Ivan Lalic

Ivan Lalic

Urban planner

Followers of Ivan Lalic186 followers
location of Ivan LalicRussia

Connect with Ivan Lalic to Send Message

Connect

Connect with Ivan Lalic to Send Message

Connect
  • Timeline

  • About me

    Technical Bid Manager at LLC Velesstroy

  • Education

    • Univerzitet u Beogradu / University of Belgrade

      2000 - 2006
      DIA/Master of Architecture (M.Arch.) urban reconstruction 8.34
  • Experience

    • Urban planning Institute of Belgrade

      Nov 2006 - May 2017
      Urban planner

      JOB DESCRIPTION:- Team leader responsible for all the work required in every stage of the planning procedure - Cooperation with other departments at the Institute competent city public institutions and enterprises and the City’s representativesPROJECTS:- detailed plan for residential complex ''Gates of Zemun'', January 2017- detailed plan for ‘’IKL’’ residential complex w/high-rise commercial building, October 2016- spatial plan for special purpose area for project ‘’Belgrade Waterfront”, Nov 2014- detailed plan for high-rise commercial building in block 19, New Belgrade, Sept 2014- detailed plan for residential block 70, New Belgrade, December 2013- detailed plan for residential block 45, New Belgrade, December 2013- urban project for commercial building in block 66, New Belgrade, October 2012- detailed plan for Beton hala waterfront public center, August 2012- spatial plan for municipality of Surchin, February 2012- study of natural core of Belgrade, December 2011- detailed plan for ‘’Plaza’’ mixed use center in Kneza Milosa street, Belgrade, May 2011- urban project for Specialist center for MIA in Block 40, New Belgrade, April 2011- study of floating objects in Belgrade, February 2011- detailed plan for Old settlement in Zeleznik, Belgrade, July 2010- study of Belgrade high-rise, June 2010- detailed plan for sports center Ada Ciganlija, Belgrade, January 2010- study of Public spaces in Stari grad (Old town), Belgrade, October 2009- study of Belgrade scarp, September 2009- detailed plan for Kamendin settlement in Belgrade, June 2009- detailed plan for Pregrevica settlement, Belgrade, March 2009- urban concept for future city centre in Sava amphitheater, Belgrade, March 2008- Belgrade waterfronts study, 1st phase, June 2007- detailed plan for Altina 2 settlement in Belgrade Jan 2007- detailed plan for Busije settlement in Belgrade Dec 2006- detailed plan for parks in New Belgrade blocks 62 and 63, Nov 2006 Show less

    • LLC Velesstroy

      May 2017 - now

      JOB DESCRIPTION:- Preparation of Technical bids for tenders in Oil and gas projects in Russian Federation, organized by Russian and Western EPC contractors (Vinci, Technip, Tecnimont, Linde) for Russian clients (Novatek, Gazprom, Eurochem)- Participation and coordination of the entire bidding procedure - Writing of Project Execution Plan- Writing and compiling of other technical bid forms- Technical support, clarifications, meetings and presentations- Liasion with other departments inside company, subcontractors, EPC contractors and Clients- Documentation management and analysisPROJECTS:- Product Storage Loading and Marine Shipment Terminal (PSL and MOT) EPC tender package for Ust Luga Ethane-rich Gas processing facility at Ust Luga - LNG tank farm, inlet and marine loading facilities at Ust Luga, Russia (Client: RusKhemAlliance/Gazprom, Year: 2022)- GWP5A tender package for Arctic LNG 2 project - Hook-up of LNG train modules on GBS, Murmansk and Gydan peninsula, Russia (Client: Arctic LNG 2/Novatek, EPC contractor: NovaEngineering/Technip and Nipigaz, Year: 2021)- Ammonia and urea production plant for Kingisepp 2 project - Full scope of work for Ammonia and urea production plant at Kingisepp, Russia (Client: Eurochem, EPC contractor: Tecnimont, Year: 2021)- AWP1 tender package on Arctic LNG 2 project - production of 4 modules for LNG train on GBS (Gravity Based Structure), Murmansk and Gydan peninsula, Russia (Client: Arctic LNG 2/Novatek, EPC contractor: NovaEngineering/Technip and Nipigaz, Year: 2020)- CWP3A tender package for Arctic LNG 2 project - Mechanical, electrical and instrumentation works for onshore LNG facility on Gydan peninsula, Russia (Client: Arctic LNG 2/Novatek, EPC contractor: NovaEngineering/Technip and Nipigaz, Year: 2019)- CWP2B tender package for Arctic LNG 2 project - Civil works for onshore LNG facility on Gydan peninsula, Russia (Client: Arctic LNG 2/Novatek, EPC contractor: NovaEngineering/Technip and Nipigaz, Year: 2018) Show less JOB DESCRIPTION: - Preparation of Technical bids for tenders in Oil and gas projects in Russian Federation, organized by Russian and Western EPC contractors (Vinci, Technip, Tecnimont, Linde) for Russian clients (Novatek, Gazprom, Eurochem)- Participation in the entire bidding procedure - Writing of technical bid forms- Technical bid compiling and submission- Technical support, clarifications, meetings and presentations- Liasion with other departments inside company, subcontractors, EPC contractors and Clients.- Documentation management and analysis Show less

      • Technical Bid Manager

        Jun 2020 - now
      • Technical bid lead specialist

        Dec 2017 - Jun 2020
      • Technical bid specialist

        May 2017 - Dec 2017
  • Licenses & Certifications

    • Licensed urban planning engineer

      Serbian Commerce of Engineers
      Jan 2012
  • Honors & Awards

    • Awarded to Ivan Lalic
      Annual award for Exceptional results at the beginning of the professional career Serbian chamber of Engineers (http://www.ingkomora.rs/eng/?id=indexeng) Jun 2015 http://www.ingkomora.rs/vesti/?id=15-06-2015-002
  • Volunteer Experience

    • Steward on Eurobasket 2005

      Issued by FIBA on Sept 2005
      FIBAAssociated with Ivan Lalic