Hamender Jain CEng

Hamender Jain CEng

Training Engineer

Followers of Hamender Jain CEng671 followers
location of Hamender Jain CEngDelhi, India

Connect with Hamender Jain CEng to Send Message

Connect

Connect with Hamender Jain CEng to Send Message

Connect
  • Timeline

  • About me

    Deputy General Manager

  • Education

    • Government of NCT of Delhi

      2002 - 2003
      Advanced Diploma in computer aided tool engineering CAD/CAM (IDEAS)
    • Delhi School Of Management, Delhi Technological University

      2020 - 2022
      Masters of Business Administration Finance & Supply Chain Management CGPA 8.7
    • Walchand Institute of Technology, Solapur

      1998 - 2002
      Bachelor of Engineering - BE Distinction
  • Experience

    • Sunbeam Auto Private Limited

      Jun 2003 - Jul 2004
      Training Engineer

      I started my career as an Engineer Trainee with Sunbeam in Machine Shop Division. I was responsible for production planning and control, quality control through SPC, manpower management and programming of CNC machines.

    • Northern Technical LLC/ AAF

      Jun 2004 - Nov 2006
      Project Engineer

      Role and Responsibilities:• Efficiently monitored the installation and commissioning of Gas turbine Air Intake and Exhaust system, ducts and support structure on site.• Prepared the method statements for site work execution.• Ensured successful completion of projects with proper HSE as per company policy.• Managed the Risk assessment of job conducted on site.• Successfully coordinated with site and various departments to ensure timely completion of project.• Profitably streamlined the fabrication and manufacturing process to deliver the right quality product at right time. • Effectively reduced the lead time of project by combining the activities and removing the unproductive activities and time.• Successfully reducing the 4 man-days by optimizing the project execution process at site. Show less

    • Alstom Power

      Feb 2007 - Sept 2012

      I led the following projects - Tzafit (Israel), 417 MW CCPP, Novogorkovskaya (Russia), 2X179 MW equipment only, Akdemicheskaya (Russia), 179 MW equipment only, Nizhne-turinskaya (Russia), 2X179 MW equipment only and Utran (India), 370 MW CCPP. Key Result Areas specifically undertaken by me• Actively participated in the project kick off meeting with Lead center.• Study and listing of contractual requirements and prepared deviation list.• System calculation, system process design data, P&ID creation, engineering specification of mechanical system, technical specification of mechanical components, Hazop analysis• Involved in project specific PDMS review and Project specific P&ID review. • Interacted with internal & external customers and discussed with various other interfaces involved in project.• Prepared the project specific external technical documents for suppliers.• Selected the project specific GT mechanical system equipment out of various available sales options.• Handling the supplier’s technical queries.• Conducting final inspection of components at supplier works.• NCR analysis and disposition• Initial field service instructions for site.Site Support Activities: Prepared initial field service instructions for site:• Utran: Replace heat detector of exhaust end bearing tunnel.• Utran: Valve rack modification.• Fujairah: Replace the washers of ball valves in purge block.• Update the supply line of nitrogen system.• Change Drain tank sump pump counter flange as per ASME standards.• Change proximity switches in hydraulic trip unit.• Remove plugs (weldolets and thredolets) from purge block pipingAdditional Technical Support: I provided technical support to following projects as well - Khulna (Bangladesh) 170 MW equipment only: Checked the firefighting system requirements in GT auxiliaries, El-Sauz (Mexico): Responsible for contract review and creating deviation list, Terga (Algeria), 3X400 MW CCPP: Resolved GT Air Intake System issues. Show less Responsible Engineer For Aero Systems - Gas Turbines Air Intake System, Exhaust Gas System, Enclosure and ventilation, High fogging system, fogging system, evaporate cooling system, Combustor and turbine casing cooling system, Nitrogen system, Control air unit, Propane ignition system.R&D Projects - GT26B2.2 and GT26U1 Purge Block Engineering: The project aimed at improving the existing commodity and highlighting the new changes happened in the due course of time. GT26U2 Purge Block Development: The project aimed at developing a new skid with reduced number of ball valves for cost reduction and better performance. GT26U3 Control Air System: The project aimed at checking the feasibility of existing gas turbine control air unit.GT26B2.2 High Fogging Development Project: The project aimed at cost excellence. Show less

