
Timeline
About me
Project Manager
Education

Far east academy of public service
2000 - 2003Bachelor of laws (llb) tax law/taxation
Far eastern state transport university
1994 - 2000Engineer's degree civil engineering
Experience

Ngch-8, division of a far-eastern railways
Sept 2000 - Sept 2003Chief of the siteCarried out constructional and repair works at the projects of distance of civil constructions of Far-Eastern Railways Komsomolsk - Sovietskaya Gavan. Provided theme with all means of deliveries and supplies;Worked in the close cooperation with the Customer (Client) agency of Far-Eastern Railways, produced constructional and process documentation, provided the starting-up and adjustment works, putting a projects of a distance on stream;Built up and put into operation boiler at Gurskoye station: carried out earth-excavation works, installation of the foundations, erection of walls, mounting of heating equipment, connection it with the communal utilities and a whole remained scope of works;Resumed and completed construction of a five-storey residential, put it on stream and handed it over with the all living accommodations with their facilities owned by Far-Eastern Railroads to the property of local administrations. Show less

Ser, civil engineering firm
Oct 2003 - Aug 2004Chief of the sitePerformed the common management of erection, installation and finishing works of a residential housing;Coordinated daily works of divisions of enterprise and subcontractors at an elite living accommodation complex;Obtained approvals and permissions of local authorities to carry out starting-up and adjustment works of all communal utilities;Provided commissioning and put the first part of the living accommodation complex into operation.

Poonglim, limited liability company
Aug 2004 - Aug 2005Civil engineerProduced and presented parcel of design and constructional documentation, execution plans for telecommunication compound foundation, sub-sea loading pipeline and building groups N1 and N2 foundations of crude oil export terminal, Chicacheva bay;Supervised works mentioned above, ensuring they had been done in full compliance with procedures, rules and regulations;Acted as a quality control engineer, supervised activities of subcontractors purposed for those scopes of works.

Starstroi llc
Sept 2005 - Dec 2005EngineerProduced 5 of procedures (method statements) regarding constructional activities on “Sakhalin-II” Project pipelines construction;Fulfilled the duties of contractor supervisor on “Sakhalin-II” onshore pipelines construction.Fulfilled the duties of quality control engineer on “Sakhalin-II” onshore pipelines construction.Managed subcontractor activities on works mentioned above.

Fujikura ltd
Jan 2006 - Oct 2006EngineerResolved the matters arising during FOC lines construction with local authorities;Fulfilled the duties of contractor supervisor on “Sakhalin-II” fiber optic cable line construction;Fulfilled the duties of quality control engineer on “Sakhalin-II” fiber optic cable line construction;Managed subcontractor activities on works mentioned above.

Bets bv
Oct 2006 - Jul 2008EngineerPrepared and submitted about 10 of construction documents required for precommissioning and commissioning of Onshore Plant Facility, Sakhalin-II Project;Produced over 5 of method statements for new development areas at Onshore Plant Facility, Sakhalin-II Project.

Severenergia, eni subsidiary
Jul 2008 - Mar 2011Civil engineerAs contract holder for a number of survey, design and construction contracts related to oil and gas field development was responsible for:Management of call-off process;Monitoring of contractor performance;Monitoring of compliance with contract terms and conditions;Performance of financial and budgetary controls;Verification and authorization of invoices;Inspection, certification and acceptance of works and services;Management of periodic reporting;Initiation of contract close-out after contract completion;Initiation of procurement process where variations and/or amendments to the contract were required;Instruction in writing finance department to deduct from any contractor’s invoice;Prepare feedback on contractor performance. Show less

Shtokman development ag
Mar 2011 - Aug 2012Construction coordinatorAs engineer in charge for GTU Complex site preparation and onshore pipeline construction contracts was responsible for:Preparing outline summary of scope of work, intended remuneration system, time for completion and main responsibilities of the Parties;Preparing and distribution the pre-qualification questionnaire trough all the approved list of prospective tenderers indicating deadline for responses;Performing an evaluation of all the responses and make up a prequalification report containing a uniform set of data on each prospective tenderer and reasons whether or not he may be included into the list of tenderers;Proposition a recommended list of tenderers;Preparation and co-ordination the issue of CFTs;Participation in Tender Opening Commission;Auditing at tenderers premises to clarify any uncertain aspects of the tender;Coordination of bids technical analysis and to be included into Recommendation to Award;Preparation of Recommendation to Award (RTA) based upon the evaluation reports submitted by the tender evaluation team;Preparation of the draft Contract incorporating the agreed qualifications and adjustments together with all required technical and commercial changes including those documented in tender bulletins;Preparation of Letter of Award. Show less

