Hatem El-Dakroury

Hatem el-dakroury

bookmark on deepenrich
location of Hatem El-DakrouryUnited Arab Emirates
Followers of Hatem El-Dakroury842 followers
  • Timeline

  • About me

    Head of Technical Department

  • Education

    • University of alexandria, alexandria,

      1997 - 2002
      Bachelor's degree specialization in public buildings. good

      Activities and Societies: Training Due Faculty studies; - H.A..D. Office House of Architecture Design. - Architectural & Graphic designer, Shalalat group. H.A..D. Office House of Architecture Design.Preparing architectural design, presentation, working drawings for the development of Alexandria corniche & Qaietbay citadel. Architectural & Graphic designer, Shalalat group. Preparing conceptual & architectural design presentation for the design competition of the Great Egyptian Museum & several residential projects.

    • Gamal abdel nasse militry secondry school

      1992 - 1995
      High school physical sciences & mathematics excellent 89.735%

      Activities and Societies: Capetian of Mores Rifle shooting team.

  • Experience

    • B.e.c.t. office bureau egyptian de conseils techniques

      Jan 2003 - Mar 2004
      Junior architect

      Preparing Architectural working drawings for the Greater Cairo tunnel Metro, and some power stations in several countries all over Africa with Alstom contractors and coordinating those drawings with the structural & electromechanical sections prior to issuing to the contractor.

    • Af studio (alfredo freda)

      Mar 2004 - Feb 2005
      Architect

      Preparing architectural design, presentation, working drawings, interior design & shop drawings for the interior case for several marina towns like Hurghada gouna in Egypt & Tala bay in Jordan, as well as, for an office tower in Pakistan, and some apartments in Rome & Paris.

    • Saudi binladin group (sbg)

      Nov 2004 - Aug 2007

      Prepared a design proposals for several projects (SBG HEAD quarter in Cairo, Pool privacy systems Villa Omar Bin Laden Red sea, Villa Omar Bin Laden in Saudi Arabia, Jeddah). Preparing drafting and CAD rendering of Architectural shop drawings for a four stars hotel "Amira Golden Tulip Hotel" Raas Sueder, well coordinated among trades & sub contractor. Emaar Sale Center Building, Uptown Cairo, Egypt; - Lead architects in the drafting and CAD rendering of Architectural shop drawings Coordinated with (structural, electromechanical & infrastructural) Design drawings for building & roads' construction firms involved in consulting project. Completed work on time and within budget.

      • Architectural Designer

        Jul 2007 - Aug 2007
      • Architects' team leader

        May 2007 - Aug 2007
      • Principal Tecnichal Office Architect

        Nov 2004 - May 2007
    • Saudi binladin group (sbg)

      Nov 2007 - Nov 2007
      Planning analyst

      Preparing Method of Statement for Abu Sultan Pharmaceuticals Plant Warehouse Extension.

    • Dar al-handasah (shair and partners)

