SENTHIL VELU

SENTHIL VELU

Electrical Engineer

Followers of SENTHIL VELU278 followers
location of SENTHIL VELUIndia

Connect with SENTHIL VELU to Send Message

Connect

Connect with SENTHIL VELU to Send Message

Connect
  • Timeline

  • About me

    Technical Lead at Cyient

  • Education

    • Sri Subramanya College of Engineering and Technology, Palani

      2003 - 2007
      Bachelor of Engineering (BE) Electrical and Electronics Engineering 70

      Activities and Societies: Paper presentation- Energy saving

    • Christ the king polytechnic, coimbatore

      2001 - 2003
      Diplamo Electrical and Electronics Engineering 87
    • Viswadeepthi matriculation Higher secondary school, pollachi

      1995 - 2001
      SSLC Matriculation 60
  • Experience

    • WTI Advanced Technology LTD

      Dec 2007 - Jul 2009
      Electrical Engineer

      o previewing the present design of the telecom routeso Preparing the advanced design of the telecom routes as per the present technology and standardso Designing the telecom routes and materials as per the analysis method.o Developing the Harness and wiring list.

    • CMR Design Automation P Ltd

      Aug 2009 - Apr 2011
      Application Engineer

      o Creating the schematic design.o Cable sizing, Cable ties, cable clamps, Heat Shrinks, Sleeving and Crimp material.o Developing the cable Harness.o Consideration of Backsheel connector, Tubings, Cable gland.o BOM, Cable list and Wiring list.o Creating the Electrical devices as per the OEM(Model, component and symbol)o Creating the Block diagram for the interlocking circuit like ASCV, Adaptation Cubicle, Traction circuit, relay panel and power supply panel.o Developing the detailed schematic for the interlocking circuits. Show less

    • Cyient

      Jun 2011 - Dec 2013
      Electrical Technical lead Engineer

      o Complete routing of the Train.o Placement for the Electrical component based on the Electrical Norms.o Selection of the interface connector and terminals, cable sizing and Cable gland.o Consideration of the cabinets while routing the cable to the different location.o Assigning EMC class, Bundle number, Fire protection and Operating voltage for the cable.o Preparation of Installation diagram.o Co-ordination with the Electro-mechanical team.o Generating the BOM, Cable list and Wiring list from the schematic.o Creation of the library (Components, Symbol and Model) as per the IEC and DIN standards followed by Bombardier methodology using E3 Database Library.o Creation of functional Schematic/wiring schematics and wire Harnesso 3D routing development through Catia V5.o Montage plan development ( Installation diagram) Show less

    • Bombardier Transportation GmbH

      Jan 2014 - Dec 2015
      Senior Electrical Engineer

      o Complete routing of the car.o Placement for the Electrical component based on the Electrical Norms.o Selection of the interface connector and terminals, cable sizing and Cable gland.o Consideration of the cabinets while routing the cable to the different location.o Assigning EMC class, Bundle number, Fire protection and Operating voltage for the cable.o Preparation of Installation diagram.o Production support.o Disussion with the supplier.o Co-ordination with the Electro-mechanical team.o Generating the BOM, Cable list and Wiring list from the schematic.o Creation of the library (Components, Symbol and Model) as per the IEC and DIN standards followed by Bombardier methodology using E3 Database Library.o Creation of functional Schematic/wiring schematics and wire Harnesso 3D routing development through Catia V5.o Montage plan development ( Installation diagram) Show less

    • Cyient

      Jan 2016 - now
      Technical Lead

      o Complete routing of the Train.o Placement for the Electrical component based on the Electrical Norms.o Selection of the interface connector and terminals, cable sizing and Cable gland.o Consideration of the cabinets while routing the cable to the different location.o Assigning EMC class, Bundle number, Fire protection and Operating voltage for the cable.o Preparation of Installation diagram.o Co-ordination with the Electro-mechanical team.o Generating the BOM, Cable list and Wiring list from the schematic.o Creation of the library (Components, Symbol and Model) as per the IEC and DIN standards followed by Bombardier methodology Show less

  • Licenses & Certifications

    • PLC, SCADA, AutoCAD