Farooq Shahbaz

Farooq Shahbaz

Osp Technician

Followers of Farooq Shahbaz316 followers
location of Farooq ShahbazLahore District, Punjab, Pakistan

Connect with Farooq Shahbaz to Send Message

Connect

Connect with Farooq Shahbaz to Send Message

Connect
  • Timeline

  • About me

    Site Engineer DHA Lahore

  • Education

    • Ahmad Hassan Polytechnic Institute,Lahore

      2000 - 2004
      Diploma of Associate Engineer Electrical and Electronics Engineering

      Activities and Societies: Study, Cricket, Visiting, Technical Education In Electronics

    • Preston University

      2006 - 2010
      Bachelor of Technology (B.Tech.) Hons in Electronics Electrical, Electronic and Communications Engineering Technology/Technician

      Activities and Societies: Studying,Cricket,visiting Science Group

  • Experience

    • Worldcall Telecom Limited

      Apr 2005 - May 2009
      Osp Technician

      Providing Internet Services through Coaxial & Fiber Optical Infrastructure. All Services providing by NODES according to CMTS specification using return path frequencies and signal level. Installation and configuration of Customer Premises equipment. Testing and troubleshooting of optical and coaxial cable. Installation wisi fiber nodes. Installation of Scientific Atlanta fiber optical transmitter. Installation and troubleshooting of UPS system and power at NODES. Splicing of Optical Fiber Cable. Broadband Powering Techniques. UPS and Batteries Installation Show less

    • Coding Technologies

      May 2009 - May 2010
      Service Engineer

      Service and Maintenance of Inkjet Machines in different clients (Industries).Installation and Services of Mattel Detector, DOD (Large Character Printers), Hot Role Ink Coder. Troubleshooting and problem in machines, Electrically, Mechanically. Solve the problem in customer end with minimum down time.

    • STM Group, Inc.

      Apr 2010 - Oct 2010
      Field Supervisor

      FOC laying for survey the site preparation and civil work . Checking Quality work and right measurements. Laying HDPE pipe and termination. Splicing and testing optical fiber cable 24 F. Fiber Optical Cable blowing. Installation ODF (Optical Distribution Frame). Check Construction /As-built BOQ and Drawings.Identify the GPS coordinates for the routes , manholes and customer locate

    • ROYAL PALM GOLF & COUNTRY CLUB

      Aug 2013 - May 2015
      Senior Projectionist

      Checking operating and monitoring of DLP Christie (solaria series) digital cinema projectors.Routine Maintenance, Daily Checkups & LogChecking the digital sound quality on cinema Equalizer processor.Maintain daily opening and closing check list of Projection.To resolve Movie & KDM Ingestion issues.Making the show in projector display and playing.Projector:Christie,DigitalCinema,VivetekAudio: QSC, JBL, Krix

    • Prologix Distribution

      Apr 2015 - Apr 2016
      Field Engineer

      Using Fujikura 80s Fusion Arc Splicing Machines.Installing ONT (Optical Network Termination) and ATB in customer end. Splicing optical fiber of ATB (Access Terminal Box).Checking the power level through power meter. Configuration of ONT in customer end from POP.Using EXFO -250 OTDR ANIRTUE OTDRConfigure wireless routers.Patching and dressing of optical fiber patch cords on optical splitters.Using visible fault locator VFL.

    • Wateen Telecom

      Mar 2017 - Jun 2021
      Executive Engineer

      Handling and Supervision of All project FTTx/GPON/ Deployment , Implementation/ LLO (Local Loop Operator).Installation and maintenance of GPON & HFC equipment’s in all hub sites nationwide.Power connectivity of rectification with GPON OLT for powering up.Monitoring all GPON OLT PON cards (GPBC/GPBH/GPFD) Power cards (PRTE) Uplinks cards( GICS/X2CS).Managing strong bonding with team to share ideas for betterment of network. Creating team culture within the teams to improve efficiency and performance.Follow up for timely supply of equipment to different section of FTTx Follow ups for NFA, PO and related matters for timely closure of projects and operations activity.More than 99.5% Network availability in ring. More than 98% availability in Spurs. Planning and ensuring of proactive preventive measures of OLTs NW.Project delivery (New OLT Installation, Any enhancement in HFC). Project handover with Nil major snag Maintaining positive relationship for internal customers while handover.Overall 5-10% reduction in network faults. Identification of network issues. Preparation of network optimization plan.Patching and Dressing of patch cords on OLT.Installation of Splitter in allocated areas.Pro Active Maintenance of GPON OLT and after making progress report.Trouble shooting low optical power level / Optical fiber testing using OTDR, Analyze OTDR Traces.Installation, commissioning and testing of different type of optical devices.Deployment of CCTV system in DHA Lahore at various sites. Show less

    • DHA Lahore

      Jun 2021 - now
      Site Engineer
  • Licenses & Certifications

    • Basic Computer Certificate