SidAli MENAI

SidAli MENAI

Stagiaire

Followers of SidAli MENAI3000 followers
location of SidAli MENAIAlgeria

Connect with SidAli MENAI to Send Message

Connect

Connect with SidAli MENAI to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • INERIS

      2018 - 2018
      CERTIFICAT DE COMPETENCE ATEX Chargé d'Exécution, Niveau 1-Electrique

      CERTIFICAT DE COMPETENCE ATEX: Chargé d'Exécution, Niveau 1-Electrique délivrée par l’Institut National de l’Environnement Industriel et des Risques (INERIS)

    • Strategika

      2014 - 2014
      Project management
    • INJAZ EL Djazair

      2012 - 2013
      Certificat de réussite Entrepreneuriat
    • Organisation Mondiale de la Propriété Intelectuelle OMPI

      2012 - 2012
      Certificat de réussite au cours générale de proprieté intellectuelle
    • Ecole Prépratoire Science et Technique d'Alger

      2009 - 2011
      Certificat de réussite Science et Technique
    • Ecole nationale polytechnique

      2011 - 2014
      Ingénieur Génie industriel option Management de l'Innovation
    • Indiana University - Kelley School of Business

      2013 - 2013
      Certificate of Successful completion of the Global Business Institute MENA Program Entrepreneurship and Business
  • Experience

    • NCA

      Dec 2011 - Jan 2012
      Stagiaire

      Internship at NCA in production process.

    • SNVI

      Mar 2012 - Mar 2012
      Stagiaire

      Un stage en gestion de la production et de stock au niveau du service ordonnancement montage autobus.

    • LINDEGAS

      Aug 2012 - Sept 2012
      Stagiaire

      Internship at LINDEGAS in gas production process.

    • ErgoBios

      Jan 2013 - Jan 2014
      Production
    • Ecole nationale Polytechnique

      Feb 2013 - Feb 2013
      Evénement

      Particippated in 48h innovation event through the international Tempus program at the national polytechnic school in Algiers

    • GRTG SONELGAZ

      May 2013 - May 2013
      Stagiaire
    • AIESEC babez

      Jun 2013 - Dec 2014
      Team Leader OGEX
    • TAKPVC

      Sept 2013 - Sept 2013
      Stagiaire

      Internship in the process department at TAkPVC .

    • Sonatrach

      Feb 2014 - Jun 2014
      Gestion des risques

      Projet de fin d’étude au sien de la Direction Opération-Division Production SONATRACH : Evaluation des risques liés aux processus d’achat par Appel d’Offres.

