Planning yearly maintenance schedules for all the critical equipments at the site.• Prepare RCA report, Incident report, WMS report and CRF report.• Handling all the issues pertaining to O&M of the site.• Prepare shut down activities for carrying out PPMs for all the UPS systems and taking due approvals with action plan from the stakeholders/IT etc.• Preparing Daily/Weekly/Monthly reports. Doing asset management of the site.• Prepare documents for Audits from business controls or third party audits at site by IBM Global Process Services.• Preparing duty roster for all the technical staff at site.• Carrying out budgeting/Cost control of all the O&M Consumables & by providing MIS report to the client.• Prepare Low Cost Initiatives to reduce cost of energy as an initiative on Energy Management.• Maintaining day-to-day maintenance records & documents like Equipment History Card, Breakdown reports, Daily and Monthly Energy consumption report. Show less

    • Stunner consultancy services pvt. ltd.

      Sept 2013 - Jun 2015
      Project electrical engineer

      Implementing the best quality process as a QA/QC Engineer.• Monitoring the quality to detect the violations to codes and standards• Focus on the corrective actions taken to correct the defects.• Ensuring the Construction Contractor & Subcontractors Personnel complied with the Project Quality Program.• Attend meetings with client and Project Inspection. • Weekly & Monthly Quality Reports preparation and submission to Client and Company Corporate QA/QC Manager.• Ensuring all quality records has been completed.• Conduct technical evaluation of E/T equipment, material and ensure everything is complying with the project specification.• Make the compliance statement for the specification.• Making technical submittals for Electrical system for client approvals.• Interpretation of construction drawing, scope of work, established standards and specification applicable to the project. • Rising inspection, Making inspection reports and & QA/QC documentation.• Coordinate with other discipline Quality control inspectors for ensuring that all other discipline activities that require inspection with in Electrical/Telecommunication construction program have been inspected and approved. Show less

    • Agnice electromechanical l.l.c, dubai

      Feb 2016 - Feb 2018
      Electrical site engineer

      • Remarkable experience of supervision in electrical distribution components from substation (HV/LV Switchgear, Transformer, ATS, Generator etc) to consumer’s DBs & / utilities load.• Sound Knowledge of electrical wiring diagram and schematic / single line diagram.• Working closely with the project team to ensure implementation of Electrical works-HV, LV & ELV and meeting client’s requirements in compliance with project Specifications and other related standards.• Responsible of design review and approval of the following contract documents submitted by the contractor.• (a) vendor Pre Qualification, (b) IFC, Shop Drawings & As Built Drawings (c) Method Statements – Installation and T&C and ITP’s (d) Operation and maintenance manuals (e) Material Submittals and Samples.• Checking of all Material Submittal as per specification and Authority Regulations prior for implementations.• Coordinate with the design team to ensure integrated delivery of system.• Discuss and coordinate with the contractors for recommendations and solution of technical issues arise during construction.• Attend Inspection (Work Inspection & Material Inspection) to ensure that work and material are constructed in accordance with the contract document, Standards-BS, NFPA, Authority standard & Method statement.• Start-up / Kick-Off meeting to ensure smooth running of project.• Attend Technical discussion / Meetings with the client, contractor and design consultant representatives to support design and all construction related matter i.e. Various technical issues, • Testing & Commissioning and delivery (Handover) of the Electrical Packages.• LV & ELV Inspection: Carry out inspection activities on MV, LV electrical installation for various projects (Food processing plant & Mall) in order to ensure safety and compliance with contract drawings, specifications.•Ensure safe working at all the time.• Supervise and Inspection of all electrical & ELV activities. Show less

    • Kgn infotech llp, ghaziabad (delhi/ncr)

      Mar 2018 - Nov 2020
      Site engineer

      Job Responsibilities: Remarkable experience of supervision in electrical distribution components from substation (LV Switchgear,Transformer, ATS and Generator) to consumer’s DBs & / utilities load. Assisting the General Manager in the preparation of tender from beginning stage till the submission. Detail study of the scope of tender drawing schedule equipment’s, specification, quantity take off andpreparation of BOQ for electrical equipment’s. Providing guidance to prepare Lighting layout, Power layout, Load schedule, Single line diagram and the relatedengineering calculation, like panel board circuit and main distribution board circuit breaker size selection etc. Responsible of design review and approval of the following contract documents submitted by the contractor. (a) vendor Prequalification, (b) IFC, Shop Drawings & As Built Drawings (c) Method Statements – Installation andT&C and ITP’s (d) Operation and maintenance manuals (e) Material Submittals and Samples. Checking of all Material Submittal as per specification and Authority Regulations prior for implementations. Coordinate with the design team to ensure integrated delivery of system and coordinate with the contractorsfor recommendations and solution of technical issues arise during construction. Remarkable experience of supervision in electrical distribution components from substation (LV Switchgear,Transformer, ATS and Generator) to consumer’s DBs & / utilities load. Responsible for setting of LSIG Trip unit (L – overload protection due to thermal load, S – Short circuit protectionwith short time delay for low level short circuit fault, I – Instantaneous short circuit protection for high levelshort circuit fault & G – Ground fault protection). Adjusting the parameters as per consumer’s load in ACB. Responsible for ELR (Earth Leakage Relay setting) as per the requirements. Responsible for testing of ETU with the help of Multifunctional tester. Show less

    • Panacor technologies llc

      Jan 2021 - now
      Project engineer

      Project Handled:(i) Al Taif Business Centre, Fujairah, UAE, Client – Dubai Investment & Fujairah Investment (Al Taif Investment)(ii) Centrepoint, Dana Plaza, Fujairah (LANDMARK GROUP)(iii) AWQAF (General Authority of Islamic Affairs & Endowment), Fujairah(iv) Fitness First Centre, Sharjah(v) Fitness First Centre, Dubai Silicon Oasis(vi) Fitness First Centre, Safeer Mall, SharjahJob Responsibilities: Sound Knowledge of electrical wiring diagram and schematic / single line diagram. Working closely with the project team to ensure implementation of Electrical works - LV & ELV and meeting client’s requirements in compliance with project Specifications and other related standards. Responsible of design review and approval of the following contract documents submitted by the contractor. (a) vendor Prequalification, (b) IFC, Shop Drawings & As Built Drawings (c) Method Statements – Installation and T&C and ITP’s (d) Operation and maintenance manuals (e) Material Submittals and Samples. Checking of all Material Submittal as per specification and Authority Regulations prior for implementations. Coordinate with the design team to ensure integrated delivery of system and coordinate with the contractors for recommendations and solution of technical issues arise during construction. Ensure safe working at all the time and zero accidents are maintained for all project staff.Supervise and Inspection installation of device for low current system (Lighting and small power system, Earth & lightning protection system and ELV System (BMS, Fire Alarm, PA System, CCTV, Access control, Disabled Alarm, Leak detection in CHW & Refrigerant, Telephone and data, Structure cabling system, Digital signage, Multimedia LED, Audio Visual & Background Music system, Projector Screen with Projectors including scissor lift, IPTV.))Inspection of all electrical & ELV activities. i.e., Installation of cable tray,Trunking & GI-PVC Conduit, cables/wires pulling/laying & Termination, Show less

  • Licenses & Certifications

    • Ccna