      Dec 2007 - Aug 2014

      Riyadh BRT “Bus Rapid Transit”.1- Principal Architects/Engineers' Group leader for Riyadh BRT project has started preparing Preliminary Design coordination with Perkins+Will (Design consultant), including stations types of (I.e. Terminus & BRT stations, as well as, Community Bus Stops & Parking Shading Devices).2- leading the stations’ Final Design & Adaptation submissions in addition to the Park & Ride sites, as well as, followed up coordination with client ADA (AR Riyadh Development Authority) including Architectural & Streetscape, due 7 travels to Riyadh for workshops among (Client, Designer, Consultant, Managers, System Coordinators, Operators …etc). Show less Mecca Haram Extension. Service Building.1- Lead team of 8 Architects preparing the SERVICE BUILDING’S 100 SECTIONS producing both (PSD files presentations & CAD files for IFC Drawings).2- Finalize Design Development of Arch. Sections (around 40 Sections) during 3 months, handling coordination of External Bridges buildings Arch. DWGs. on synchronized folder (shared between Cairo & Beirut Offices), as well as handling/coordinating it.3- Initiate Skin Drawings & design confirming for the whole Service Building, as well as, Leading team of 5 Architects preparing (Bridges, Rear Elevation, Ring Road & Tunnels) Skin Construction Drawings Package.4- Prepared terraces’ skin studies, as well as, coordinate on them Vs. designers including ring road, part underneath building, skin plan during time of 3days.5- Follow up 17 physical models (mockup or study models, partial or for the whole Haram). Show less Mecca Haram Extension. Expansion Building. Prepare architectural drawing, Photoshop presentations to be discussed with M.O.H.E. up to IFC drawings regarding Minarets & Main Gate of Mecca Haram Expansion building. Solve & Confirm Minaret’s design among the vertical circulation core’s, as well as, cleaning system requirements.1- Prepare Minarets’ base drawings; (9 plans, 4 sections & 2 Elevation) for each Minaret. 2- Prepare Main gate’s base drawings; (8 plans & 8 sections). Well-coordinated among trades up to exchange IDCs. 3- Also, assisted on the piazzas' coordination team especially with transportation on the ring road exits. Show less Princess Nora University. Princess Nora University. Worked in PNU Support team in DAR CAIRO Office Preparing;1- Design proposals for the Nursery Building.2- Skin Arch. Drawings for the HOUSING FACILITIES TYPICAL BUILDING as well coordinated among Trades. 3- Design proposals for the SMALL MOSQUE then lead architects in the drafting and CAD rendering of Architectural working drawings & Coordination among Trades.Traveled to DAR PUNE Office prior to ;1- Follow the SMALL MOSQUE four types leading architects to finalize drawings & coordination among Trades. Also, finish comments up to compile drawings for CD submission.2- Attend meetings with Perkins & Will concerning the K12 BOYS’ SCHOOL during the workshops in May & August 2009 finalizing the design development & coordination. Also, Re-evaluate the prayer area design.3- Handle two complexes – males & females – meeting Perkins & Will & Sub-consultants by workshops or video conference calls up to finish all the pending design development issues & leading architects prior to prepare IFC drawings as well coordinated among Sub-consultants – Perkins & Will, RG & Pool Designer – & Trades. Also, meeting the Contractor SBG in DAR PUNE Office.4- Re-evaluate & Enhance the prayer area’s design regarding a better space performance. Show less Dubai Residential AvenuePreparing CAD rendering of Architectural (Sections, Wall sections,Windows, curtain walls & Louvers schedules) drawings well coordinated with (structural, electromechanical & infrastructural) Design drawingsLead architects in the drafting and CAD rendering of Architectural working drawings for three towers (Rectangular, RB-05 & RA-10) in coordination with (structural, electromechanical & infrastructural) Design drawings starting from design development phase up to the final design submission.Lead architects in the drafting and CAD rendering of Architectural working drawings for three towers (RC-07, RB-05 & RA-10) in coordination with (structural, electromechanical & infrastructural) Design drawings starting from design development phase up to the IFC submission. Show less

      • Senior Architect

        Jan 2012 - Aug 2014
      • Architects' team leader

        Oct 2011 - Jun 2012
      • Architect's team leader

        Jul 2010 - Sept 2011
      • Architects' team leader

        Mar 2010 - Jun 2010
      • Architect's team leader

        Aug 2009 - Feb 2010
      • Architects' team leader

        Jan 2009 - Aug 2009
      • Architects' team leader

        Apr 2008 - Dec 2008
      • Architects' team leader

        Dec 2007 - Mar 2008
    • Engineering consultants group s.a.

      Dec 2015 - Mar 2016
      Principal architect

      Al Masah “New Capital Cairo”. 1- Principal Architects' Group leader of Alexandria Headquarters Leading Architects & Trades preparing Design Development & Coordination for four building of the project (I.e. Hotel, Office tower, as well as, two Staff Housing Buildings for Militaries/Civilians). 2- Leading the buildings’ Final Design & Construction submissions, as well as, followed up coordination with client (Minister of Militaries)

