Deepak Fulia

Deepak Fulia

Junior Engineer

Followers of Deepak Fulia333 followers
location of Deepak FuliaManosque, Provence-Alpes-Côte d'Azur, France

Connect with Deepak Fulia to Send Message

Connect

Connect with Deepak Fulia to Send Message

Connect
  • Timeline

  • About me

    Project Manager with Strong Technical Project Leadership, Management & Team Building skill

  • Education

    • Institute Of Business Management and Research

      2009 - 2012
      Master's in Business Studies
    • Maharashtra Institute of Technology

      2003 - 2006
      ENGINEERING
  • Experience

    • Raut Engineering Pvt. Ltd - India

      Jul 2006 - Jul 2008
      Junior Engineer

      Designing Plastic injection mould for Automobile and Medical devices.CAM programing on Surf CAM & Master CAM for the Core and Cavity of tool.Exposure od shop floor planning and machine loading.Development of jigs and fixture testing and machining.

    • Jindal Soft Italia Seating PrivateLimited,Chakan,Pune

      Aug 2008 - Jun 2011
      Assistant Manager

      Assistant Manager for Design and Development .Responsible for the Designing the concept models for the Seating System.Developing Proto type and Testing of the product.

    • LTTS deputed to Wärtsilä Norway AS

      Jul 2011 - Apr 2016
      Senior Design Engineer

      • Wartsila Norway AS is designing mainly Controllable Pitch propellers (CPP) &Gear box for marine. • Developing and redesigning the large marine engine Gear box and CPP migrateddata with the help of drawings and other standard’s provided by customer with the help of Team Centre. Mainly use NX,I-Deas as a 3D software & Team center for document release & process.• In continues follow-up with project engineers regarding development of project & its further activity.• Modeling & drafting different components of Gear box &CPP. • Create new models & assembly as per new design for various customers after suitable calculations matching their requirement.• Coordinated with offshore Engineers for better understanding of product & different queries.• Best practices for easy understanding of modeling & drafting in UG NX.• Knowledge sharing with team about the different components of gear box.• Create new designs and solutions together with experienced PME engineer. • Co-ordination with Wärtsilä designers & L&T TS offshore team.• Work package creation, work offload and knowledge transfer for ensuring smooth work execution at offshore• Review of deliveries & submission at customer.• Create layouts, models, specifications and detail drawings and documents for developed components and solutions Show less

    • LTTS deputed to Wartsila Gas solution

      May 2016 - Nov 2019
      Project leader at Larsen and Toubro Technology services.

      Contribute to the development of products by designing, creating and testing sub-systems within the restrictions imposed by system specifications, costs and planning considerations.Responsibilities:-• Worked on the design of one or more products of Inert gas systems, creating designs with a small team of mechanical experts in project setting. Continuously improving quality of mechanical design is a main requirement.• Wartsila Moss Norway IGS is designing and handling mainly Inert gas System Portfolios for marine. • As Project Lead responsible for the design and implementation of specific Gas combustion unit,working together with the architect, team lead and designers, to enable reliable, stable, safe, contamination free, cost effective and easy to manufacture products• In continues follow-up with Project engineers regarding development of project & Support sales with solutions and documentations.• Define the solution and guide several engineers as well as managing supplier feedback for various portfolios.• Responsible to apply the correct mechanical construction principles to installation of Inert gas systems. • Create new models & assembly as per new design for various customers after suitable calculations matching their requirement.• Qualification of the design by contributing to the specification of various tests involved in marine industry.• Designs and realizes tests and appliances and responsible for ensuring that prototypes are built, and tests are carried out.• Coordinating with leaders of Mechanical Constructions team and Functional engineering team, operational within multidisciplinary projects• Document package creation, and knowledge transfer for ensuring smooth work execution at offshore• Create layouts, models, specifications and detail drawings and documents for developed components and solutions • Ensure that new designs and solutions comply with legislative rules. Show less

    • LTTS deputed to ITER organization

      Dec 2019 - now
      Project Manager with Strong Technical Project Leadership, Management & Team Building skill

      Develop and refine engineering and construction work package for handover to TOKAMAK Assembly Contractor, in close collaboration with design teams and Construction Management as Agent (CMA).Monitor and supervise the execution of construction activities, including qualification and training on the construction site.Develop engineering and construction work package based of TOKAMAK system engineering.Understand and Review Feeder design and assembly approach.Understand Feeder interface components.Understand Feeder assembly training and special qualification process.Understand Feeder work organization (EWPs, CWP-dossiers, Tokamak Assembly Contractor)Collaborate with feeder component ROs and a CAD designer in order to prepare the facility, layout and equipment needed for the mock-ups activities that meet the IO safety requirements.Prepare procurement of equipment, office area, stockroom for consumables.Support the feeder’s component and RIT RO's to identify the scope for the different RITs to be performed on IO site/MIFI and plan the work. The specific document and supervision of tests will remain in the responsibility of the feeder component ROs.In collaboration with Feeder component ROs, managed the deliveries onsite as the central Feeder contact person with IO/CST/Material management team.- Documentation consistency for each delivery (BOM, Packing List)- Timely data implementation in SPM at database (Prior ICRR and possibly before material shipping)- On-site receptions together with Feeder component ROs- Feeder components preservation during on-site storage till Tokamak Assembly Contractor handover.- Formulates budget and cost estimates - Identify emerging risk and suggest mitigation or corrective action Show less

  • Licenses & Certifications

    • Developing Emotional Intelligence

      L&T Technology Services
      Feb 2023
    • PMP ATP Certificates of Completion Project Management

      L&T Technology Services
      Apr 2023
    • Scrum Master: Role of the Scrum Master

      L&T Technology Services
      Apr 2023