Tumpal Pangihutan Sirait

Tumpal Pangihutan Sirait

Followers of Tumpal Pangihutan Sirait304 followers
location of Tumpal Pangihutan SiraitKecamatan Serang, Banten, Indonesia

Connect with Tumpal Pangihutan Sirait to Send Message

Connect

Connect with Tumpal Pangihutan Sirait to Send Message

Connect
  • Timeline

  • About me

    General Affairs Director at PT Guohua Taidian Pembangkitan Jawa Bali

  • Education

    • Universitas Sam Ratulangi

      2019 - 2021
      Postgraduate Degree Human Resources Development
    • Institut Teknologi Sepuluh Nopember (ITS)

      2021 - 2021
      Program Profesi Insinyur
    • Universitas Pembangunan Nasional Veteran Jakarta

      -
      Bachelor's degree Mechanical Engineering
  • Experience

    • PT. Pembangkitan Jawa Bali

      Oct 1992 - Jan 2013

      Indramayu coal fired power plant capacity 330 MW x 3 is once of government fast track project, used low rank coal calory, electric produced sent with 150 kV transmission grid. Commercial Operation Date of plant year 2011. Joint since construction, erection, commisioning and finally COD. Member of commisioning team from PLN JASER for mechanical equipment. After first firing of Unit #1- #3, warranty period, FYI join in Operation division as Senior Supervisor. Coordination, control and maintain operation staff from Jetty until CCR 41 peoples and 3 helpers. Deploy and divide each staff as their main job. Arrange morning meeting in CCR before hand over everyday. Show less

      • Senior Supervisor

        May 2008 - Jan 2013
      • Senior Operator

        Oct 1992 - Aug 2008
    • PT KOMIPO PEMBANGKITAN JAWA BALI

      Jan 2013 - Jan 2017
      Shift Leader

      Tanjung Jati B34 coal fired power plant capacity 660MW (net) x 2, located at Tubanan district, Jepara Central Java Province. This plant used coal as main fuel with middle rack coal calory and HSD as start up in boiler furnace. Electric produced sent with transmission grid 525kV (SUTET grid) to Java Bali interconnection grid and 150kV (SUTT grid) grid to Jepara District. Central Java Power company as asset owner, PLN as asset manager and Komipo Pembangkitan Jawa Bali as asset operator. Main equipment as Boiler Steam Generator supplied from Mitsubishi. Heavy Industry Japan and Steam Turbine and Generator from Toshiba Japan also.Since February 2013 my head office company PT Pembangkitan Jawa Bali dispatched to Jepara as Shift Leader full responsibility, maintain and conducted all staffs to achieve all operation target as Key Performance Index and ensure all equipments operate in normal condition. 11 personels staff distributed as 2 Operators for Unit Control, 2 Operators for Auxiliary Unit Control , 2 Operators for Turbine Local, 2 Operator for Boiler Local Operator, 1 operator for Fue Gas Dezulfurization, 1 Operator for Water Treatment Plant and 1 Operator Waste Water Treatmen Plant. During three years since joined at TJB34B this power plant could reached and exceed the target. Our target as KPI are Equivalent Availibity Factor ( EAF), Net Plant Heat Rate (NPHR), Equivalent Forced Outate Factor (EFOF), and Fuel Oil Consumption (HSD).After shift work made a report contain all activities during shift work, in morning and evening send message to General Manager, all Managers and relatied parties due to list member. in case of emergency communication directly to General Manager. Show less

    • PT. Pembangkitan Jawa Bali

      Jan 2017 - Aug 2018

      Ensuring ongoing activities of the Performance and Efficiency to improve reliability, readiness and efficiency of power plant which managed by PT Pembangkitan Jawa BaliMain Duties and Responsibilities1. Ensure the preparation, evaluation, renewal program and the Efficiency Road Map/Heat Rate and Performance2. Ensure the continuity of data acquisition and operating parameter data all of the plants managed by PT PJB 3. Ensuring the availability of the procedure (SOP) for operations and commissioning / re-commissioning are always updated 4. Ensuring the availability of methods, tools guidance, modeling and systems needed to perform the analysis of the efficiency and performance according to international standards that implemented to all of the plants5. Ensure the analysis of the efficiency and performance of all the plant6. Ensuring evaluation and recommendations based on the analysis and performance to all of the plants which managed by PT PJB7. Ensure and evaluation commissioning and re-commisioning of the plants and meet the SLO8. Ensure optimize the usage of water, chemicals, and primary energy (fuel) and coodination with process engineer9. Handle and conduct the function of management, supervision, control and coordination of activities throughout the Performance and Efficiency10. Identify the risks and mitigation programs due to Performance and Efficiency responsibility. Show less Main Job and Responsibility1. Evaluate the operating performance targets of Unit Jasa O&M under the coordination of the Directorate of Operations 2 and ensure Company's Long Term Plan (RJPP) and the Company Work Plan and Budgetting (RKAP)2. Evaluate the performance Unit Jasa O&M under the coordination of the Directorate of Operations 2 (including Power Purchase Agreement contract)3. Evaluate Operation planning of Unit Jasa O&M under the coordination of the Directorate of Operations 2 based on a the Power Purchanse Agreement (PPA)4.Evaluate and monitoring performance monitoring Unit Jasa O&M under the coordination of the Directorate of Operations 2 ans ensure optimize economical electricity production cost 5. Monitoring and evaluate the effectiveness of the implementation of the Asset Management in UnitJasa O&M and optimizing the operating performance Unit Jasa O&M under the coordination of the Directorate of Operations 26. Monitoring and evaluation planning and realization of the cost of operating and operation budgets of Unit Jasa O&M under the Directorate of Operations 27. Conduct literature study, discussion group of Unit Jasa O&M under the coordination of the Directorate of Operations 2, including feasibility studies and financial perspective related to operating programs8. Serve external and internal customers company partners, unit, AP / PA and also shareholders, through support for the implementation of the Corporate Culture (PJB Way), and Management System applied by the company (SIT, GCG, PJM IMS, Baldrige Criteria , SMK3, Maturity Business Process Level), in line with the Company Vision and Mission9. Identify the risks and mitigation work activities due Planning and Evaluation Operations 2 responsibility Show less