    • GSK

      Oct 2014 - now

      • Supervise external contractors engaged to execute Maintenance and calibration works within your remit ensuring compliance to GSK contractor management & work permit procedures. • Ensure all safety critical maintenance and calibration tasks within your remit are executed within due date and in-line with local SOP • Adhere to all work place and GSK EHS requirements at all times – role model this behavior. • Support the resolution of safety alerts to agreed timelines • Ensure all quality critical maintenance & calibration tasks within your remit are executed within due date and in-line with local SOP • Facilitate & influence other Engineering Departments & Operations to achieve zero deviations with respect to quality critical maintenance and calibration tasks. • Facilitate all Engineering deviations • Develop & maintain systems within the Engineering store to manage all Gxp spare parts in-line with Quality standars (GQMP, GQP&GQG). • Maintains the site maintenance management system (CMMS) • Facilitate meetings to obtain the production downtime • Highlights non-compliant maintenance and calibration• Manages the work request system• Consolidates planned engineering maintenance• Represents the Engineering Planning function at the weekly schedule sign off and OFM meetings. • Works with the Reliability Engineer and Project & Planning Engineer & relevant Production Team to review maintenance plans and execution and identify and implement improvements to ensure all maintenance tasks are completed within schedule, in full and address known issues on the equipment. Store and Inventory Budget Management • To continuously improve & maintain systems for R&M budget tracking & forecasting on a monthly basis. • To develop and maintain systems required to manage a fully automated inventory management • To update & maintain Engineering Critical Spares Assessment sheets• Develop and facilitates/maintains a “kitted parts bin” Show less • Facilitate and complete the L 1 audit program for all engineering• Participate in other audits as part of the 'Mission control team' as requested for L2-L3-L4 audits and act as the engineering point of contact for coordination of answer to L2 findings.• Archive the engineering related audit report and update the tracker accordingly.• Ensure that Engineering is compliant with latest applicable EHS, Quality or Engineering alerts by taking part of the assessment, definition of action plans and answer coordination when applicable.• Ensure that site keeps up to date and compliant on all (GES) Global Engineering Standards by facilitating the completion and making sure the gaps are properly identified and tracked.• Act as the expert on compliance level and provide oversight and guidance in site wide processes like Contractor Management, Legionella Management, Zero Access, LOTO, Machinery Safety etc.• Track engineering SOP lifecycle. Support author to make sure all documents are current and reviewed on time to avoid compliance issues.• Participate in the Plant Recovery Report process and Root Cause Analysis as requested.• Facilitate the process of raising, tracking and managing change controls for all Engineering departments and make sure that actions are completed in a timely manner to avoid compliance issues.• Collect data and generates meaningful metrics to asses performance.• Lead a daily & weekly Engineering meeting to review the KPls with all Engineering Managers, define Compliance Top 3 problems and initiate problem solving.• Collect monthly data, update the Above Site Compliance tracker and send it for approval by Engineering Lead.• Provide support to other Engineering teams as required..CMMS Administrator.Non-GxP change control process owner.e-validation system Administrator.Management of all Facilities Maintenances.Pest control Management. Show less • Facilitate and complete the L 1 audit program for all engineering• Participate in other audits as part of the 'Mission control team' as requested for L2-L3-L4 audits and act as the engineering point of contact for coordination of answer to L2 findings.• Archive the engineering related audit report and update the tracker accordingly.• Ensure that Engineering is compliant with latest applicable EHS, Quality or Engineering alerts by taking part of the assessment, definition of action plans and answer coordination when applicable.• Ensure that site keeps up to date and compliant on all (GES) Global Engineering Standards by facilitating the completion and making sure the gaps are properly identified and tracked.• Act as the expert on compliance level and provide oversight and guidance in site wide processes like Contractor Management, Legionella Management, Zero Access, LOTO, Machinery Safety etc.• Track engineering SOP lifecycle. Support author to make sure all documents are current and reviewed on time to avoid compliance issues.• Participate in the Plant Recovery Report process and Root Cause Analysis as requested.• Facilitate the process of raising, tracking and managing change controls for all Engineering departments and make sure that actions are completed in a timely manner to avoid compliance issues.• Collect data and generates meaningful metrics to asses performance.• Lead a daily & weekly Engineering meeting to review the KPls with all Engineering Managers, define Compliance Top 3 problems and initiate problem solving.• Collect monthly data, update the Above Site Compliance tracker and send it for approval by Engineering Lead.• Provide support to other Engineering teams as required..CMMS Administrator.Non-GxP change control process owner.e-validation system Administrator Show less - Gestion de la calibration des instruments en conformité avec les standards Engineering et Qualité de GSK.- Elaboration du planning de calibration.- Tracking des activités de calibration - Evaluation de la criticité des instruments/équipements.- Responsable de la codification des instruments/équipements.- Gestion du Master list des équipements.- Investigation team leader pour la résolution des problèmes.- Management des changements (Process change control).- Implémentation de l’AMDEC pour maitrise de la contamination physique du produit.- Effectué les Audit Engineering et EHS niveau 1.- Gestion des déviations.- Administrateur Infor EAM (GMAO)- Lock-Out Tag-Out process owner.- Chargé d'Exécution en ATEX (certificat de compétence, Niveau 1-Electrique Show less

      • Project Manager

        Oct 2022 - now
      • Maintenance planning and calibration Manager

        Nov 2021 - Nov 2022
      • Engineering compliance and Facilities Manager

        Sept 2020 - Nov 2021
      • Compliance Engineer

        Sept 2019 - Sept 2020
      • Calibration Engineer

        Feb 2016 - Aug 2019
      • Assistant Engineer

        Oct 2014 - Jan 2016
  • Licenses & Certifications

  • Honors & Awards

    • Awarded to SidAli MENAI
      T-start ooredoo et ANDPME Certificat Lauréat de la compétition nationale des plans d'affaire du programme t-start édition 2013