German Barros Ferro

German Barros Ferro

Materials & Preservation Supervisor

Followers of German Barros Ferro1000 followers
location of German Barros FerroColombia

Connect with German Barros Ferro to Send Message

Connect

Connect with German Barros Ferro to Send Message

Connect
  • Timeline

  • About me

    Project Manager

  • Education

    • Colegio Salesiano

      1994 - 1998
    • Universidad Tecnológica de Bolívar

      2002 - 2009
      Ingeniero Industrial Ingenieria
    • EdX

      2018 - 2018
      Gestión de Proyectos de Desarrollo
    • Politécnico Superior de Colombia

      2017 - 2017
      Diplomado en Gerencia de Proyectos
    • Politécnico Superior de Colombia

      2019 - 2019
      Diplomado en Interventoria y Auditoría de Proyectos
    • EdX

      2019 - 2019
      Gestión de riesgos en proyectos de desarrollo
    • Universidad Tecnológica de Bolívar

      2013 - 2014
      Especialista en Gerencia de Produccion y Calidad Ingenieria
  • Experience

    • CB&I

      Jun 2011 - Jul 2014
      Materials & Preservation Supervisor

      • Verification of standards, quality standards and certificates of different: equipment, materials and construction elements forming part in the expansion of the Cartagena Refinery. Personnel administration in search of goals and objectives for the reception of equipment and materials in different areas. • Planning and coordination of all activities related to the receipt, verification, storage, control and delivery of materials and instrumentation, piping and installation accessories, pumps and equipment.• Document control of purchase orders of instrumentation, piping and installation accessories, pumps and equipment (Purchase Orders, Bill of Landing, release orders, OS & D, etc.)• Storage and inventory of instrumentation, piping and installation accessories, pumps and equipment, keeping an immediate response to the priorities of the project installation.• Coordinate daily work activities provided under the standards of safety and productivity of the company.• Material inspection according drawings (Pi&D’s, Isometrics, Installation details, Vendor Documents and Drwaings).• Management of logistic equipment to deliver materials to the units (Forklift, telehandlers, crains, trucks)• Planning of preventive maintenance of hardware, Handle valves, instrumentation, materials and rotative and static equipment of the project.• Develop estimates of time of preventive maintenance of hardware, handle valves, instrumentation, materials and rotary and static equipment considering man hours and resources.• Planning of resources used in preventive maintenance of hardware, handle valves, instrumentation, materials and rotary and static equipment of the project. • Supervision and control of preventive maintenance activities of hardware, handle valves, instrumentation, materials and rotary and static equipment of the project. Show less

    • ICG Industrial Consulting

      Aug 2014 - May 2016

      Spareparts Project• Planning of rotating and static equipment spareparts (Drums, tanks, heat exchangers, compressors, pumps, instrumentation) for the commissioning and startup for the Cartagena Refinery Expansion Project .• Spareparts rotating and static equipment control• Review of documentation of static and rotating equipment spareparts for control and planning (equipment plans, purchase orders, receiving documents equipment data sheets).• Construction of reports of missing items, for rotating and static equipment and instrumentation making use of maintenance manuals supplied by the vendor.• Tracking preservation activities with rotary and static objects reporting conformities or deviations in the process of preventive maintenance equipment.Pipelines Chemical Cleaning Project• Planning activities according to procedures and P & IDs of each of the circuits to be cleaned chemically.• Planning activities for the assembly and disassembly of manual valves, check valves, control valves, instrumentation. Planning for dismantling involved the identification of resources to be used at each point to intervene, manpower (metalworkers, mechanics, instrumentalists), tools and equipment (cranes).• Planning logistics equipment movements for the contractor (Solarca). Programming equipment (cranes, forklift trucks) for moving the equipment contractor.• Planning and movement resources to implement chemical cleaning (energy, water).• Planning, Monitoring and control of the manufacture of the spools to be used in chemical cleaning. Spools list development, development of manufacturing orders, monitor and control manufacturing spools and pipe according to specifications.• Development of the schedule, control and monitoring of the project using Microsoft Project Show less

      • Commissioning Professional

        Aug 2015 - May 2016
      • Preservation

        Aug 2014 - Aug 2015
    • TRINGE SAS

      Mar 2017 - now
      CEO
  • Licenses & Certifications

    • Project Manager

      International Organization for Project Management™ (IO4PM™)
      Feb 2018
      View certificate certificate
    • Project Management Professional (PMP)®

      Project Management Institute
      Jan 2018
      View certificate certificate