Behzad Rakei

Behzad Rakei

Welding Engineer / Inspector

Followers of Behzad Rakei876 followers
location of Behzad RakeiTehran, Tehran Province, Iran

Connect with Behzad Rakei to Send Message

Connect

Connect with Behzad Rakei to Send Message

Connect
  • Timeline

  • About me

    IWE/SFI/Welding Engineer/Audit/Quality engineer/Quality inspector/Suppler Quality/vendor&supplier Assessment/NDT/supply chain inspections and assurance of equipments in Oil, Gas and Petrochemical industries

  • Education

    • Amirkabir University of Technology - Tehran Polytechnic

      2013 - 2016
      Master's degree Welding Engineering Technology/Technician
    • Islamic Azad University

      2001 - 2006
      Bachelor's degree Materials Engineering
  • Experience

    • Behineh Kavosh Sanat (BKS)

      Jun 2010 - Sept 2018
      Welding Engineer / Inspector

      -Quality assurance expert as well as representative of management in quality management system,-Training activities in position of welding inspection and welding engineer instructor for more than 800 hours.-Crane and Lifting appliances inspection during operation supervisor. Such as performing load test and Condition survey, performing NDT on crane structures and loss accessory (below hook devise) in order to ensure soundness of it and avoid of failure due to fatigue phenomena, -Preparation of quality control plan based on projects requirements,-Preparing and Reviewing WPS, PQR, WPQT of oil, gas, petrochemical, ship and structural industries,-All welding activities (prior, during and after welding) such as welder test, based material inspection, WPS review and test coupon preparation, welding supervision and laboratory test results evaluation, fit up control, controlling of all welding parameter such as preheat and inter-pass temperature and etc. VT, dimensional control, PWHT performance and graphs control, repair welding, NDE supervision according to related ITP/QCP as resident inspector in Manufacturer Company. Show less

    • Pars Oil and Gas Company (POGC)

      Jun 2012 - Nov 2013
      Project Quality Expert

      -POGC Representative on C-master PLB barge for pipe laying-Persian Gulf (32” API X65QS PSL II lines 19A,C with 2 lines 4” Piggy Back & SPM; pipe lines length: ~230KM) -POGC Representative on onshore site for onshore pipeline section (32” lines 19A,C with 2 lines 4” Piggy Back ; 36" pipe line length: ~6 KM with their related equipment ) -Reviewing Inspection and Test Plan (ITP) and participate on Pre-inspection meeting (PIM) in order to finalize it with all involves parties,-Reviewing Vendors documents such as testing and manufacturing procedure and compare with project and client requirements,-Inspection during manufacturing (domestic and overseas) of materials and equipment such as Flange, Fitting, Pressure vessels and etc. based on project specification and related international standard( for example ASTM A106,A234, A105,A860,A240,A216,API 5L,5LD, API 598,NACE MR0175, NACE TM177 and 284, AWS d1.1 and etc.)-Reviewing and approving WPS, PQR, WPQT of sour pipeline and piping for field ( offshore and onshore) activities and witnessing of related laboratory tests, in various materials such as carbon steel, stainless steel, cladded specially inconnel 625-Supervision/Evaluation on performing NDT such as VT, PT, UT and MT in vendors shop and Field activates.-Supervision/Evaluation on performing NDT such as VT, PT, UT and MT in vendors shop and Field activates-Supervision/Evaluation on performing NDT such as VT, PT, UT and MT in vendors shop and Field activates.-Interviewing with third party inspector prior to register as qualified inspection to POGC inspectors pool,-Meeting with Contractor or vendors to resolve technical matters-Review Site/Vendors Technical Query related to welding and NDT matter.-Witness of preparing WPQT sample and Mechanical, chemical and Corrosion test of pipeline, Riser, Spool, Jacket and Top side-Witness of Mechanical, chemical and Corrosion test for Bulk Material Qualification-Witness of performing Final test of Vendors’ packages Show less

    • SAED Co.

