Anuj Jindal MRICS

Anuj Jindal MRICS

Site Civil Engineer

Followers of Anuj Jindal MRICS4000 followers
location of Anuj Jindal MRICSGurgaon, Haryana, India

Connect with Anuj Jindal MRICS to Send Message

Connect

Connect with Anuj Jindal MRICS to Send Message

Connect
  • Timeline

  • Skills

    ACI Codes
    Building Information Modeling (BIM)
    Civil Engineering
    Client Billing
    Construction
    Construction Engineering
    Construction Management
    Consulting
    Contract Management
    Coordination
    Cost Management
    Digital Project Management
    Leadership
    Management
    Microsoft Project
    MS Project
    Precast Construction
    Primavera P6
    Procurement
    Project Control
    Project Estimation
    Project Management
    Project Planning
    Researching New Technologies
    Road Construction
    STAAD
    Steel Detailing
    Structural Engineering
    Tunnel Engineering
    Underground Metro
    Value Engineering
  • About me

    I have over 32 years of experience in project and construction management, and I received many commendations for timely project completion. I was also awarded a gold medal for outstanding performance in the first underground metro tunnel work in New Delhi. As a civil engineer, I occupied multiple roles in the industry, giving me a holistic view of each project whilst maintaining a meticulous approach to each task. This practice has enabled me to anticipate potential challenges, manage my teams, and successfully lead projects. I also have first-hand experience with digital construction, leveraging BIM models for scheduling (4D) and costing (5D) while staying abreast of the latest technological developments. I continue to upskill, gain more knowledge, and push my profession's and industry's boundaries.

  • Education

    • Karnataka State Open University

      -
      Master of Technology - MTech Structure Engineering First Class
    • Janardan Rai Nagar Rajasthan Vidyapeeth University

      -
      Bachelor of Technology - BTech Civil Engineering First Class
    • MIT School of Distance Education

      -
      Post graduate diploma in project management Project Management A+
    • K.R. Mangalam University

      2017 -
      PhD Scholar Civil Engineering
  • Experience

    • M/s Abhinanden Das Jain & Contractor

      Aug 1991 - May 1992
      Site Civil Engineer

      R.C.C. Over Headwater Storage Tank, Pump room, underground water tank, Diesel, and Petrol Pipeline (G.I. & C.I.) work at 510 Army Base workshops at Meerut Cantt (U.P.)

    • Public Works Department Government of Utter Pradesh

      Jun 1992 - May 1993
      Internship Trainee

      Road and Culverts work supervision

    • M/s AP Jain & Associates (Structure Design Consultant)

      Jul 1993 - Nov 1994
      Design Engineer

      Design of R.C.C. and Steel Structure with the help of STADD- III Computer software, quantity surveying, estimation, tendering, and preparation of detailed structural drawings.

    • Unitech Limited

      Nov 1994 - Mar 2001
      Construction Engineer

      M/s Unitech International Ltd. (Tripoli Post Box 91631 Libya)- 2 YearsResponsible for Organizing and managing all resources and field activities with value engineering to achieve an efficient and economic Completion of contract within the agreed time and cost whilst paying due regard to safety and meeting Quality requirements. Working experience on Primavera for project schedule submissionM/s Unitech Limited (Real Estate – Gurgaon)- 4 yearProject planning with the help of construction software, billing, quantity Surveying, quality control, and coordination of site and office activities. Show less

    • Ahluwalia Contracts (India) Ltd.

      Apr 2001 - May 2002
      Planning & Billing

      Job responsibility planning of project schedule and resources, value engineering during the construction phase, dealing with Clients, consultants, Petty Contractors, and external agencies involved in the Project, and Monitoring of expenditure, Budgets, and Cashflow.