    • Rcc - ruwad civil construction

      Apr 2016 - Jun 2017
      Head of architectural development department

      Principal of Architectural Development Dept. - Leading Engineers preparing Preliminary Design & Design Development for all the company’s projects including (Real Estates, Residential & JCC Jeddah Commercial Center Office building), as well as following Technical issues/coordination projects including (Real Estates, Residential, JCC Jeddah Commercial Center Office building & JOD Jabil Omar Development phase II buildings/towers).- Complete and maintain an in-depth knowledge of the designated Projects.- Liaising with the planning department in regards to all design, engineering, production, logistic and installation scheduling, as well as, following up the sites’ progress.- Develop/Maintain projects’ schedule to request and distribute information in a timely manner and to ensure that full compliance to the contract is adhered.- Checking/Submitting for approval materials’ samples/specifications in accordance with the company policy and procedures.- Managed and monitored all sub-contractors work for compliance to their contracts.- Manage to provide solutions and well-coordinated shop drawings for the current site condition/issues – through site visits – prior to achieving construction compliance and client’s satisfaction.- Manage development of RFIs and submittals.- Assigning packages with procurement and providing technical assessment, as well as, Monitoring/Managing all vendors/sub-contractors work for compliance to their contracts. Show less

    • Crown home consultants

      Dec 2017 - May 2018
      Resident qc principal architect

      (third party for quality control), Ministries’ Buildings “New Capital Cairo”.- Preparing Reports (Daily, half Monthly & Monthly).- Review project construction documents (SPECS, BOQ & Shop drawings) prior to discuss/confirm construction method of statement with both (main consultant Dar AlHandasah Misr, Contractor Alexandria for constructions) then follow up implementation on site insuring achieving the shop drawings as per quality standards. Also, Manage to provide solutions, composite layouts and well-coordinated on site shop drawings for the current site condition/issues regarding construction compliance and client’s satisfaction.- Initiate MTL (Material Testing Lap) Monitor Materials supply & prepare documents for Materials/vendors/suppliers’ approval.- Manage site daily/temporary material storage reachable & safe locations.- Arrange & witness the on-site tests (requested by consultant) during the construction period. - Monitoring DC prepare (MIR, SIR & RFI) & follow up their development through LOGs for both (Materials & Submissions).- Monitoring Productivity & provide advises regarding Man power, as well as, Machines number.- Prepare snag list, inspecting and verifying that works has been satisfactorily completed.- Attend meeting with owner (Minister of Militaries) representative, solving issues and try to compromise without additional costs. Show less

    • Housing consulting office

      Jun 2018 - Feb 2019
      External auditor leader

      (owner side party for quality Audit & Snagging), Beyti New Juice Plant “Noubarya CAI-ALEX Desert Rd. Egypt”.- Leading specialists’ team reviewing executed works in order to outline available snags that require rectification/refinement and corrective action.- Prepare snag report covers (Architecture, Civil & MEP) works, as well as, Repair Cost Estimate for all snags -to be used in case- that current contractors will not take corrective measures.- In addition to providing a Responsibility Matrix generated upon/after arranging and presenting negotiation meetings among all parties to outline if any snags were created by main consultant (Howeedy Consult) or parties other than contractors (SIAC) as main contractor & civil works contractor of the project, (Consukorra) as a subcontractor electromechanical works.- Mentioned report outlines all snags in detail covering them in text, as well as, images going through all project’s areas prior to be followed by a detailed review of all snags in order to agree on what current contractors will actually do, what is needed to be done, and what can be neglected and has no impact on performance. Show less

    • Andalusia group for medical services

      Jan 2020 - now
      Head of technical department

      - Leading Architects/Engineers preparing Preliminary Design & Design Development, as well as, following Technical issues/coordination projects (for all the company’s hospitals in (both of Egypt & Saudi Arabia).- Complete and maintain an in-depth knowledge of the designated Projects.- Liaising with the planning department in regards to all design, engineering, production, logistic and installation scheduling, as well as, following up the sites’ progress.- Develop/Maintain projects’ schedule to request and distribute information on time and to ensure that full compliance to the contract is adhered.- Checking contacts of contractors, sub-contractors & vendors for approval in accordance with the company policy and procedures.- Managed and monitored all sub-contractors/vendors work for compliance to their contracts.- Manage to provide solutions and well-coordinated shop drawings for the current site condition/issues – through site visits – prior to achieving construction compliance and client’s satisfaction.- Assigning packages with procurement and providing technical assessment, as well as, Monitoring/Managing all vendors/sub-contractors work for compliance to their contracts. Show less

  • Licenses & Certifications

    • Bsc. architecture