Eslam Shawky

Eslam Shawky

Quality Control Supervisor

Followers of Eslam Shawky6000 followers
location of Eslam ShawkyCairo, Egypt

Connect with Eslam Shawky to Send Message

Connect

Connect with Eslam Shawky to Send Message

Connect
  • Timeline

  • About me

    Senior QC Engineer - Electrical at Elsewedy Electric Power Systems Projects

  • Education

    • IRCA Global

      2019 - 2019
      ISO 9001:2015 Lead Auditor Certified Quality Management System

      Activities and Societies: Quality Management System

    • El-Nokrashi Secondary Military School

      2009 - 2012
      High school degree with Excellent grade (98%) Mathematics and physics Excellent (98%)
    • Ain Shams University

      2013 - 2017
      Bachelor of Electrical Power and Machines Engineering with grade Excellent with honors Electrical Power, Electrical Machines, Power Electronics, Control and Automation Excellent with honors
  • Experience

    • Alwaseet الوسيط

      Oct 2013 - Oct 2017
      Quality Control Supervisor

      Worked as a quality supervisor

    • ( شركة المقاولات المصرية ( مختار إبراهيم

      Jul 2015 - Sept 2015
      Electrical Construction Engineer ( trainee )

      Oversaw the electrical installations of the extension of a water treatment plant under the supervision of Siemens Co. and I have been gained the below benefits:-Gained exposure to the control and scada system in the plant under the help of Mettito Co.-observed the maintenance of the machines in the industry.

    • Egyptian Radio And Tv Union Ertu

      Sept 2015 - Sept 2015
      Design & Automation Engineer ( Trainee )
    • EGYCET "الشركة المصرية للتدريب الهندسى"

      Jan 2016 - Mar 2016
      Training Course

      Electrical power distribution course

    • Schneider Electric

      Mar 2016 - Jul 2016

      -Gained exposure to the MV network design & MV switchgear & MV protection equipment & MV earthing system photovoltaic (PV) system design.-Identified the LV protection equipment & LV earthing system.-Witnessed the KNX system used in green buildings.

      • Electrical Engineering Intern [Energy University]

        Jul 2016 - Jul 2016
      • Online courses ( energy university)

        Mar 2016 - Jun 2016
    • ( شركة المقاولات المصرية ( مختار إبراهيم

      Jun 2016 - Jul 2016
      Electrical Construction Engineer ( trainee )

      Oversaw the electrical installations of the extension of a water treatment plant under the supervision of Siemens Co. and I have been gained the below benefits:-Gained exposure to the control and scada system in the plant under the help of Mettito Co.-observed the maintenance of the machines in the industry.

    • JELECOM

      Jun 2016 - Jun 2016
      Training Course

      Revit MEP course

    • (E.E.T.C ) employee lounge

      Jul 2016 - Jul 2016
      Technical Trainee

      Gained exposure to the transmission network and observed its maintenance.

    • EGEMAC

      Aug 2016 - Aug 2016
      Technical Trainee

      Identified the protection and measuring equipment used in the power system and Oversaw the process of producing them.

    • GUPCO

      Aug 2016 - Sept 2016
      Maintenance Engineer (trainee)

      -Gained exposure to the electrical power system in the site and how to determine the faults and how to maintain it.-Observed the maintenance of the machines in the industry.-Observed The synchronization of the synchronous generators.

    • El Nasr transformers and electrical products (El-MACO)

      Sept 2016 - Sept 2016
      Design and production engineer [trainee]

      •Oversaw the process of producing transformers.

    • Sprea Misr & Plastichem Co. for Chemicals and Palsitics

      Sept 2016 - Sept 2016
      Maintenance Engineer [trainee]

      •Observed the mechanical and electrical maintenance of the machines in the industry ( Preventive, Predictive & Corrective ) and how to determine the faults and how to maintain it.•Design the control circuits of the machines.

    • Schneider Electric

      Nov 2016 - Sept 2017
      Internship (graduation project sponsorship)

      The main and sub graduation project have been Sponsored by Schneider Electric and i got sessions in the company headquarters.Main graduation project was about Energy management of industrial loads and I have been gained the below benefits:•Gained exposure to variable speed drive programming (Altivar VSD) ,electrical loads such as pumps and conveyors and studies to decrease energy in these loads, PLC programming and energy management techniques.Sub graduation project was about Low voltage Distribution of a hotel and I have been gained the below benefits:•Gained exposure to lightning design, normal and power sockets design , cable selection, cable routing , circuit breaker selection, selectivity of circuit breakers and low voltage panel design. Show less

    • HA consulting group

      Jun 2017 - Sept 2017
      Trainee (Industrial control)

      •Gained exposure to classic control Design and PLC programming ( Siemens, LS, Schneider and xinji) & Scada & HMI programming & Panel designing, communication and electrical network & Variable speed drive programming.

    • ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS

      Nov 2017 - Nov 2018
      QC Engineer - Electrical

      Project : Beni Sueif 4800 MW Combined Cycle Power PlantResponsibilities: • Reviewed all the projects’ specifications related to the scope of work.•Inspected all the electrical works executed in module 40 [Steam turbine] such as power & distribution transformers, medium & low voltage switchgear, generator circuit breaker, isolated phase bus duct,... etc. against the project specifications, latest approved drawings and QC standard and procedures. module 40 energized successfully on time and handed over to the client.• Checked the daily inspection requests by carrying out the internal inspection, forwarded inspection notice to the client and handed over the installed equipment to the client successfully.• Inspected all the delivered materials to the site to ensure that the materials completely matched with approved materials as well as the project specifications.• Issued NCR whenever a non-conformance has been found and pushed the construction team to close all NCRs before energization. Show less

    • ELSEWEDY ELECTRIC POWER SYSTEMS PROJECTS

      Jul 2019 - now

      Project: Julius Nyerere Hydropower Project with 2115 MW capacityResponsibilities:•Full responsibility for following the manufacturing, performing Expediting visits, performing factory acceptance tests and performing site inspections on power house, switchyard and main dam electrical equipment such as hydro generator, turbine governor system, Excitation system, GSU transformers, CTs, CVTs, shunt reactors, …. etc.•Review all the projects’ specifications related to the scope of work, prepare site test procedure and site inspection and test plan and review supplier's quality documents for power house, switchyard and main dam electrical equipment.• Perform Inspection on all the executed electrical works at the site against the project specifications, the latest approved drawings and QC standards and procedures.• Finalize the daily inspection requests by carrying out the internal inspection, forwarding inspection notice to the client and handing over the installed equipment to client successfully without any comments• Perform Inspection on all the delivered materials to the site to ensure that the materials completely match with approved material as well as the project specifications.• Assist in vendor list preparation and coordinate a pre-qualification audit to evaluate the suppliers before the PO issuance.• Assist in the project schedule development and work collaboratively with the project team to ensure the timeliness of purchase orders. Expedite and coordinate with all departmental colleagues to ensure that the supplier understood and complied with purchase order requirements.• Issue NCR whenever a non-conformance has been found and make follow up to close it. Show less Project : Elco Steel 220/33/33KV & 500MVA substation.Responsibilities:•followed the manufacturing, performed expediting visits and factory acceptance tests on all equipment such as250 MVA transformers, auxiliary and zigzag transformers, SWGRs, …… etc. and all equipment delivered to the site before the contractual delivery dates by following the purchase orders and executing appropriate corrective actions when necessary to ensure that all suppliers will meet the critical milestones.•Reviewed all the projects’ specifications related to the scope of work, prepared site test procedure and site inspection and testing plan and reviewed supplier's quality documents for all electrical equipment.•Inspected all the executed electrical works at the site against the project specifications, latest approved drawings and QC standards and procedures.• Checked the daily inspection requests by carrying out the internal inspection, forwarded inspection notice to the client and handed over the installed equipment to the client successfully.• Inspected all the delivered materials to the site to ensure that the materials completely match with approved material as well as the project specifications.• Issued NCR whenever a non-conformance has been found and followed with the construction team to close all NCRs before energization.•Completed the project four months ahead by expediting the materials delivery time and worked collaboratively with the project team to ensure the timeliness of purchase orders. Expedited, coordinated and interfaced with all departmental colleagues to ensure that the supplier understood and complied with the purchase order requirements.•Closed all warranty claims and punch points successfully with the owner. Show less Projects:1-The Arab contractors and Elsewedy Electric Joint Venture Head Quarter2- Elsewedy electric PSP Head Quarter (HQ-B)Responsibilities:•Reviewed the projects’ specifications and prepared the quality procedures and inspection and test plan for all MEP work activities.•Inspected the delivered materials and MEP works against the project specifications and QC standards and procedures.•Issued Non-Conformance Report [NCR] for all non-conformances and pushed the construction team to close all the NCRs.•All MEP works completed successfully on time according to the project quality requirements. Show less

      • Senior QC Engineer - Electrical

        Jun 2024 - now
      • Senior QC Engineer - Electrical

        Aug 2020 - Jul 2024
      • Project & Site Manager

        Jan 2020 - Sept 2020
      • Elec QC Engineer & Vendor Shop inspection and Expediting Engineer

        Oct 2018 - Feb 2020
      • Acting as site QC Manager [MEP]

        Jul 2019 - Jan 2020
    • Julius Nyerere Hydropower Project

      Aug 2020 - Jul 2024
      Senior QC Engineer - Electrical

      Company: The Arab Contractors and Elsewedy Electric Joint Venture (JVACEE), Project: Julius Nyerere Hydropower Project with 2115 MW capacityResponsibilities:•Full responsibility for following the manufacturing, performing Expediting visits, performing factory acceptance tests and performing site inspections on power house, switchyard and main dam electrical equipment such as hydro generator, turbine governor system, Excitation system, GSU transformers, CTs, CVTs, shunt reactors, …. etc.•Review all the projects’ specifications related to the scope of work, prepare site test procedure and site inspection and test plan and review supplier's quality documents for power house, switchyard and main dam electrical equipment.• Perform Inspection on all the executed electrical works at the site against the project specifications, the latest approved drawings and QC standards and procedures.• Finalize the daily inspection requests by carrying out the internal inspection, forwarding inspection notice to the client and handing over the installed equipment to client successfully without any comments• Perform Inspection on all the delivered materials to the site to ensure that the materials completely match with approved material as well as the project specifications.• Assist in vendor list preparation and coordinate a pre-qualification audit to evaluate the suppliers before the PO issuance.• Assist in the project schedule development and work collaboratively with the project team to ensure the timeliness of purchase orders. Expedite and coordinate with all departmental colleagues to ensure that the supplier understood and complied with purchase order requirements.• Issue NCR whenever a non-conformance has been found and make follow up to close it. Show less

  • Licenses & Certifications

  • Honors & Awards

    • Awarded to Eslam Shawky
      Spark Recognition of 2019's Second Quarter Elsewedy Electric PSP Jul 2019 Awarded with Spark Recognition of 2019's Second Quarter.