      • Engineer Performance and Efficiency

        Jun 2017 - Aug 2018
      • Operation Planning and Evaluation Analyst

        Jan 2017 - Jun 2017
    • PT Eleska Hakit

      Jun 2018 - Mar 2024
      Assessor
    • PT Pembangkitan Jawa Bali Services (Official)

      Aug 2018 - Oct 2022
      Plant Manager

      PLTU SULAWESI UTARA 2 located at Tawaang village, Amurang South Minahasa Major, Coal fired power with capacity 2 x 25 MW with CFB Boiler. Power Plant built by Wijaya Karya and first Commercial Operation Date on 2012. Asset owner by PT PLN (Persero), Asset Manager by PT PLN UIKL Sulawesi and Asset Operator by PT PJB. PJB has taken over this power plant since 2014. Contribution of this power plant to SULUT GO 150kV Transmission grid around 11.2%. Boiler type is Circulating Fluid Bed and use low rank coal calorie as main fuel and also bed material for heat transfered in furnace. This power plant is a part of 10000MW fast track project (FTP 1). As an O&M company, PJB Services has dedicated and fulfill with 168 employees consist of Operation Division, Maintenance Division, Human Resources, Procurement, Health Safety and Environment. During as an O&M Company for PLTU Sulut 2, PT PJB Services has got any achievement such Zero Accident from North Sulawesi Governor 2019, SMK3, ISO 45001, ISO 9001, ISO 17025, ISO 14001.Other achievement and reward:1. The best of Power Plant Performance of Sulawesi, Maluku, Papua and Nusa Tenggara Region from PLN on 20202. Zero Accident from Ministry of manpower and Transmigration on 20203. The 3rd position of Equivalent Avalibility Factor of the power plant which operated by PJBS the half year of 20194. The end of 2019 the 1st of Equivalent Availibility Factor of the power plant which operated by PJBS5. The best of Equivalent Availibility Factor of the power plant region of Sulawesi from PLN on 2019 6. The best of Power Plant Performance of PT PJBS on 20197. The best of Power Plant Performance of region of Sulmapana on 2021 from PLN Head Office in 20208. The best of Power Plant coal consumption region of Sulmapana on 2021 from PLN Head Office in 2021those achievement dedicated to all of employees, together we can, and together reach the dream.From Amurang to Indonesia with AKHLAK as core values Show less

    • PT Guohua Taidian Pembangkitan Jawa Bali

      Oct 2022 - now
      General Affairs Director

      GHPJB as Operation and Maintenance Company of Jawa-7 Coal Fired Power Plant with capacity 2 x 1050MW, advance boiler technology with ultrasuper critical, higher boiler efficiency and also lower coal consumption and lower emission. Electric generated connected with SUTET 500kV Jawa Bali transmission grid. Power Plant located at Serang regency, Banten Province. Boiler of this power plant also equipped with Wet Flue Gas Desufurization to reduce SOx and NOx emissions. Contribution of this power plant 5-6 % for Jamali Grid system. This Boiler designed with low rank calorie value and mostly available in Indonesia. asa long as operation after Commercial Operation Date, this power plant operate with high reliability and high performance, this is indicated by Merit Order in Top 10 in Allocation Energy Meeting in all of the power plant in Java- Bali Grid. This power plant owned by joint venture company between China Energy and PLN Nusantara Renewables on behalf of PLN Nusantara Power with share composition 70% and 30%. There are several achiement from Global and Domestic, or goverment such Asia Power Award, Subroto Award, Human Capital Award, Zero Accident and other. Company also implemented ISO 9001-2015 for Quality Management, ISO 14001-2014 for Enviroment Management, ISO 17025-2015 for Coal Laboratory Analysist, SMK3 and SMK2. Show less

    • PT SKP Tenaga Listrik

      Mar 2024 - now
      Asesor

      Asesor Muda Tenaga Teknik Pembangkit Tenaga Listrik yang berfungsi menguji para asesi Tenaga Teknik Operasi dan Pemeliharaan Pembangkit Tenaga Listrik sesuai dengan standar yang telah ditetapkan oleh Dirjen Ketenagalistrikan. Para asesi yang dinyatakan kompeten dapat melaksanakan tugas di pembangkit listrik diberikan sertifikat kompetensi sesuai dengan kompetensinya. Hal ini sesuai dengan amanat UU No 30 Tahun 2009 Tentang Ketenagalistrikan, khususnya pasal 44 ayat 2 dan ayat 6.

  • Licenses & Certifications

    • APM end user

      General Electric global
      Feb 2017