      • Lead Mechanical Engineer

        Apr 2010 - Sept 2012
      • Lead Mechanical Engineer

        Apr 2009 - Apr 2010
      • Lead Mechanical Engineer

        Feb 2007 - Apr 2009
    • Bechtel Power Corporation

      Oct 2012 - Nov 2015

      Lead Engineer, Reliance Jamnagar Expansion Project (J3 CPP) - Leading a Mechanical Team for “Reliance J3 CPP Retro-fitment Job “in Jamnagar refinery. In this position, I was responsible for identifying the detailed scope of work, prepared the micro-activity chart of the project, identify basics of the design process of this project forming design guidelines for other disciplines viz. mechanical, piping, instrumentation, and control, electrical and civil. He coordinated with project control team for effectively and efficiently project planning and scheduling.I assisted and associated with Bechtel USA team in Gas Turbine, HRSG and Auxiliary Boiler Technical Bid Evaluation and actively participated in the kick-off meeting with GE and Thermax. I formulated and issued first set of modification process flow diagram, piping and instrumentation drawing, material selection diagram and line designation table of all mechanical systems (existing flare system, demineralized water system, nitrogen system, instrument air system; high-pressure steam system, natural gas and refinery fuel gas supply system to gas turbine, heat recovery steam generator and auxiliary boiler)I led the team for Syngas Supply System, HAZOP review by the external agency. I prepared the hazop agenda and checklist as per project procedure.I assisted the plant design team in 3D model review with client and vendors. Show less

      • Lead Mechanical Engineer

        Jul 2013 - Nov 2015
      • Mechanical Engineer

        Oct 2012 - Jul 2013
    • Bechtel Oil, Gas, & Chemicals

      Nov 2015 - Sept 2017
      Senior Mechanical Engineer

      Package Responsible Engineer, British Petroleum West Nile Delta Project (BPWND) - Fire Water Pump package and Essential Diesel Generator.Role and Responsibilities:-• Preparation of data sheets and material requisition for quotation and purchase order quality requirement.• Analysing and evaluating technical bids, clearing and clarifying all technical aspects in accordance with technical requirements and preparing bid evaluation document for Client.• Leading kick-off meeting with Vendor explaining overall scope of supply, documents submittal, technical, quality, inspection, maintenance and accessibility, health, safety and environment requirements of project.• Preparing material requisition for purchase in accordance with Bechtel procurement system.• Resolving technical clarifications, Progress on project, delivery schedule etc, including scrutinizing prints for fire water pump and diesel generator package, 3D model review, shop inspections etc in close coordination with Vendor and Client Show less

    • Bechtel Mining & Metals

      Sept 2017 - Feb 2019
      Mechanical/ Piping Field Engineer

      Handled 2 contracts - 1) Casthouse Mechanical Rotating and Static Equipment Installation & 2) Six Furnaces & its auxiliaries InstallationRole:-• Responsible engineer for installation of mechanical equipment, packages and piping. • Approved method statements for Installations, Inspection and test plan, Material selection data sheets, Piping Isometrics, Test calculations etc.• Prepared field material requisitions, field change design & field service requests.• Reviewed quotations technically and prepared bid tabs. • Responsible for quality and generated quality surveillance reports.• Resolved Contractor and field supervisor’s technical queries to support construction.• Co-ordinated with other disciplines, vendor and client for resolving technical issues.• Attended field inspections as per approved inspection and test plan,• Assisted field procurement in receipt inspections of mechanical equipment and packages from suppliers.• Auditing Contractor’s quality plan.• Raised non-conformities reports.• Reported quantities after physical verification on site.• Reported Lesson learned to capture design and construction issues. Show less

    • Bechtel Corporation

      Jul 2019 - Sept 2020
      Senior Mechanical Engineer

      Working as Senior Mechanical Engineer in Riyadh Metro having Elevated and Deep Underground station My Specific Role and Responsibilities:-1) Leading team of inter-discipline engineer, architecture and designer for correcting the fire and life safety drawings requiring approval from General Directorate for Civil Defense of Riyadh2) Providing technical resolution of client queries on design of following packages – - Cold and Hot water supply system - Drainage systems - foul water, critical drainage, storm water drainage and oil interceptor drainage system. - Cooling system -Air cooled chillers, Chilled water system, Air handling units, Direct expansion units and Air Distribution System. - Station smoke management system and Staircase pressurization system. - Fire protection and detection system - Water sprinkler system, FM200 fire suppression system, Automatic dry chemical powder system and fire detection and alarm system.3) Liaised with electrical and controls disciplines for resolving technical issues of above system. Show less

    • Reliance Industries Limited

      Oct 2021 - now
      Deputy General Manager
  • Licenses & Certifications

    • Project Management Foundations: Integration

      LinkedIn
      May 2019
      View certificate certificate
    • Certified Energy Auditor and Energy Manager

      Bureau of Energy Efficiency
      Oct 2016
    • Chartered Eng

      Engineering Council
      Nov 2017