Yamal lng
Aug 2012 - Jun 2016Site preparation managerAs discipline leader I managed the following task:To approve site preparation detailed design and develop site prep tender package for site preparationTo hold a tender for site preparation and get recommendation to award approvedTo ensure execution of site preparation contract with due quality and in timely mannerTo secure site preparation endorsement by EPC contractors with due quality and in timely mannerI was responsible in front of LNG Plant Construction Project Manager for:Timely consideration and approval of site prep detailed design, elaboration of detailed design tender packageTimely site prep tender process, recommendation to award approvalTimely conclusion and execution of site prep contractTimely site prep endorsement of site prep by EPC contractors Show less

Tecnimont russia / agpp project
Jun 2016 - Jul 2019Deputy field engineering managerDrafted and got approved AGPP EPC contractor’s discipline specialists consideration of subcontractor’s technical queries and modification requests related to detailed engineering approved for construction procedure.Drafted and go approved AFC detailed design approved for construction modification log procedure as well as reissue of detailed design approved for construction in new revision procedure considering modifications caused by technical queries and modification requests issued by subcontractors.Secured technical queries and modification requests raised by subcontractors upon internal AFC detailed design control, in course of process quality control and during as-built preparation responds compliance to all domestic rules and regulations in force. Show less

Aeon corporation / gtm one
Jul 2019 - nowChief engineerParticipated in coordination of procedure of FEED packaged prepared by foreign design authority and Basic Design elaborated by domestic design institute consideration by Client’s discipline specialists.Resolved all engineering issues raised during preFEED and FEED phases of Volgograd Methanol Project implementation including but not limited to:• complex engineering survey (topographical, geological, geotechnical, hydrological and ecological) of the site area,• demolition of existing industrial facilities,• site preparation activities.Coordinated project activities with Air Separation Unit, Methanol Offloading Jetty and Railroad Offloading Station. Show less
Licenses & Certifications

Industrial safety with lifting equipment
Khabarovsk state university of technologyAug 2005
Non-destructive tests, visual inspector ii stage
SpectrumJul 2005
Quality control, quality control engineer
Khabarovsk state university of technologyJun 2005
Company project management based on pmi pmbok® 5th edition, project management
Pm expertOct 2013
Preparing for taking pmp® exam, project management
Pm expertOct 2013
Languages
- enEnglish
- ruRussian
Recommendations

Kasun himansha karunathilaka
Design Engineer at Torton Bodies LimitedTelford, England, United Kingdom
Apoorv tayal
CA Finalist || Moore Singhi || SGTBKC'21 ||Delhi, India
Ashish shukla
Assistant Manager at NTTIndia solution Pvt ltd.印度 马哈拉斯特拉邦 孟买
Sudhir dharmsika
Assistant Manager| Data and Tech Lead at Colgate Palmolive |Ex J&JMumbai, Maharashtra, India
Susan klingenberg
Founder/President of Little Buckets Farm Sanctuary - In running a nonprofit I wear many hats from mu...Greater Richmond Region
Laila hommos
Global CoordinatorLebanon
Abhishek kumar
Senior Manager at Hindustan Copper LimitedGhatshila, Jharkhand, India
Dr. sakshi jain, ms, els
Senior Manager-Medical Affairs at Tata 1mg || London Business School || University of Mississippi Me...Delhi, India
P.c leschinsky
Owner/Manager: Platteland Meat & Deli; ReKaofela African cuisine restaurantCidade de Joanesburgo, Gauteng, África do Sul
Laura a. brown miller
Manager - Customer Content Services at PR Newswire/CisionGreater Cleveland
...