Gerrit Scheepers

Gerrit Scheepers

HSE Consultant

Followers of Gerrit Scheepers1000 followers
location of Gerrit ScheepersEthiopia

Connect with Gerrit Scheepers to Send Message

Connect

Connect with Gerrit Scheepers to Send Message

Connect
  • Timeline

  • About me

    Project HSSE Manager, Koysha HEP, Ethiopia

  • Education

    • NEBOSH

      2017 - 2017
      International Technical Certificate Oil and Gas operational safety Occupational Safety and Health Technology/Technician Achieved
    • NEBOSH

      2019 - 2020
      International Diploma Occupational Safety and Health Technology/Technician
    • NEBOSH

      2024 - 2024
      Environmental Management Certificate Environmental/Environmental Health Engineering Pass
    • NEBOSH

      2014 - 2014
      International General Certificate Occupational Health and Safety Distiction
  • Experience

    • NOSA

      May 2013 - Jul 2014
      HSE Consultant

      OHSA Compliance Auditor and HSE Trainer

    • Training Force (Pty) Ltd

      Sept 2014 - Oct 2015
      HSE Consultant

      HSE specialist auditor and Training Centre Manager• Health & Safety Officer for Training Centre, responsible for Safety Files, Safe Work Procedure, PPE, First Aid, Fire Safety, Legal Compliance audits• Onsite audits and training.

    • WESTARCOR ENGINEERING

      Nov 2015 - Mar 2018

      Sunrise Energy project: Construction of LPG Import terminal and LPG pipeline• Construction Health and Safety officer for Westarcor Engineering, sub-contracted to Clough Murray and Roberts• Construction and laying of a 7 km LPG pipeline from the Sunrise Import Terminal to the PLEM in Saldanha bay Health & Safety Officer for Westarcor Engineering at ArcellorMittal Saldanha Steel: 35 personnel onsite contracted to the client for maintenance, installation and manufacturing programmes on the Steel Smelter plant. Plant Shut Down periods and major mechanical works: HSE supervision of 70 personnel and sub-contractors working day and night 12 hr shifts.

      • Construction Health and Safety Officer

        Mar 2016 - Mar 2018
      • Health and Safety Officer

        Nov 2015 - Mar 2018
    • WBHO Construction

      Mar 2018 - Oct 2020
      Senior Construction Health & Safety Officer

      The WBHO OTMS project entailed the construction of 12 in-ground crude oil storage tanks, each with a capacity of 170 000 m3. The inground tanks are 18m high, 100m x 100m with cast reinforced concrete walls and fixed reinforced concrete roof structures. The associated works comprised of bulk earthworks, construction of access and internal roads, storm water drainage, sewer reticulation, water supply, offices, workshops, full mechanical installation including transfer and servitude pipelines, all electrical control and instrumentation works. Show less

    • Hesper Engineering

      Oct 2020 - Nov 2020
      Health And Safety Manager

      Hesper Engineering, a subsidiary of the Sturrock Grindrod group, was contracted by Transnet Ports Authority (TPT) to perform maintenance and installation work on Tippler 2, Saldanha harbor during the October 2020 Shutdown.

    • WBHO Construction

      Feb 2021 - Apr 2023
      Construction Health and Safety Manager

      Marine, civil and electrical engineering works for the construction of the new Tug Jetty and extension of the existing Tug Jetty in the Port of Durban for client TNPA. Scope of work included dredging, diving operations, scour protection, marine piling, concrete works, installation of electrical infrastructure.

    • Lagan Dott Namanve

      Mar 2023 - Sept 2024
      Project HSSE Manager

      $ 250m Infrastructure Development Project, Kampala Industrial Business Park, on behalf of the Uganda Investment Authority ( UIA). Construction of 42km asphalt paved roads, drainage network, concrete works, potable water and sewerage network, electrical supply and CCTV. Construction of Waste Water Plant and weighbridges and the development of a SME Business park.

    • Webuild

      Sept 2024 - now
      HSSE Manager

      The $2.7 billion project, commissioned by Ethiopian Electric Power (EEP), includes: a RCC gravity dam, 170m high with a crest length of 1000 m with a 9 billion cubic meter capacity reservoir within the dam body leading to an outdoor power station housing 6 x 270 MW Francis Turbines, concrete spillway on the left side of the valley and two culverts to divert the river flow during the construction of the dam on the right side. Other permanent works include: a bridge over the Omo River and camps including facilities for the client. The project also includes the access roads, a new bridge over the river and a 400 KW transmission line from Koysha to Gibe III.​ Show less

  • Licenses & Certifications

    • ISO 45001 Internal Auditor

      ISO
      Nov 2023
    • IOSH Certified Member

      IOSH
      Nov 2023