ABDUL KAREEM

Abdul kareem

bookmark on deepenrich
location of ABDUL KAREEMDubai, United Arab Emirates
Phone number of ABDUL KAREEM+91 xxxx xxxxx
Followers of ABDUL KAREEM296 followers
  • Timeline

    Nov 2011 - Jan 2013

    Automation Engineer

    Vasek Automation pvt. ltd.
    Jun 2013 - May 2016

    Automation Engineer

    MSJ Engineering
    May 2016 - Aug 2020

    Electrical and Instrumentation Engineer

    Consolidated Contractors Company
    Oman
    Oct 2021 - Feb 2022

    Commissioning Engineer

    Gharshub
    Apr 2022 - Aug 2022

    Electrical and Instrumentation Engineer

    Consolidated Contractors Company
    Current Company
    Sept 2022 - now

    Senior Commissioning Engineer

    Progetti Europa & Global S.p.A
  • About me

    Instrumentation Engineer | Commissioning Engineer| Compex Certified

  • Education

    • Jawaharlal nehru technological university

      2007 - 2011
      Bachelor of technology - btech electrical, electronics and communications engineering a
  • Experience

    • Vasek automation pvt. ltd.

      Nov 2011 - Jan 2013
      Automation engineer
    • Msj engineering

      Jun 2013 - May 2016
      Automation engineer

      • Assist Project Development Manager in writing and preparing exhibits for proposals and contracts.• Assist Project Development Manager with technical aspects of customer presentations.• Prepare Interconnection design and equipment/Instrument selection.• Assist with the preparation of the project cost estimating sheets• Collaborate with Project Engineers and Development Managers to provide project support for development, design and cost estimation activities.• Develop technical specifications and scopes of work for engineering firms and contractors, and review Supplier/Vendor data sheets• Designed HMI Graphics and PLC Ladder logic Programming for Honeywell PLC 2MLR.• Prepared BOQ, BOM, Data Sheets, Panel Wiring Diagrams/Interconnection Diagrams and O & M Manuals.• Supervised Panel wiring and assembly of Panel Internal Components.• Perform FAT/SAT.• Provide on-site support for Installation/Termination of HVAC Instruments on site to construction team.• Perform Commissioning of Honeywell PLC HVAC System.• Engineering support during construction, system commissioning and troubleshooting.• Perform Pre commissioning, Testing & Commissioning of HVAC control Panel with all instruments & field devices (AHU, FAU, EDH, FCU, EHU and Chillers). • Conducted FAT for HVAC systems for hand over.• Technical review and feasibility study of tender specifications for PLC systems, ESD and F&G systems.• Preparation and testing of HMI screens and PLC programs.• Design Engineering (include Panel Design),Testing & commissioning, Troubleshooting, PLC SoftwareHMI configuration of 16 x HVAC systems involving Honeywell 16 x Hot Standby, Redundant.ML200R PLC and 16 x Honeywell HCiX , HMI Systems, PLC Design including the preparation of Functional Design Specifications. Show less

    • Consolidated contractors company

      May 2016 - Aug 2020

      • Supervised E&I team as required to successfully complete the buildings Electrical, Instrumentation and Telecom activities on schedule and within budget and quality workmanship.• Maintained construction schedule, identifying and solving site technical/logistic problems.• Prepared Material Take Off and requested material as per drawings and site requirements.• Monitored daily construction details and daily progress. Maintained the highest quality standards within administering good construction safety practices.• Coordinating with other discipline especially in case of multitask activities such as (Mechanical, Civil… etc.), • Promoted job site safety and encouraged safe work practices by rectifying job site hazards immediately.• Ensured availability of work required material. • Supervising and controlling manpower for completion of following:· Installation, Testing & Commissioning of HVAC system and F&G system.· Cable pulling and cable Glanding / termination. Livening up and energization of lighting systems.· Installation of HV 3.3KV switchgears.· Installation of UPS system· Installation of Instrumentation marshaling cabinets / network cabinets and LV panels / Switchgears.· Installation and completion of F&G system. · Installation and completion of HVAC system. Show less • Procured the material as described in contract/scope of work based on design drawings and company standards. • Prepared the design drawings like SLD, Cable Schedule & wiring Diagram for Camp & Warehouse for Lighting, Fire & Gas & Telecom Systems.• As a PDO Permit Applicant prepared permits for construction & commissioning activities in commissioning area. Performed Instrument pre commissioning (loop check) & Commissioning (functional check).• Performed cause & Effect and Control Narrative of the system and subsystems.• Dismantling the OHL line while demobilizing the camp. Installation/Erection of new OHL Line and connecting to existing line.• Dismantling, shifting & Re Installation of Lighting, Fire & Gas, HVAC and access control systems in warehouse from one location to another location during demobilization.• Monitored site progress and work outcome to ensure proper manpower allocation and that job completion is done as per project specifications and within quality limits.• Coordinating with other discipline especially in case of multitask activities such as (Mechanical, Civil… etc.), Solving and sorting out problems which require technical advice.• Conducted testing on electrical systems, including final inspections prior to job completion• Ensured that plans and work are completed according to project specifications and standards.• Resolved issues related to Electrical, Instrumentation or telecom activities that arise during the course of construction. • Wisely estimated manpower and timelines based on project management / site requirements. Show less • Installation and termination of control related devices and equipment’s.• Follow cable pulling, glanding & termination for Equipment’s, Instruments, HVAC Panel & Switchgear panel.• Followed Termination, Installation and calibration for Control devices like Pressure differential switch (PDS), Pressure Differential Transducer (PDT), Temperature sensors (TE), Thermostats, Humidity and Temperature Transducers (HTD).• Installation and termination of HCP (HVAC Control Panel). • Raised Inspections, Ex Inspections and got them approved. • Following Air balancing, chiller commissioning with vendors. Reviewing drawings if required making RLM’s. • Pre commissioning, Testing & Commissioning of HVAC control panel with all instruments & field devices (AHU, FAU, EDH, HUMIDIFIER, FCU, EHU and Chillers).• Closure of punch items which are raised during walk downs by witnessing the client.• Conducted SAT for HVAC systems for hand over. Issuing permits for commissioning activities.• Coordinating mechanical HVAC for mechanical activities (air balancing & chemical cleaning etc.)• Reporting work activities to Project Manager on daily basis. Actively involved in Installation, Commissioning, Start-up and Operations & Maintenance of complete Instrumentation and Control Systems Assets.• Involved in logic checks and loop checks at site during pre- Commissioning and commissioning activities.• To co-ordinate and supervise erection jobs as per approved drawings and specifications.• To maintain a good record of all the documentation related to the projects undertaken and todevelop as built drawings documents for assigned projects. Show less

      • Electrical and Instrumentation Engineer

        Oct 2019 - Aug 2020
      • Electrical & Instrumentation (pre-commissioning) Engineer

        Oct 2017 - Oct 2019
      • Electrical and Instrumentation Engineer

        May 2016 - Oct 2017
    • Gharshub

      Oct 2021 - Feb 2022
      Commissioning engineer
    • Consolidated contractors company

      Apr 2022 - Aug 2022
      Electrical and instrumentation engineer
    • Progetti europa & global s.p.a

      Sept 2022 - now
      Senior commissioning engineer
  • Licenses & Certifications

    • Compex core competence

      Eemua
      Nov 2016