      Nov 2013 - Apr 2022
      Project Quality Engineer

      -Preparation of quality plan in order to achieve project and client requirement,-Second party audits of vendors and contractors quality management system as per last revision of ISO 9001standard,-Internal audits of company QMS according to last revision of ISO 9001 standard,-Attending QMS committee to determine and identify Quality Management System processes; their sequences and interactions, determine KPIs, measure, analysis and improvement them. -Performing vendor’s assessment (domestic and overseas) before tendering in order to verify capacity and quality level of them,-Reviewing of Lifting plan in Heavy lifting operation based on ASME P30.1 standard,-Condition survey of Cranes which are directly rented by SAED based on ASME B30.5, B30.2 standard, -Inspection (domestic and overseas) during manufacturing of materials and equipment such as Pipe, Plate, Flange, Fitting, Valves, Pressure vessels, cranes and etc. in various materials such as carbon steel, stainless steel, cladded specially inconnel 625 based on ( for exampel ASTM A106,A234, A105,A860,A240,A216,API 5L,5LD, API 598,NACE MR0175, NACE TM177 and 284, AWS d1.1 and etc.)-Supervision/Evaluation on performing NDT such as VT, PT, UT and MT in vendors shop and Field activates.-Reviewing Inspection and Test Plan (ITP) and participating in Pre-inspection meeting (PIM) to finalize it with all parties,-Reviewing Vendors documents such as testing and manufacturing procedure and compare with project and client requirements,-Preparation and reviewing WPS, PQR, WPQT of sour and non-sour pipeline and piping for field activities as well as witnessing laboratory tests, -Interviewing third party inspector prior to registry as qualified inspection to SAED inspectors pool,-Reviewing Third Party Inspection (TPI) company’s report to check inspection results and non-conformity report (if any) and take further action and check TPI activates/progress Show less

    • Freelance

      Apr 2022 - now
      Welding Engineer / Quality Engineer for pressure equipment in Oil & Gas & Petrochemical

      -Reviewing Vendors documents such as testing and manufacturing procedure and compare with project and client requirements,-Prepare and reviewe welding Procedure Specification (WPS), Procedure qualification records (PQR), Welding Procedure qualification test (WPQT) and welder Qualification test (WQT), of sour and non-sour pipeline and piping for field activities based on related standard such as API 1104, API 650,DNV-of-o-101, ASME boiler and pressure vessels section IX and VIII

  • Licenses & Certifications

    • Corrosion control in refining Industries

      GL
    • Auditing Traning - ISO9001:2008

      DQS
      Nov 2011
    • Environmental Management systems Internal audit” (Based on ISO 14001:2015)

      TÜV AUSTRIA Group
      Jan 2021
    • Project Management based on PMBOK

      Iran Project Management Association
      Jan 2021
    • API Plant Inspector

      TÜV NORD GROUP
      Feb 2020
    • Pressure Vessel and piping repair inspection in accordance with ASME PCC2:2018

      TÜV NORD GROUP
      Jan 2020
    • In-Service Storage tank Inspection according to API 653:2018 and EEMUA 159:2017

      TÜV NORD GROUP
      Jan 2020
    • - In-service piping inspection and demonstrated proficiency by successfully completing the supplemental certification according to API 570 and ASME code

      TÜV NORD GROUP
      Dec 2019
    • - Vessel Inspection and has demonstrated proficiency by successfully completing the close & open examination according to API 510 certification program

      TÜV NORD GROUP
      Nov 2019
    • Lead Auditor based on ISO9001:2015

      TÜV NORD GROUP
      Jan 2019
    • Design and welding standard for steel buildings in seismic area

      International Institute of Welding
      Jan 2009
    • Occupational Health & Safety Management systems Internal audit” (Based on ISO 45001:2018)

      TÜV AUSTRIA Group
      Jan 2021
    • RBI (Risk based inspection)

      International Institute of Welding
      Jan 2009
    • Introduction to ISO 3834

      Iwrec
      Jan 2008
    • International welding engineer

      International Institute of Welding
      May 2007
    • Radiography film interpretation based on SNT-TC-1A

      Behineh Kavosh Sanat (BKS)
      Oct 2018
    • Ultrasonic Test Level II Based on SNT-TC-1A

      Behineh Kavosh Sanat (BKS)
      Oct 2018
    • Penetration Test Level II Based on SNT-TC-1A

      Behineh Kavosh Sanat (BKS)
      Sept 2018
    • Visual Test Level II Based on SNT-TC-1A

      Behineh Kavosh Sanat (BKS)
      Oct 2018
    • Magnetic particles Test Level II Based on SNT-TC-1A

      Behineh Kavosh Sanat (BKS)
      Sept 2018
    • CWI based AWS-QC1

      GERMANISCHER LLOYD
      Jan 2009
  • Honors & Awards

    • Awarded to Behzad Rakei
      IPMI Gold winner 2021 IPMI Jul 2021 IPMA Gold winner in mega project 2021