Stuart M. Parker

Stuart M. Parker

Laboratory Designer/Project Coordinator

Followers of Stuart M. Parker326 followers
location of Stuart M. ParkerNew York, New York, United States

Connect with Stuart M. Parker to Send Message

Connect

Connect with Stuart M. Parker to Send Message

Connect
  • Timeline

  • About me

    Vice President at Rolst Construction Corp.

  • Education

    • NYIT

      1985 - 1987
      Architecture

      Architecture

    • NYU

      -
      Construction Management

      Construction Management

  • Experience

    • The Rockefeller University

      Jul 1986 - Jan 1991
      Laboratory Designer/Project Coordinator

      I started as a draftsman finalizing plans which were developed by the Campus Architects. I later earned a position as Laboratory Designer in which I met with researchers and doctors to develop plans and create numerous laboratory concepts. After final details and equipment planning were completed, the designs were then finalized At that point I was responsible to bid out the project, purchase the sub contractors and ultimately manage the construction.

    • Landa Acoustics

      Jan 1991 - Jan 1993
      Project Manager

      My role for this Acoustical Ceiling contractor involved the full range from Estimating, purchasing and management of the projects. Project locations inculde Pfizer Pharmaceutical, Banco Americano, Mt. Siani Medical Center, World Trade Center, Bankers Trust....

    • Morgan Construction

      Jun 1993 - Dec 2013
      Project Executive

      As Project Executive, I was responsible for multiple projects at the following locations; Weill Medical Collge of Cornell University, Mt Sinai Medical Center, Beth Israel Medical Center, Rockefeller University, Staten Island University Medical Center, NYU, NYU Medical Center, NYU Dental College, Memorial Sloan Kettering, St. Lukes Roosevelt Hospital, Columbia University, LICH, Parkway Hospital, Frank E. Campbell FH, Brookdale Hospital, Hospital For Special Surgery, NYC Blood Bank, National Organization of Industrial Trade Union, Goldman Sachs, NYCSCA. Extensive experience constructing MRI's, NMR's, Linear Accelerators, Electron Microscope Labs, Chemistry and Research Labs, Cold Rooms, Environmental Chambers, Clean Rooms, Morgue and Autopsy Suites, Psycopathic Treatment & Holding Facilities, Cage Wash Facilities, Animal Research & Holding Facilities, Animal MRI Suite, Central Sterilization Facility, Gross Anatomy Lab, Tele-Medicine Suites, Dental Operating Rooms, Examination Rooms & Support Facilities, Operating Rooms, Pre-Natal Suites, Pediatric Facilities, Conference Rooms, Office Suites, Auditoriums, Commercial Kitchens & Cafeterias, Mechanical & Equipment Rooms, Boiler Rooms. Complete gut renovations, additions and out of ground construction. Fully versed in MS Excel, MS Word, MS Project, Primavera Expedition, Procore. Show less

    • Beacon Consulting Group, Inc.

      Dec 2013 - Apr 2014
      Executive Project Manager

      Project close-out

    • Consigli Construction Co., Inc.

      Apr 2014 - Jul 2020
      Senior Project Manager

      Responsible for managing the overall out of ground construction process of a thirteen (13) - story reinforced concrete superstructure with below grade parking garage of 70,000 sq. ft., 60,000 sq. ft. of retail space and eighty seven (87) residential apartments. Exterior wall consists of brick, aluminum panels, stone and punched windows. Third floor roof is an expansive amenities space with green area, landscaping and roof pavers. Project is located next to an elevated subway platform in Williamsburg, Brooklyn, NY. Show less

    • Rolst Construction Corp.

      Oct 2020 - now
      Vice President
  • Licenses & Certifications

    • Site Safety Manager

      Safety & Quality Plus, Inc.
      Nov 2014
    • Analyzing Construction Schedules

      Saddle Island Institute
      Nov 2003
    • 10-Hr OSHA Construction Safety and Health

      Total Safety Consulting, LLC
      Nov 2010
    • Site Safety Manager

      Total Safety Consulting, LLC
      Oct 2008
    • Suretrack Project Manager

      Cashman Associates
      Jan 2001
    • NYC DOB 4-HR Supported Scaffold User Certificate

      Total Safety Consulting, LLC
      Apr 2011
  • Volunteer Experience

    • Assistant Scoutmaster

      Issued by Boy Scouts of America on May 2009
      Boy Scouts of AmericaAssociated with Stuart M. Parker
    • Scoutmaster

      Issued by Boy Scouts of America on Jun 2010
      Boy Scouts of AmericaAssociated with Stuart M. Parker