    • IMCC Group

      May 2002 - Nov 2003
      Technical coordinators- Metro Tunnel work

      Construction of 2-number 5.7-meter diameter I.D. segment metro tunnels using Herrenknecht EPBM's. Excavated through the Delhi silt under heavily populated and traffic areas passing beneath existing subsurface structures and a mainline rail track with minimal settlement launched and received into station excavation using eye seals and ground treatment where necessary, organized launching and receiving methodology and dismantling, transporting and subsequent reinstallation of both machines. Responsible for tunnel quality assurance, the procedure was passed on to the local supervisors, and the workforce trained the local supervisors in EPBM tunnel construction methods. They have controlled the alignment of TBM using a V.M.T. guidance system and laser, chiefly involved with the ring selection. Show less

    • Larsen & Toubro

      Dec 2003 - Aug 2006
      Planning Manager

      • Preparation of Accepted cost estimate & review it through job cost report. • C.D.E. (Common Data Environment) with L&T Portal periodic updating the Project progress status.• Preparation of MPCS & monitoring them for variance• Coordination with Region/H.Q. for arranging required Materials and resources• Monitor the progress and cycle time for different Activities of work• Establishing and monitoring key control parameters like Reconciliation, labour productivity, wastage control Show less

    • DLF Limited

      Sept 2006 - Nov 2012
      Project Management Professional ( Planning & Coordination)

      Preparation of Baseline project schedule on Primavera and Microsoft project and getting approval from the Management; Preparation of Daily, Weekly & Monthly progress reports and monthly project status report presentations during monthly project progress review meetingsMeeting with clients and subcontractors for the smooth functioning of the project. I am developing a schedule for Cashflow, Resource histogram, Material, Construction equipment & staff requirement, etc.

    • Central Park

      Nov 2012 - Jun 2014
      Head of Budget & Planning

      Design, Construction, and erection of 100% Precast construction technology for Multistoried Tower (B+G+11) at Sohna Road, Gurgaon

    • Ireo Private Limited.

      Jul 2014 - Jun 2017
      General Manager- (Planning & Co-ordination) VC & MD's Office

      Project Management System establishments like Projects Planning, Projects Coordination, Projects Master Scheduling & Monitoring, and Concise Management Information systems for all Gurgaon projects.

    • M3M India Private Limited

      Jun 2017 - Apr 2019
      Sr. General Manager ( Head Budget & Planning)

      Facilitate, coordinate, consolidate, and prepare the construction budget and strive to complete the Construction within the budgeted estimate and schedule. Leading Central Planning and Budgeting dept. Of residential/Commercial/ Mix-land used projects along with Value engineering

    • Mansycom Consultants Pvt. Ltd.

      Apr 2019 - Jan 2021
      Assistant Vice President & Head Digital Project Management

      Provided consultancy and created detailed plans for BIM standards of the project in the EPC contract domain. Ensured that all quality assurance standards were followed and implemented across all the teams and sub-contractors.

    • Ascentis Group

      Jan 2021 - now

      Handling Super Highrise Commercial building Dhaka Tower (6B+38 Floors) 142,800 M2 BUA along with Pinnacle's first 40 storey Commercial Building in Dhaka, Bangladesh ( about 2000 Crore BDT Budget Projects Pioneer to Implement Digital Project Management ( BIM - 3D-4D-5D-6D-7D) at Dhaka Bangladesh Handling Super Highrise Commercial building Dhaka Tower (6B+38 Floors) 142,800 M2 BUA along with Pinnacle's first 40 storey Commercial Building in Dhaka, Bangladesh ( about 2000 Crore BDT Budget Projects Pioneer to Implement Digital Project Management ( BIM - 3D-4D-5D-6D-7D) at Dhaka Bangladesh Tallest Commercial Tower in Dhaka – Bangladesh (5 Basement, 40 Floors of office with exquisite Rooftop RestaurantUse of Aluminium system formwork (actual slab cycle 9-10 days achieved), Use of External safety working hydraulic lifting platform ( Best safety methods for Highrise construction)

      • Director -Projects

        Apr 2024 - now
      • Associate Director - Project

        Apr 2023 - Mar 2024
      • Project Head

        Oct 2022 - Mar 2023
      • Senior Project Manager

        Jan 2021 - Sept 2022
  • Licenses & Certifications

    • Certified Member (CM)

      India Building Information modelling association (R.)
      Jun 2019
    • Certified Member (CM)

      Pre Engineered structures society of India
      Jan 2014
    • Vico office user certification

      Trimble Inc.
      Jul 2019
    • Lynk Advisor

      Lynk Global
      Nov 2019
    • Certified Member (CM)

      Consulting Engineers Association of India
      Jan 2019
    • Chartered Member (MRICS)

      RICS
      Jul 2016